Do you need an electrical permit?
By Mario Bailey Last checked
It depends entirely on where you live, and the differences are larger than most national guides admit. We read the code, ordinance, or fee schedule published by each of 148 US counties and cities and recorded what it actually says.
Where are you building?
The rule is set locally and the spread is wide, so start with your own jurisdiction. We have read the published rule in 148 of them.
The short answer
Of the 148 jurisdictions where we have confirmed the rule, 109 require a permit outright, 39 require one only in certain conditions.
What an electrical permit costs
142 of our electrical permit rows carry a fee answer taken from the jurisdiction's own published schedule, across 142 localities. There is no single number to quote, and not because we did not look: jurisdictions price this permit in genuinely different ways. Some charge a flat fee, some a percentage of the job's assessed valuation, some a rate per square foot, and some do not price it at all because the work is permitted by a state agency or a utility instead. Each row below is that jurisdiction's own wording.
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Chandler Arizona | By valuation | Fee schedule sets a flat $100 fee only for electrical service upgrades of 400 amps or less per 4.6.4(b), other... schedule | 6 Jul 2026 |
| Gilbert Arizona | Flat fee | Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026) schedule | 19 Jul 2026 |
| Maricopa County Arizona | Flat fee | Flat rate by residential service size, $50 for 1-200 amps, $75 for 201-400 amps, $120 over 400 amps, per the Summary... schedule | 18 Jun 2026 |
| Mesa Arizona | By valuation | A stand-alone electrical permit is valuation based on the same Residential Rate Table, $220 minimum for the $0 to... schedule | 17 Jun 2026 |
| Peoria Arizona | By valuation | Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025) schedule | 19 Jul 2026 |
| Phoenix Arizona | By valuation | Electrical permits have no dedicated fee line, they are valuation-based building permits under Table A, minimum $195... schedule | 18 Jun 2026 |
| Pima County Arizona | Flat fee | Flat fee tiered by scope: minor work such as a service upgrade, reconnect, or up to five new circuits is $27, moderate... schedule | 6 Jul 2026 |
| Scottsdale Arizona | Flat fee | Typical single-family electrical work (rewire, panel relocation, service upgrade to 400 amp) is a no-plan-review... schedule | 18 Jun 2026 |
| Alameda County California | By valuation | Building Inspection Department Service Fee Schedule (Schedule A, effective July 1, 2024): where electrical work is... schedule | 15 Aug 2026 |
| Contra Costa County California | By valuation | Land Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum." Electrical inspection fees for an... schedule | 15 Aug 2026 |
| Fresno County California | Flat fee | Section 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each schedule | 15 Aug 2026 |
| Los Angeles California | Flat fee | Itemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under... schedule | 17 Jun 2026 |
| Los Angeles County California | Per unit | Electrical Code Fee Schedule (Title 27 of the County of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026:... schedule | 15 Aug 2026 |
| Orange County California | By valuation | Electrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27 schedule | 15 Aug 2026 |
| Riverside County California | Flat fee | Residential Electrical (BEL-RELE): $448.20 fixed fee schedule | 15 Aug 2026 |
| Sacramento California | Flat fee | Flat $105 permit fee for one-trade minor electrical work such as a panel change-out, rewire or new circuit, plus a 10%... schedule | 18 Jun 2026 |
| Sacramento County California | By valuation | No electrical line item is published schedule | 15 Aug 2026 |
| San Bernardino County California | Flat fee | County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026: "Meter change out and upgrades... schedule | 15 Aug 2026 |
| San Diego California | Per unit | Billed per circuit or panel under IB-103 Table 2 effective May 2026: circuits 15-45 amps $176.57 for the first 5... schedule | 17 Jun 2026 |
| San Diego County California | Flat fee | PDS 613 (effective 07/10/2026, FY 25/26) line item "Electrical Only": Permit Fee $392.00, no plan review fee schedule | 15 Aug 2026 |
| San Jose California | Flat fee | Greater of $315 per hour of required inspection time or an itemized fixture-based schedule, charged in addition to the... schedule | 17 Jun 2026 |
