Do you need an electrical permit?

Yes for anything new; a same-for-same swap is the narrow exception

Adding an outlet, a light, a circuit or a ceiling fan box, or touching the panel, needs an electrical permit nearly everywhere. Replacing a worn outlet, switch or fixture with the same kind, on the same box and circuit, is the one job many offices let you skip.

We read the electrical rule of 177 US counties and cities. 119 treat electrical work in general as permitted work; 58 publish a separate list of exempt minor work, and outlets, receptacles or switches appear on 45 of those lists, light fixtures on 35. Many of the 119 still allow a like-for-like swap in their own rules: Phoenix lets you replace a switch or receptacle in kind without a permit, and Virginia's statewide code exempts replacing switches, receptacles, light fixtures and ceiling fans in a house.

Where are you working?

Your office decides which swaps are exempt. Its own list:

The jobs that need a permit almost everywhere

The line offices draw is between replacing what is there and adding to it. These sit on the permit side of that line in nearly every electrical rule we have read (Sioux Falls, South Dakota, which counts outlets and circuits before it requires a permit, is the rare exception):

  • A new outlet, switch or light where there was none, including a hardwired fixture that replaces a plug-in lamp.
  • A new or extended circuit, for a kitchen, a bathroom, an addition, a hot tub or a car charger.
  • Panel and service work: a new panel, a subpanel, a service upgrade, a meter base.
  • Equipment that brings its own wiring: a standby generator, a solar array, an EV charger.

Two offices, in their own words:

“A permit is required for new or extended branch circuits, adding fixtures or receptacles to an existing circuit or adding or upgrading an electrical service.”

Overland Park, Kansas (its permits page)

“Installing new wired lighting, ceiling fans, or electrical outlets requires a permit. This includes fixtures like chandeliers, recessed lights, and wall sconces that are hardwired, not plug-in.”

Tucson, Arizona (its permit exemptions page)

Car chargers and solar have their own national pages: EV charger permits and solar permits.

The swap exemption, and its fine print

Virginia writes the swap into its statewide code, for houses: “Replacement of general use snap switches, dimmer and control switches, 125 volt-15 or 20 ampere receptacles, luminaires (lighting fixtures), and ceiling (paddle) fans” (13VAC5-63-80, item 14.3, read 18 Nov 2026). Elsewhere the exemption is local, and narrower.

The International Residential Code, the starting point for most state codes, keeps its electrical exemptions short (Section R105.2): minor repairs such as replacing lamps, plugging approved equipment into existing receptacles, reinstalling a receptacle but not the outlet behind it, replacing a breaker or fuse of the required size in the same place, and low-voltage wiring. Local codes reword and extend that list, and the wording decides what you can do.

“Replacement of snap switches, receptacles and fixtures (other than ceiling fans) where no alteration or extension of an existing circuit is required.”

Kansas City, Missouri (its exempt work list)

“A permit is required for alterations to electrical systems that involve more than replacing switches or receptacles”

Detroit, Michigan (its “Do I need a permit” sheet)

Read your office’s list for three details that trip people up:

  • The box, not just the device. Las Vegas exempts “Replacement of receptacles, but not the outlet box.” Moving or enlarging the box is new work.
  • Same type means same type. A smart switch that needs a neutral wire the box does not have is no longer a swap: it means new wiring.
  • A fixture is not a fan. A ceiling fan is heavier than the light it replaces and needs a box rated for it, which is why Kansas City carves fans out of its fixture exemption.

Doing it yourself: a different question from the permit

Whether the work needs a permit and who may do it are separate rules. The permit rule is local; who may wire a house is usually state licensing law, and many states let an owner pull a permit for their own home and do the work themselves while barring them from doing it for anyone else. Corpus Christi, Texas, for example, tells owners: “Homeowners performing their own mechanical, electrical or plumbing work on their homestead may apply for a trade permit.”

The full state-by-state picture is in can a homeowner pull an electrical permit, and the item-by-item list of what needs a permit is in electrical work that needs a permit.

