It depends entirely on where you live, and the differences are larger than most national guides admit. We read the code, ordinance, or fee schedule published by each of 148 US counties and cities and recorded what it actually says.

Where are you building?

The rule is set locally and the spread is wide, so start with your own jurisdiction. We have read the published rule in 148 of them.

The short answer

Of the 148 jurisdictions where we have confirmed the rule, 109 require a permit outright, 39 require one only in certain conditions.

What an electrical permit costs

142 of our electrical permit rows carry a fee answer taken from the jurisdiction's own published schedule, across 142 localities. There is no single number to quote, and not because we did not look: jurisdictions price this permit in genuinely different ways. Some charge a flat fee, some a percentage of the job's assessed valuation, some a rate per square foot, and some do not price it at all because the work is permitted by a state agency or a utility instead. Each row below is that jurisdiction's own wording.

Locality Pricing model What each electrical permit schedule says Verified
Chandler Arizona By valuation Fee schedule sets a flat $100 fee only for electrical service upgrades of 400 amps or less per 4.6.4(b), other... schedule 6 Jul 2026
Gilbert Arizona Flat fee Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026) schedule 19 Jul 2026
Maricopa County Arizona Flat fee Flat rate by residential service size, $50 for 1-200 amps, $75 for 201-400 amps, $120 over 400 amps, per the Summary... schedule 18 Jun 2026
Mesa Arizona By valuation A stand-alone electrical permit is valuation based on the same Residential Rate Table, $220 minimum for the $0 to... schedule 17 Jun 2026
Peoria Arizona By valuation Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025) schedule 19 Jul 2026
Phoenix Arizona By valuation Electrical permits have no dedicated fee line, they are valuation-based building permits under Table A, minimum $195... schedule 18 Jun 2026
Pima County Arizona Flat fee Flat fee tiered by scope: minor work such as a service upgrade, reconnect, or up to five new circuits is $27, moderate... schedule 6 Jul 2026
Scottsdale Arizona Flat fee Typical single-family electrical work (rewire, panel relocation, service upgrade to 400 amp) is a no-plan-review... schedule 18 Jun 2026
Alameda County California By valuation Building Inspection Department Service Fee Schedule (Schedule A, effective July 1, 2024): where electrical work is... schedule 15 Aug 2026
Contra Costa County California By valuation Land Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum." Electrical inspection fees for an... schedule 15 Aug 2026
Fresno County California Flat fee Section 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each schedule 15 Aug 2026
Los Angeles California Flat fee Itemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under... schedule 17 Jun 2026
Los Angeles County California Per unit Electrical Code Fee Schedule (Title 27 of the County of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026:... schedule 15 Aug 2026
Orange County California By valuation Electrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27 schedule 15 Aug 2026
Riverside County California Flat fee Residential Electrical (BEL-RELE): $448.20 fixed fee schedule 15 Aug 2026
Sacramento California Flat fee Flat $105 permit fee for one-trade minor electrical work such as a panel change-out, rewire or new circuit, plus a 10%... schedule 18 Jun 2026
Sacramento County California By valuation No electrical line item is published schedule 15 Aug 2026
San Bernardino County California Flat fee County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026: "Meter change out and upgrades... schedule 15 Aug 2026
San Diego California Per unit Billed per circuit or panel under IB-103 Table 2 effective May 2026: circuits 15-45 amps $176.57 for the first 5... schedule 17 Jun 2026
San Diego County California Flat fee PDS 613 (effective 07/10/2026, FY 25/26) line item "Electrical Only": Permit Fee $392.00, no plan review fee schedule 15 Aug 2026
San Jose California Flat fee Greater of $315 per hour of required inspection time or an itemized fixture-based schedule, charged in addition to the... schedule 17 Jun 2026