| Santa Clara County California | Flat fee | Under the county's Building Section Services Fee Schedule effective July 1, 2025 the electrical inspection hourly rate... | 15 Aug 2026 |
| Aurora Colorado | Flat fee | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)") the line item "Residential... schedule | 16 Aug 2026 |
| Denver Colorado | By valuation | Valuation-based fee per CPD Table 1 with a $20 minimum for work valued at $500 or less schedule | 17 Jun 2026 |
| Jefferson County Colorado | By valuation | Electrical permits not tied to an active building permit bill on the countywide valuation fee table with a $55 minimum... schedule | 6 Jul 2026 |
| New Castle County Delaware | By valuation | Set by the State-licensed inspection agency or the State homeowner permit schedule | 3 Oct 2026 |
| Sussex County Delaware | By valuation | Set by the licensed inspection agency, not the county schedule | 3 Oct 2026 |
| Alachua County Florida | By valuation | No electrical-specific flat fee is published schedule | 13 Aug 2026 |
| Brevard County Florida | By valuation | Brevard's Residential Electrical Permit Application fee table lists a Building Code Review fee of $75.00 for the first... | 8 Aug 2026 |
| Broward County Florida | By valuation | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.30 of the Building... | 18 Jun 2026 |
| Charlotte County Florida | By valuation | At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a... | 8 Aug 2026 |
| Clay County Florida | Flat fee | FY24/25 Building Fee Schedule, Electrical Permits (Section 208.2), effective January 1, 2025: new residential/mobile... schedule | 13 Aug 2026 |
| Collier County Florida | Per unit | Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review Fees: valuation up to... schedule | 8 Aug 2026 |
| Hernando County Florida | Flat fee | Electric, Other: $165.00 schedule | 13 Aug 2026 |
| Hillsborough County Florida | Flat fee | Residential Electrical (General) trade permit fee is $130 flat for inspection-only work with no plan review, full fee... schedule | 18 Jun 2026 |
| Jacksonville Florida | Flat fee | City Fees schedule (Municipal Code Section 320.409), Electrical Permit Fees, new single-family residential occupancy:... schedule | 8 Aug 2026 |
| Lake County Florida | Per unit | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square... schedule | 13 Aug 2026 |
| Lee County Florida | Flat fee | Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational... schedule | 19 Jul 2026 |
| Leon County Florida | Per unit | Fee Schedule, Residential Plan Review/Inspection (sq ft based): Electrical Plan Review $0.10 per sq ft, Electrical... schedule | 13 Aug 2026 |
| Manatee County Florida | Flat fee | Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046):... schedule | 8 Aug 2026 |
| Marion County Florida | Flat fee | Res Electrical Scope: $100.00, per Resolution 25-R-295 (effective Oct schedule | 8 Aug 2026 |
| Miami-Dade County Florida | Per unit | Residential wiring for new construction, additions, repairs and alterations is $0.11 per square foot of the master... schedule | 18 Jun 2026 |
| Orange County Florida | Flat fee | Minimum Electrical Permit fee is $38 flat, scaling with service amperage for new or upgraded service, for example $75... schedule | 18 Jun 2026 |
| Osceola County Florida | Flat fee | Appendix A's Electrical Permit Fees section lists a $125.00 base fee, plus 'Service - Up to 200 AMP' $45.00, 'Service... schedule | 13 Aug 2026 |
| Palm Beach County Florida | By valuation | Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule schedule | 6 Jul 2026 |
| Pasco County Florida | By valuation | Base fee $45 schedule | 19 Jul 2026 |
| Pinellas County Florida | Flat fee | No flat generic electrical line schedule | 6 Jul 2026 |
| Polk County Florida | Flat fee | Residential electrical permit fee is $85.00 per Construction Fees Resolution 17-025 schedule | 19 Jul 2026 |
| Santa Rosa County Florida | Per unit | Resolution No. 2025-29 lists, under Electrical Permits, New Construction, 'Electrical Wiring Permit up to 800 amp (per... schedule | 13 Aug 2026 |
| Seminole County Florida | By valuation | Electrical permit fee (single family residential new construction, includes T-pole): $180.00 schedule | 13 Aug 2026 |
| St. Johns County Florida | Flat fee | Electrical Permit Fees (F.S. 553-80): Permit Issuance Fee $11.00, plus itemized charges such as Simple Permanent... schedule | 13 Aug 2026 |
| Volusia County Florida | Flat fee | Volusia County Building Permit Fee Schedule (Resolution 2005-191, as revised October 1, 2025), Exhibit B, Electrical... schedule | 8 Aug 2026 |