Every published line, office by office

Measured in outlets, switches, receptacles or fixtures (1 jurisdiction)

Threshold Jurisdictions Where
5 outlets, switches, receptacles or fixtures 1 Sioux Falls

Measured in USD (1 jurisdiction)

Threshold Jurisdictions Where
$1,000 1 Burlington

Thresholds are recorded as the jurisdiction states them. Which side of the number triggers the permit varies, so read your own locality's page before relying on one.

What an electrical permit costs

Locality Pricing model What each electrical permit schedule says Verified
Birmingham Alabama By valuation Technical Code of the City of Birmingham, 2024 (effective 10/1/2024), Article V: "ELECTRICAL PERMIT FEES .. schedule 30 Oct 2026
Anchorage Alaska Flat fee AMC 23.10.109 Table 3-A item 3.A, "Trade Permits (Plumbing, mechanical, or electrical work but no structural or... schedule 30 Oct 2026
Chandler Arizona By valuation Flat $100.00 for an electrical service of 400 amps or less and flat $100.00 for miscellaneous minor residential work... schedule 11 Nov 2026
Gilbert Arizona Flat fee Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026) schedule 17 Nov 2026
Maricopa County Arizona Flat fee Flat rate by residential service size, $50 for 1-200 amps, $75 for 201-400 amps, $120 over 400 amps, per the Summary... schedule 11 Nov 2026
Mesa Arizona By valuation A stand-alone electrical permit is valuation based on the Residential Rate Table, $220 for the $0 to $8,333 bracket... schedule 11 Nov 2026
Peoria Arizona By valuation Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025) schedule 11 Nov 2026
Phoenix Arizona By valuation Electrical permits have no dedicated fee line schedule 11 Nov 2026
Pima County Arizona Flat fee Tiered by scope: minor electrical work (service upgrade, electrical reconnect, addition of up to five circuits) is $27... schedule 11 Nov 2026
Scottsdale Arizona Flat fee Typical single-family electrical work (rewire, panel relocation, service upgrade to 400 amp) is a no-plan-review... schedule 11 Nov 2026
Tucson Arizona Flat fee "4-02.9.1 Trade Permits": $150.00, listed items include "C. Replace Electric Service Panel (like for like schedule 23 Oct 2026
Little Rock Arkansas Per unit Repair/alteration/addition items, for example openings 1 to 20, $12.36 schedule 30 Oct 2026
Alameda County California By valuation Building Inspection Department Service Fee Schedule (Schedule A, effective July 1, 2024): where electrical work is... schedule 15 Aug 2026
Locality Pricing model What each electrical permit schedule says Verified
Contra Costa County California By valuation Land Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum." Electrical inspection fees for an... schedule 15 Aug 2026
Fresno County California Flat fee Section 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each schedule 16 Nov 2026
Los Angeles California Flat fee Itemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under... schedule 11 Nov 2026
Los Angeles County California Per unit Electrical Code Fee Schedule (Title 27 of the County of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026:... schedule 16 Nov 2026
Orange County California By valuation Electrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27 schedule 16 Nov 2026
Riverside County California Flat fee Residential Electrical (BEL-RELE): $448.20 fixed fee schedule 16 Nov 2026
Sacramento California Flat fee Flat $105 permit fee for one-trade minor electrical work such as a panel change-out, rewire or new circuit, plus a 10%... schedule 11 Nov 2026
Sacramento County California By valuation No electrical line item is published schedule 15 Aug 2026
San Bernardino County California Flat fee County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026: "Meter change out and upgrades... schedule 17 Nov 2026
San Diego California Per unit Billed per circuit or panel under IB-103 Table 2 effective May 2026: circuits 15-45 amps $176.57 for the first 5... schedule 11 Nov 2026
San Diego County California Flat fee PDS 613 (effective 07/10/2026, FY 25/26) line item "Electrical Only": Permit Fee $392.00, no plan review fee schedule 15 Aug 2026
San Francisco California Flat fee Table 1A-E Electrical Permit Issuance and Inspection ("July 2026", fees for permits issued on and after July 12... schedule 30 Oct 2026