Santa Clara County California Flat fee Under the county's Building Section Services Fee Schedule effective July 1, 2025 the electrical inspection hourly rate... 15 Aug 2026
Aurora Colorado Flat fee On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)") the line item "Residential... schedule 16 Aug 2026
Denver Colorado By valuation Valuation-based fee per CPD Table 1 with a $20 minimum for work valued at $500 or less schedule 17 Jun 2026
Jefferson County Colorado By valuation Electrical permits not tied to an active building permit bill on the countywide valuation fee table with a $55 minimum... schedule 6 Jul 2026
New Castle County Delaware By valuation Set by the State-licensed inspection agency or the State homeowner permit schedule 3 Oct 2026
Sussex County Delaware By valuation Set by the licensed inspection agency, not the county schedule 3 Oct 2026
Alachua County Florida By valuation No electrical-specific flat fee is published schedule 13 Aug 2026
Brevard County Florida By valuation Brevard's Residential Electrical Permit Application fee table lists a Building Code Review fee of $75.00 for the first... 8 Aug 2026
Broward County Florida By valuation Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.30 of the Building... 18 Jun 2026
Charlotte County Florida By valuation At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a... 8 Aug 2026
Clay County Florida Flat fee FY24/25 Building Fee Schedule, Electrical Permits (Section 208.2), effective January 1, 2025: new residential/mobile... schedule 13 Aug 2026
Collier County Florida Per unit Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review Fees: valuation up to... schedule 8 Aug 2026
Hernando County Florida Flat fee Electric, Other: $165.00 schedule 13 Aug 2026
Hillsborough County Florida Flat fee Residential Electrical (General) trade permit fee is $130 flat for inspection-only work with no plan review, full fee... schedule 18 Jun 2026
Jacksonville Florida Flat fee City Fees schedule (Municipal Code Section 320.409), Electrical Permit Fees, new single-family residential occupancy:... schedule 8 Aug 2026
Lake County Florida Per unit Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square... schedule 13 Aug 2026
Lee County Florida Flat fee Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational... schedule 19 Jul 2026
Leon County Florida Per unit Fee Schedule, Residential Plan Review/Inspection (sq ft based): Electrical Plan Review $0.10 per sq ft, Electrical... schedule 13 Aug 2026
Manatee County Florida Flat fee Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046):... schedule 8 Aug 2026
Marion County Florida Flat fee Res Electrical Scope: $100.00, per Resolution 25-R-295 (effective Oct schedule 8 Aug 2026
Miami-Dade County Florida Per unit Residential wiring for new construction, additions, repairs and alterations is $0.11 per square foot of the master... schedule 18 Jun 2026
Orange County Florida Flat fee Minimum Electrical Permit fee is $38 flat, scaling with service amperage for new or upgraded service, for example $75... schedule 18 Jun 2026
Osceola County Florida Flat fee Appendix A's Electrical Permit Fees section lists a $125.00 base fee, plus 'Service - Up to 200 AMP' $45.00, 'Service... schedule 13 Aug 2026
Palm Beach County Florida By valuation Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule schedule 6 Jul 2026
Pasco County Florida By valuation Base fee $45 schedule 19 Jul 2026
Pinellas County Florida Flat fee No flat generic electrical line schedule 6 Jul 2026
Polk County Florida Flat fee Residential electrical permit fee is $85.00 per Construction Fees Resolution 17-025 schedule 19 Jul 2026
Santa Rosa County Florida Per unit Resolution No. 2025-29 lists, under Electrical Permits, New Construction, 'Electrical Wiring Permit up to 800 amp (per... schedule 13 Aug 2026
Seminole County Florida By valuation Electrical permit fee (single family residential new construction, includes T-pole): $180.00 schedule 13 Aug 2026
St. Johns County Florida Flat fee Electrical Permit Fees (F.S. 553-80): Permit Issuance Fee $11.00, plus itemized charges such as Simple Permanent... schedule 13 Aug 2026
Volusia County Florida Flat fee Volusia County Building Permit Fee Schedule (Resolution 2005-191, as revised October 1, 2025), Exhibit B, Electrical... schedule 8 Aug 2026