| Cobb County Georgia | Flat fee | Electrical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1... schedule | 6 Jul 2026 |
| DeKalb County Georgia | Flat fee | Electrical Permit Application (revised 07/09/2025): "Fee Schedule: MINIMUM FEE $120 Additional $200 for Fire Alarm... | 16 Aug 2026 |
| Gwinnett County Georgia | By valuation | Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024" schedule | 16 Aug 2026 |
| Hawaii County Hawaii | By valuation | Hawaiสปi County Code section 5-7-3(b), "PERMIT FEES" table (Chapter 5 Construction Administrative Code, 2020, ord... schedule | 3 Oct 2026 |
| Honolulu Hawaii | By valuation | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials, plus a plan review fee of 20%... schedule | 3 Oct 2026 |
| Boise Idaho | Flat fee | Single branch circuit: $57.00 (Table 2-b) schedule | 3 Oct 2026 |
| Chicago Illinois | Flat fee | Tiered stand-alone schedule: repair or alteration of devices on existing circuits is $75 per service, with higher flat... schedule | 17 Jun 2026 |
| Cook County Illinois | Per unit | Cook County Code of Ordinances Sec. 32-1, Electrical Permit Fee Schedule, item 1-E SINGLE-FAMILY DWELLINGS: 0 to 499... schedule | 15 Aug 2026 |
| Fort Wayne Indiana | Per unit | Allen County Code 6-10-2-3, Electrical - Commercial & Residential schedule | 15 Aug 2026 |
| Indianapolis Indiana | Flat fee | DBNS Fee Schedule (Permits, as of 1.5.2026), Electrical Permit (ELE): "Installation-New Structure or Commercial... schedule | 15 Aug 2026 |
| Overland Park Kansas | By valuation | Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less... schedule | 3 Oct 2026 |
| Wichita Kansas | Flat fee | Electrical permit (UBTC Table I): 120 volt Circuit $2.00 each schedule | 3 Oct 2026 |
| Lexington Kentucky | Flat fee | LFUCG electrical page: "Electrical permits cost $10 each." Inspection fees are set separately by the Commonwealth... schedule | 3 Oct 2026 |
| Louisville Kentucky | Flat fee | LMCO 150.096 promulgated fees (revised 2/6/2024): service upgrade, new service, repairs or additional wiring in a one-... schedule | 3 Oct 2026 |
| Baton Rouge Louisiana | Flat fee | Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus... schedule | 16 Aug 2026 |
| New Orleans Louisiana | Flat fee | $40 $40 application fee plus $3 per new circuit plus $0.30 per service amperage schedule | 16 Aug 2026 |
| Baltimore County Maryland | Flat fee | Electrical Permit Fee Schedule effective 11/26/18: Residential Service (each meter), new, modification, upgrade... schedule | 16 Aug 2026 |
| Howard County Maryland | Flat fee | $50 $50 non-refundable permit application fee, plus $50 for 25 or fewer outlets/fixtures (higher tiers for more outlets or... schedule | 6 Jul 2026 |
| Montgomery County Maryland | Flat fee | $111.94 $111.94 minimum fee for a residential one or two family dwelling electrical permit, charged in addition to itemized... schedule | 18 Jun 2026 |
| Prince George's County Maryland | Flat fee | DPIE Fee Schedule, effective March 2, 2025, prices electrical work by item: "Electrical Permit Fee - Rough Wire... schedule | 16 Aug 2026 |
| Boston Massachusetts | Per unit | $20 $20 application fee plus $0.25 per amp for service upgrades or $1 per fixture for other work schedule | 18 Jun 2026 |
| Worcester Massachusetts | Flat fee | Flat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00" schedule | 15 Aug 2026 |
| Ann Arbor Michigan | Flat fee | Electrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no... schedule | 15 Aug 2026 |
| Detroit Michigan | Per unit | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 schedule | 15 Aug 2026 |
| Grand Rapids Michigan | Flat fee | FY 2027 Planning, Design and Development Fee Schedule effective July 1, 2026, Electrical Permit Fees: "Application... schedule | 15 Aug 2026 |
| Sterling Heights Michigan | Flat fee | Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item schedule | 15 Aug 2026 |
| Minneapolis Minnesota | By valuation | No city fee schedule | 18 Jun 2026 |
| Saint Paul Minnesota | By valuation | Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work schedule | 15 Aug 2026 |
| Kansas City Missouri | By valuation | Electrical permits for one- and two-family detached dwellings are priced from the same valuation table as every other... schedule | 16 Aug 2026 |
| St. Louis Missouri | Flat fee | Electrical permit fees are established by City Ordinance 70802 schedule | 16 Aug 2026 |
| Lincoln Nebraska | Flat fee | Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE... | 3 Oct 2026 |
| Omaha Nebraska | Per unit | Omaha Municipal Code Sec. 44-130: minimum fee on all electrical work $25.00 schedule | 3 Oct 2026 |
