By Mario Bailey Last checked

It depends entirely on where you live, and the differences are larger than most national guides admit. We read the code, ordinance, or fee schedule published by each of 137 US counties and cities and recorded what it actually says.

Where are you building?

The rule is set locally and the spread is wide, so start with your own jurisdiction. We have read the published rule in 137 of them.

The short answer

Of the 137 jurisdictions where we have confirmed the rule, 100 require a permit outright, 37 require one only in certain conditions.

What an electrical permit costs

131 of our electrical permit rows carry a fee answer taken from the jurisdiction's own published schedule, across 131 localities. There is no single number to quote, and not because we did not look: jurisdictions price this permit in genuinely different ways. Some charge a flat fee, some a percentage of the job's assessed valuation, some a rate per square foot, and some do not price it at all because the work is permitted by a state agency or a utility instead. Each row below is that jurisdiction's own wording.

Locality What the schedule says
Kansas City Missouri Electrical permits for one- and two-family detached dwellings are priced from the same valuation table as every other...
Gwinnett County Georgia Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024".
Charlotte County Florida At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a...
Charlotte North Carolina Electrical permits are charged as a trade permit under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 in...
Mesa Arizona A stand-alone electrical permit is valuation based on the same Residential Rate Table, $220 minimum for the $0 to...
Pittsburgh Pennsylvania 2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value...
El Paso Texas FY 2026 Schedule C Departmental Fee List, Planning & Inspections, Electrical Permits: "Base fee, ea.
New York City New York Table 28-112.2 item 16, "Permit for electrical work," is "As provided by department rules." Those rules are 1 RCNY...
Columbia South Carolina Electrical work at a one or two family dwelling is priced under Code of Ordinances Sec.
Henrico County Virginia Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per...
Collier County Florida Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review Fees: valuation up to...
Mecklenburg County North Carolina Electrical trade permit priced off total construction value with a $59.70 minimum for projects not requiring plan...

A sample of the schedule-verified rows. Full figures, sources, and dates are on each locality's page, and the whole fee study is at what building permits cost.

Electrical Permit rules by state

27 states, 137 counties and cities. Pick your state for the locality-by-locality comparison, or go straight to your county.

State Localities Required Conditional Not required Thresholds published
Florida 28 25 3 0 None published
California uniform 14 14 0 0 None published
Virginia 12 9 3 0 None published
Texas uniform 10 10 0 0 None published
Arizona 8 5 3 0 None published
Washington uniform 8 8 0 0 None published
New York 5 2 3 0 None published
Georgia 4 3 1 0 None published
Maryland 4 3 1 0 None published
Michigan 4 1 3 0 None published
North Carolina 4 1 3 0 None published
Ohio 4 2 2 0 None published
Colorado 3 2 1 0 None published
Tennessee uniform 3 3 0 0 None published
Illinois uniform 2 2 0 0 None published
Indiana uniform 2 0 2 0 None published
Louisiana 2 1 1 0 None published
Massachusetts uniform 2 2 0 0 None published
Minnesota uniform 2 2 0 0 None published
Missouri uniform 2 0 2 0 None published
Nevada uniform 2 2 0 0 None published
New Jersey 2 1 1 0 None published
Oklahoma uniform 2 0 2 0 None published
Oregon 2 1 1 0 None published
Pennsylvania 2 1 1 0 None published
South Carolina uniform 2 0 2 0 None published
Wisconsin uniform 2 0 2 0 None published

A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.

How electrical permits work, start to finish

Applying

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

Inspections and close-out

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

General practice; your locality's page carries its own process, fees, and portal. Sources: International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted), International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions.

Find the electrical permit rule where you live

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

Planning more than an electrical permit? Check your whole project