Cobb County Georgia Flat fee Electrical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1... schedule 6 Jul 2026
DeKalb County Georgia Flat fee Electrical Permit Application (revised 07/09/2025): "Fee Schedule: MINIMUM FEE $120 Additional $200 for Fire Alarm... 16 Aug 2026
Gwinnett County Georgia By valuation Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024" schedule 16 Aug 2026
Hawaii County Hawaii By valuation Hawaiสปi County Code section 5-7-3(b), "PERMIT FEES" table (Chapter 5 Construction Administrative Code, 2020, ord... schedule 3 Oct 2026
Honolulu Hawaii By valuation Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials, plus a plan review fee of 20%... schedule 3 Oct 2026
Boise Idaho Flat fee Single branch circuit: $57.00 (Table 2-b) schedule 3 Oct 2026
Chicago Illinois Flat fee Tiered stand-alone schedule: repair or alteration of devices on existing circuits is $75 per service, with higher flat... schedule 17 Jun 2026
Cook County Illinois Per unit Cook County Code of Ordinances Sec. 32-1, Electrical Permit Fee Schedule, item 1-E SINGLE-FAMILY DWELLINGS: 0 to 499... schedule 15 Aug 2026
Fort Wayne Indiana Per unit Allen County Code 6-10-2-3, Electrical - Commercial & Residential schedule 15 Aug 2026
Indianapolis Indiana Flat fee DBNS Fee Schedule (Permits, as of 1.5.2026), Electrical Permit (ELE): "Installation-New Structure or Commercial... schedule 15 Aug 2026
Overland Park Kansas By valuation Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less... schedule 3 Oct 2026
Wichita Kansas Flat fee Electrical permit (UBTC Table I): 120 volt Circuit $2.00 each schedule 3 Oct 2026
Lexington Kentucky Flat fee LFUCG electrical page: "Electrical permits cost $10 each." Inspection fees are set separately by the Commonwealth... schedule 3 Oct 2026
Louisville Kentucky Flat fee LMCO 150.096 promulgated fees (revised 2/6/2024): service upgrade, new service, repairs or additional wiring in a one-... schedule 3 Oct 2026
Baton Rouge Louisiana Flat fee Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus... schedule 16 Aug 2026
New Orleans Louisiana Flat fee $40 $40 application fee plus $3 per new circuit plus $0.30 per service amperage schedule 16 Aug 2026
Baltimore County Maryland Flat fee Electrical Permit Fee Schedule effective 11/26/18: Residential Service (each meter), new, modification, upgrade... schedule 16 Aug 2026
Howard County Maryland Flat fee $50 $50 non-refundable permit application fee, plus $50 for 25 or fewer outlets/fixtures (higher tiers for more outlets or... schedule 6 Jul 2026
Montgomery County Maryland Flat fee $111.94 $111.94 minimum fee for a residential one or two family dwelling electrical permit, charged in addition to itemized... schedule 18 Jun 2026
Prince George's County Maryland Flat fee DPIE Fee Schedule, effective March 2, 2025, prices electrical work by item: "Electrical Permit Fee - Rough Wire... schedule 16 Aug 2026
Boston Massachusetts Per unit $20 $20 application fee plus $0.25 per amp for service upgrades or $1 per fixture for other work schedule 18 Jun 2026
Worcester Massachusetts Flat fee Flat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00" schedule 15 Aug 2026
Ann Arbor Michigan Flat fee Electrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no... schedule 15 Aug 2026
Detroit Michigan Per unit BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 schedule 15 Aug 2026
Grand Rapids Michigan Flat fee FY 2027 Planning, Design and Development Fee Schedule effective July 1, 2026, Electrical Permit Fees: "Application... schedule 15 Aug 2026
Sterling Heights Michigan Flat fee Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item schedule 15 Aug 2026
Minneapolis Minnesota By valuation No city fee schedule 18 Jun 2026
Saint Paul Minnesota By valuation Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work schedule 15 Aug 2026
Kansas City Missouri By valuation Electrical permits for one- and two-family detached dwellings are priced from the same valuation table as every other... schedule 16 Aug 2026
St. Louis Missouri Flat fee Electrical permit fees are established by City Ordinance 70802 schedule 16 Aug 2026
Lincoln Nebraska Flat fee Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE... 3 Oct 2026