| Clark County Nevada | By valuation | $54 $54 permit issuance fee under Table 3-B, with flat online simple permit fees of $61.88 for a re-tag or panel... schedule | 18 Jun 2026 |
| Henderson Nevada | Flat fee | No single flat electrical fee, charged per component: $190 per service including the first meter socket, plus... schedule | 6 Jul 2026 |
| Jersey City New Jersey | Flat fee | Electrical subcode charges $25 for the first block of 1 to 10 receptacles, fixtures or devices and $25 for each... | 18 Jun 2026 |
| Newark New Jersey | By valuation | Newark municipal code Chapter 7:2-3.2b: receptacles and fixtures, first 50 at $58 and each additional 20 at $12 schedule | 15 Aug 2026 |
| Buffalo New York | Flat fee | Electrical permit application: $50.00 application fee for all permits, plus a $100.00 plan review fee for all plans... schedule | 15 Aug 2026 |
| New York City New York | By valuation | Table 28-112.2 item 16, "Permit for electrical work," is "As provided by department rules." Those rules are 1 RCNY... schedule | 15 Aug 2026 |
| Rochester New York | Flat fee | Residential electrical inspection fees on the city's fee page: "New dwelling unit with service" $275.00 plus $120.00... schedule | 15 Aug 2026 |
| Town of Brookhaven New York | Not priced | The Town of Brookhaven does not charge a separate electrical permit fee | 15 Aug 2026 |
| Town of Hempstead New York | By valuation | The Town charges no electrical permit fee schedule | 15 Aug 2026 |
| Charlotte North Carolina | By valuation | Electrical permits are charged as a trade permit under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 in... schedule | 15 Aug 2026 |
| Greensboro North Carolina | Per unit | Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00' schedule | 16 Aug 2026 |
| Mecklenburg County North Carolina | By valuation | Electrical trade permit priced off total construction value with a $59.70 minimum for projects not requiring plan... schedule | 18 Jun 2026 |
| Wake County North Carolina | Flat fee | 'Residential Trade Permit Fee - $75 schedule | 15 Aug 2026 |
| Cincinnati Ohio | By valuation | The City of Cincinnati fee schedule carries no electrical line item because the work is outsourced schedule | 16 Aug 2026 |
| Cleveland Ohio | Flat fee | Electrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee for any permit shall be $50.00" schedule | 15 Aug 2026 |
| Columbus Ohio | Flat fee | Standard electrical trade permit is $275 with 2 inspections, dropping to $140 for work on the Approved Minor Work... schedule | 18 Jun 2026 |
| Franklin County Ohio | Flat fee | Confirm the current fee with the City of Columbus before relying on county figures schedule | 16 Aug 2026 |
| Oklahoma City Oklahoma | Flat fee | Oklahoma City Municipal Code Chapter 60, General Schedule of Fees, Section 60-18-16(a) "residential add-on, remodel... schedule | 16 Aug 2026 |
| Tulsa Oklahoma | Flat fee | Title 49, Chapter 4, Section 401 sets residential electrical permit fees for one- and two-family dwellings for new... schedule | 16 Aug 2026 |
| Eugene Oregon | By valuation | From the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F)... schedule | 16 Aug 2026 |
| Portland Oregon | Per unit | Electrical Permit Fee Schedule for the City of Portland, effective July 10, 2026 schedule | 16 Aug 2026 |
| Philadelphia Pennsylvania | By valuation | $100 $100 filing fee (nonrefundable) schedule | 18 Jun 2026 |
| Pittsburgh Pennsylvania | By valuation | 2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value... schedule | 15 Aug 2026 |
| Charleston South Carolina | Flat fee | A $40.00 non-refundable application fee, which the schedule says "is in addition to the Electrical Permit Fee," plus... schedule | 16 Aug 2026 |
| Columbia South Carolina | By valuation | Electrical work at a one or two family dwelling is priced under Code of Ordinances Sec. 5-204(a)(2) alongside... schedule | 16 Aug 2026 |
| Memphis Tennessee | Flat fee | E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00, E-6.2 EXISTING RESIDENTIAL 1&2 FAMILY OCCUPANCIES... schedule | 16 Aug 2026 |
| Nashville Tennessee | Flat fee | Flat minimum of $75 per permit with itemized add-on charges for circuits, panels, services and appliances, per Metro... schedule | 18 Jun 2026 |
| Williamson County Tennessee | Flat fee | State-issued via the TN CORE system: a $5 issuing fee plus ampere-based inspection fees of $35 each for rough-in and... | 6 Jul 2026 |
| Arlington Texas | Not priced | Planning and Development Services Fee Schedule, Effective June 1, 2026, Resolution No. 26 - 151, Building Permit for... schedule | 15 Aug 2026 |