Omaha Nebraska Per unit Omaha Municipal Code Sec. 44-130: minimum fee on all electrical work $25.00 schedule 3 Oct 2026
Clark County Nevada By valuation $54 $54 permit issuance fee under Table 3-B, with flat online simple permit fees of $61.88 for a re-tag or panel... schedule 18 Jun 2026
Henderson Nevada Flat fee No single flat electrical fee, charged per component: $190 per service including the first meter socket, plus... schedule 6 Jul 2026
Jersey City New Jersey Flat fee Electrical subcode charges $25 for the first block of 1 to 10 receptacles, fixtures or devices and $25 for each... 18 Jun 2026
Newark New Jersey By valuation Newark municipal code Chapter 7:2-3.2b: receptacles and fixtures, first 50 at $58 and each additional 20 at $12 schedule 15 Aug 2026
Buffalo New York Flat fee Electrical permit application: $50.00 application fee for all permits, plus a $100.00 plan review fee for all plans... schedule 15 Aug 2026
New York City New York By valuation Table 28-112.2 item 16, "Permit for electrical work," is "As provided by department rules." Those rules are 1 RCNY... schedule 15 Aug 2026
Rochester New York Flat fee Residential electrical inspection fees on the city's fee page: "New dwelling unit with service" $275.00 plus $120.00... schedule 15 Aug 2026
Town of Brookhaven New York Not priced The Town of Brookhaven does not charge a separate electrical permit fee 15 Aug 2026
Town of Hempstead New York By valuation The Town charges no electrical permit fee schedule 15 Aug 2026
Charlotte North Carolina By valuation Electrical permits are charged as a trade permit under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 in... schedule 15 Aug 2026
Greensboro North Carolina Per unit Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00' schedule 16 Aug 2026
Mecklenburg County North Carolina By valuation Electrical trade permit priced off total construction value with a $59.70 minimum for projects not requiring plan... schedule 18 Jun 2026
Wake County North Carolina Flat fee 'Residential Trade Permit Fee - $75 schedule 15 Aug 2026
Cincinnati Ohio By valuation The City of Cincinnati fee schedule carries no electrical line item because the work is outsourced schedule 16 Aug 2026
Cleveland Ohio Flat fee Electrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee for any permit shall be $50.00" schedule 15 Aug 2026
Columbus Ohio Flat fee Standard electrical trade permit is $275 with 2 inspections, dropping to $140 for work on the Approved Minor Work... schedule 18 Jun 2026
Franklin County Ohio Flat fee Confirm the current fee with the City of Columbus before relying on county figures schedule 16 Aug 2026
Oklahoma City Oklahoma Flat fee Oklahoma City Municipal Code Chapter 60, General Schedule of Fees, Section 60-18-16(a) "residential add-on, remodel... schedule 16 Aug 2026
Tulsa Oklahoma Flat fee Title 49, Chapter 4, Section 401 sets residential electrical permit fees for one- and two-family dwellings for new... schedule 16 Aug 2026
Eugene Oregon By valuation From the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F)... schedule 16 Aug 2026
Portland Oregon Per unit Electrical Permit Fee Schedule for the City of Portland, effective July 10, 2026 schedule 16 Aug 2026
Philadelphia Pennsylvania By valuation $100 $100 filing fee (nonrefundable) schedule 18 Jun 2026
Pittsburgh Pennsylvania By valuation 2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value... schedule 15 Aug 2026
Charleston South Carolina Flat fee A $40.00 non-refundable application fee, which the schedule says "is in addition to the Electrical Permit Fee," plus... schedule 16 Aug 2026
Columbia South Carolina By valuation Electrical work at a one or two family dwelling is priced under Code of Ordinances Sec. 5-204(a)(2) alongside... schedule 16 Aug 2026
Memphis Tennessee Flat fee E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00, E-6.2 EXISTING RESIDENTIAL 1&2 FAMILY OCCUPANCIES... schedule 16 Aug 2026
Nashville Tennessee Flat fee Flat minimum of $75 per permit with itemized add-on charges for circuits, panels, services and appliances, per Metro... schedule 18 Jun 2026
Williamson County Tennessee Flat fee State-issued via the TN CORE system: a $5 issuing fee plus ampere-based inspection fees of $35 each for rough-in and... 6 Jul 2026
Arlington Texas Not priced Planning and Development Services Fee Schedule, Effective June 1, 2026, Resolution No. 26 - 151, Building Permit for... schedule 15 Aug 2026
Austin Texas Flat fee Electrical trade permit base fee is $166.99, per the FY2025-26 DSD residential fee schedule effective 10/01/2025 schedule 18 Jun 2026
Corpus Christi Texas Per unit FY 2026 Development Fee Schedule, Electrical Permits: Residential $0.075 per square foot, Minimum Permit Fee $146.41... schedule 15 Aug 2026
Dallas Texas By valuation Billed under the Alterations or Repairs schedule (Table B-I, includes standalone trade permits), value of work times... schedule 18 Jun 2026
El Paso Texas By valuation FY 2026 Schedule C Departmental Fee List, Planning & Inspections, Electrical Permits: "Base fee, ea schedule 15 Aug 2026
Fort Worth Texas Flat fee Billed per item on the Schedule of Electrical Fees, Table 1-J: services and subpanels 60 amps to 100 amps $18.81, over... schedule 15 Aug 2026
Houston Texas Flat fee Minimum electrical permit fee is $91.06 plus the $33.56 administrative fee, with itemized charges per outlet, fixture... schedule 18 Jun 2026
Lubbock Texas Per unit Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September 30, 2026, under Electrical... schedule 15 Aug 2026
Plano Texas Per unit Building Inspections Fee Schedule effective Jan schedule 15 Aug 2026
San Antonio Texas Flat fee For work on an existing home, a $50 electrical inspection permit fee plus a $10 administrative processing fee, then an... schedule 18 Jun 2026
Arlington County Virginia By valuation Fees per FY27 ISD fee schedule schedule 19 Jul 2026
Chesterfield County Virginia Flat fee $171 $171 for a new single-family dwelling schedule 6 Jul 2026
Fairfax County Virginia Flat fee Residential addition or alteration electrical work starts at the $141.75 base fee for Level One (1 to 100 fixtures... schedule 18 Jun 2026
Fauquier County Virginia Flat fee A single-trade electrical permit is $84.15 including the technology fee at the $75 minimum schedule 18 Jun 2026
Henrico County Virginia By valuation Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per... schedule 6 Jul 2026
Loudoun County Virginia Flat fee Base fee for adding, replacing or relocating fixtures, receptacles or circuits in a 1 or 2 family dwelling is $70 schedule 18 Jun 2026
Orange County Virginia Per unit Billed under the residential Trades category at $0.15 per square foot with a $100 minimum, plus Virginia's 2% state... schedule 6 Jul 2026
Prince William County Virginia Flat fee Existing-dwelling electrical work is a base fee of $44.23 ($55.35 with surcharges) plus itemized add-ons: fixtures or... schedule 18 Jun 2026
Spotsylvania County Virginia Flat fee Minimum electrical permit is $100, totaling $147 over the counter after the 2% building surcharge and $45 processing... schedule 18 Jun 2026
Stafford County Virginia Flat fee Residential electrical trade work bills under the All Trades line at $60 per trade per system, plus the 2 percent... schedule 6 Jul 2026
Bellevue Washington By valuation Electrical permit fee by valuation per Table 6 of Ordinance 6879, $79 inspection fee minimum for valuation up to $500... schedule 18 Jun 2026
Clark County Washington State-issued No county fee 19 Jul 2026
King County Washington Flat fee Set by state L&I, not King County, under WAC 296-46B-906 (effective 7/1/2026): new single or two family home wiring... schedule 18 Jun 2026
Pierce County Washington State-issued No county fee 6 Jul 2026
Seattle Washington Flat fee Itemized per Fee Subtitle Table D-15: minimum $105.12 for a standard online self-issued permit plus a $55.48... schedule 18 Jun 2026
Snohomish County Washington State-issued No county fee 6 Jul 2026
Tacoma Washington By valuation No Planning and Development Services fee schedule 18 Jun 2026
Thurston County Washington By valuation L&I sets electrical permit fees schedule 19 Jul 2026
Madison Wisconsin Per unit MGO 19.11, Group IV, Alterations And Special Fees (repealed and recreated by ORD-21-00026, 3-26-21): "$25.00 first ten... schedule 16 Aug 2026
Milwaukee Wisconsin Flat fee Electrical permit fees are not reproduced in the Plan Review and Permit Fees schedule schedule 16 Aug 2026