| Austin Texas | Flat fee | Electrical trade permit base fee is $166.99, per the FY2025-26 DSD residential fee schedule effective 10/01/2025 schedule | 18 Jun 2026 |
| Corpus Christi Texas | Per unit | FY 2026 Development Fee Schedule, Electrical Permits: Residential $0.075 per square foot, Minimum Permit Fee $146.41... schedule | 15 Aug 2026 |
| Dallas Texas | By valuation | Billed under the Alterations or Repairs schedule (Table B-I, includes standalone trade permits), value of work times... schedule | 18 Jun 2026 |
| El Paso Texas | By valuation | FY 2026 Schedule C Departmental Fee List, Planning & Inspections, Electrical Permits: "Base fee, ea schedule | 15 Aug 2026 |
| Fort Worth Texas | Flat fee | Billed per item on the Schedule of Electrical Fees, Table 1-J: services and subpanels 60 amps to 100 amps $18.81, over... schedule | 15 Aug 2026 |
| Houston Texas | Flat fee | Minimum electrical permit fee is $91.06 plus the $33.56 administrative fee, with itemized charges per outlet, fixture... schedule | 18 Jun 2026 |
| Lubbock Texas | Per unit | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September 30, 2026, under Electrical... schedule | 15 Aug 2026 |
| Plano Texas | Per unit | Building Inspections Fee Schedule effective Jan schedule | 15 Aug 2026 |
| San Antonio Texas | Flat fee | For work on an existing home, a $50 electrical inspection permit fee plus a $10 administrative processing fee, then an... schedule | 18 Jun 2026 |
| Arlington County Virginia | By valuation | Fees per FY27 ISD fee schedule schedule | 19 Jul 2026 |
| Chesterfield County Virginia | Flat fee | $171 $171 for a new single-family dwelling schedule | 6 Jul 2026 |
| Fairfax County Virginia | Flat fee | Residential addition or alteration electrical work starts at the $141.75 base fee for Level One (1 to 100 fixtures... schedule | 18 Jun 2026 |
| Fauquier County Virginia | Flat fee | A single-trade electrical permit is $84.15 including the technology fee at the $75 minimum schedule | 18 Jun 2026 |
| Henrico County Virginia | By valuation | Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per... schedule | 6 Jul 2026 |
| Loudoun County Virginia | Flat fee | Base fee for adding, replacing or relocating fixtures, receptacles or circuits in a 1 or 2 family dwelling is $70 schedule | 18 Jun 2026 |
| Orange County Virginia | Per unit | Billed under the residential Trades category at $0.15 per square foot with a $100 minimum, plus Virginia's 2% state... schedule | 6 Jul 2026 |
| Prince William County Virginia | Flat fee | Existing-dwelling electrical work is a base fee of $44.23 ($55.35 with surcharges) plus itemized add-ons: fixtures or... schedule | 18 Jun 2026 |
| Spotsylvania County Virginia | Flat fee | Minimum electrical permit is $100, totaling $147 over the counter after the 2% building surcharge and $45 processing... schedule | 18 Jun 2026 |
| Stafford County Virginia | Flat fee | Residential electrical trade work bills under the All Trades line at $60 per trade per system, plus the 2 percent... schedule | 6 Jul 2026 |
| Bellevue Washington | By valuation | Electrical permit fee by valuation per Table 6 of Ordinance 6879, $79 inspection fee minimum for valuation up to $500... schedule | 18 Jun 2026 |
| Clark County Washington | State-issued | No county fee | 19 Jul 2026 |
| King County Washington | Flat fee | Set by state L&I, not King County, under WAC 296-46B-906 (effective 7/1/2026): new single or two family home wiring... schedule | 18 Jun 2026 |
| Pierce County Washington | State-issued | No county fee | 6 Jul 2026 |
| Seattle Washington | Flat fee | Itemized per Fee Subtitle Table D-15: minimum $105.12 for a standard online self-issued permit plus a $55.48... schedule | 18 Jun 2026 |
| Snohomish County Washington | State-issued | No county fee | 6 Jul 2026 |
| Tacoma Washington | By valuation | No Planning and Development Services fee schedule | 18 Jun 2026 |
| Thurston County Washington | By valuation | L&I sets electrical permit fees schedule | 19 Jul 2026 |
| Madison Wisconsin | Per unit | MGO 19.11, Group IV, Alterations And Special Fees (repealed and recreated by ORD-21-00026, 3-26-21): "$25.00 first ten... schedule | 16 Aug 2026 |
| Milwaukee Wisconsin | Flat fee | Electrical permit fees are not reproduced in the Plan Review and Permit Fees schedule schedule | 16 Aug 2026 |
142 rows, every one taken from the jurisdiction's published schedule for electrical permits and linked to its page. Every electrical permit row also sits inside the cross-type study at what building permits cost.