142 rows, every one taken from the jurisdiction's published schedule for electrical permits and linked to its page. Every electrical permit row also sits inside the cross-type study at what building permits cost.

Cite this data

PermitNotebook (2026). Electrical Permit fees and requirements in 142 US localities, verified against published fee schedules. https://permitnotebook.com/permits/electrical/

Electrical Permit rules by state

33 states, 148 counties and cities. Pick your state for the locality-by-locality comparison, or go straight to your county.

State Localities Required Conditional Not required Thresholds published
Florida 28 25 3 0 None published
California uniform 14 14 0 0 None published
Virginia 12 9 3 0 None published
Texas uniform 10 10 0 0 None published
Arizona 8 5 3 0 None published
Washington uniform 8 8 0 0 None published
New York 5 2 3 0 None published
Georgia 4 3 1 0 None published
Maryland 4 3 1 0 None published
Michigan 4 1 3 0 None published
North Carolina 4 1 3 0 None published
Ohio 4 2 2 0 None published
Colorado 3 2 1 0 None published
Tennessee uniform 3 3 0 0 None published
Delaware uniform 2 2 0 0 None published
Hawaii 2 1 1 0 None published
Illinois uniform 2 2 0 0 None published
Indiana uniform 2 0 2 0 None published
Kansas uniform 2 2 0 0 None published
Kentucky uniform 2 2 0 0 None published
Louisiana 2 1 1 0 None published
Massachusetts uniform 2 2 0 0 None published
Minnesota uniform 2 2 0 0 None published
Missouri uniform 2 0 2 0 None published
Nebraska 2 1 1 0 None published
Nevada uniform 2 2 0 0 None published
New Jersey 2 1 1 0 None published
Oklahoma uniform 2 0 2 0 None published
Oregon 2 1 1 0 None published
Pennsylvania 2 1 1 0 None published
South Carolina uniform 2 0 2 0 None published
Wisconsin uniform 2 0 2 0 None published
Idaho 1 1 0 0 None published

A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.

How electrical permits work, start to finish

Applying

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

Inspections and close-out

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

General practice; your locality's page carries its own process, fees, and portal. Sources: International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted), International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions.

Common questions about electrical permits

Do I need an electrical permit?
For electrical work, almost everywhere, yes. An electrical permit is issued by your city or county rather than the state, so the rule is local. Across the 148 jurisdictions where we have read the electrical rule, 109 require a permit outright, 39 require one only in certain conditions.
Is there an electrical permit exemption?
In 39 of the 148 jurisdictions we cover, an electrical permit is not needed below a published threshold, and that threshold differs from one office to the next. The size thresholds section above lists each jurisdiction's own electrical figure with its source, and the same electrical job can be exempt in one county and permitted in the next.

Find the electrical permit rule where you live

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning more than an electrical permit? Check your whole project