Cite this data
PermitNotebook (2026). Electrical Permit fees and requirements in 142 US localities, verified against published fee schedules. https://permitnotebook.com/permits/electrical/
Electrical Permit rules by state
33 states, 148 counties and cities. Pick your state for the locality-by-locality comparison, or go straight to your county.
| State | Localities | Required | Conditional | Not required | Thresholds published |
|---|---|---|---|---|---|
| Florida | 28 | 25 | 3 | 0 | None published |
| California uniform | 14 | 14 | 0 | 0 | None published |
| Virginia | 12 | 9 | 3 | 0 | None published |
| Texas uniform | 10 | 10 | 0 | 0 | None published |
| Arizona | 8 | 5 | 3 | 0 | None published |
| Washington uniform | 8 | 8 | 0 | 0 | None published |
| New York | 5 | 2 | 3 | 0 | None published |
| Georgia | 4 | 3 | 1 | 0 | None published |
| Maryland | 4 | 3 | 1 | 0 | None published |
| Michigan | 4 | 1 | 3 | 0 | None published |
| North Carolina | 4 | 1 | 3 | 0 | None published |
| Ohio | 4 | 2 | 2 | 0 | None published |
| Colorado | 3 | 2 | 1 | 0 | None published |
| Tennessee uniform | 3 | 3 | 0 | 0 | None published |
| Delaware uniform | 2 | 2 | 0 | 0 | None published |
| Hawaii | 2 | 1 | 1 | 0 | None published |
| Illinois uniform | 2 | 2 | 0 | 0 | None published |
| Indiana uniform | 2 | 0 | 2 | 0 | None published |
| Kansas uniform | 2 | 2 | 0 | 0 | None published |
| Kentucky uniform | 2 | 2 | 0 | 0 | None published |
| Louisiana | 2 | 1 | 1 | 0 | None published |
| Massachusetts uniform | 2 | 2 | 0 | 0 | None published |
| Minnesota uniform | 2 | 2 | 0 | 0 | None published |
| Missouri uniform | 2 | 0 | 2 | 0 | None published |
| Nebraska | 2 | 1 | 1 | 0 | None published |
| Nevada uniform | 2 | 2 | 0 | 0 | None published |
| New Jersey | 2 | 1 | 1 | 0 | None published |
| Oklahoma uniform | 2 | 0 | 2 | 0 | None published |
| Oregon | 2 | 1 | 1 | 0 | None published |
| Pennsylvania | 2 | 1 | 1 | 0 | None published |
| South Carolina uniform | 2 | 0 | 2 | 0 | None published |
| Wisconsin uniform | 2 | 0 | 2 | 0 | None published |
| Idaho | 1 | 1 | 0 | 0 | None published |
A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.
How electrical permits work, start to finish
Applying
In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
Inspections and close-out
Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
General practice; your locality's page carries its own process, fees, and portal. Sources: International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted), International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions.
Common questions about electrical permits
- Do I need an electrical permit?
- For electrical work, almost everywhere, yes. An electrical permit is issued by your city or county rather than the state, so the rule is local. Across the 148 jurisdictions where we have read the electrical rule, 109 require a permit outright, 39 require one only in certain conditions.
- Is there an electrical permit exemption?
- In 39 of the 148 jurisdictions we cover, an electrical permit is not needed below a published threshold, and that threshold differs from one office to the next. The size thresholds section above lists each jurisdiction's own electrical figure with its source, and the same electrical job can be exempt in one county and permitted in the next.
Find the electrical permit rule where you live
Look up your locality
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning more than an electrical permit? Check your whole project