San Jose California Flat fee The greater of $315 per hour of required inspection time or an itemized fixture-based schedule, charged in addition to... schedule 11 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Santa Clara County California By valuation Single-family electrical work is a minor permit under the county's Building Fee Schedule - FY 2026-2027 (effective... schedule 16 Nov 2026
Aurora Colorado Flat fee On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)") the line item "Residential... schedule 16 Nov 2026
Denver Colorado By valuation Valuation-based fee per CPD Table 1 with a $20 minimum for work valued at $500 or less schedule 11 Nov 2026
Jefferson County Colorado By valuation Electrical permits not tied to an active building permit bill on the countywide valuation fee table with a $55 minimum... schedule 11 Nov 2026
Stamford Connecticut By valuation "Residential Electrical, plumbing, HVAC": "$13.00 per $1000 of construction value", minimum $60.00, plus $0.26 per... schedule 8 Nov 2026
New Castle County Delaware Not priced An electrical job needs no permit from New Castle County, which does not permit or inspect electrical work schedule 24 Nov 2026
Sussex County Delaware By valuation Set by the licensed inspection agency, not the county schedule 16 Nov 2026
Alachua County Florida By valuation No electrical-specific flat fee is published schedule 13 Aug 2026
Brevard County Florida By valuation Brevard's Residential Electrical Permit Application fee table lists a Building Code Review fee of $75.00 for the first... 8 Aug 2026
Broward County Florida By valuation Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.30 of the Building... schedule 11 Nov 2026
Charlotte County Florida By valuation At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a... 8 Aug 2026
Clay County Florida Flat fee New residential construction: minimum fee $50.00, and $80.00 for 0 - 200 ampere service up to $150.00 for 400 ampere... schedule 16 Nov 2026
Collier County Florida Per unit Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review Fees: "$100.00 plus applicable... schedule 18 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Hernando County Florida Flat fee Electric, Other: $165.00 schedule 16 Nov 2026
Hillsborough County Florida Flat fee Residential Electrical (General) trade permit fee is $130 flat for inspection-only work with no plan review, full fee... schedule 11 Nov 2026
Jacksonville Florida Flat fee City Fees schedule (Municipal Code Section 320.409), Electrical Permit Fees, new single-family residential occupancy:... schedule 17 Nov 2026
Lake County Florida Per unit Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square... schedule 13 Aug 2026
Lee County Florida Flat fee Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational... schedule 11 Nov 2026
Leon County Florida Per unit Fee Schedule, Residential Plan Review/Inspection (sq ft based): Electrical Plan Review $0.10 per sq ft, Electrical... schedule 17 Nov 2026
Manatee County Florida Flat fee Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046):... schedule 16 Nov 2026
Marion County Florida Flat fee Res Electrical Scope: $100.00, per Resolution 25-R-295 (effective Oct schedule 11 Nov 2026
Martin County Florida By valuation Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee... schedule 23 Oct 2026
Miami Florida By valuation Residential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost schedule 30 Oct 2026
Miami-Dade County Florida Per unit Residential wiring for new construction, additions, alterations and repairs is $0.113 per square foot, calculated on... schedule 11 Nov 2026
Orange County Florida Flat fee Minimum Electrical Permit fee is $38 flat, scaling with service amperage for new or upgraded service, for example $77... schedule 11 Nov 2026
Osceola County Florida Flat fee Appendix A's Electrical Permit Fees section lists a $125.00 base fee, plus 'Service - Up to 200 AMP' $45.00, 'Service... schedule 13 Aug 2026
Locality Pricing model What each electrical permit schedule says Verified
Palm Beach County Florida By valuation Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule schedule 11 Nov 2026
Pasco County Florida Flat fee Base fee $45 schedule 11 Nov 2026
Pinellas County Florida By valuation No flat generic electrical line schedule 11 Nov 2026
Polk County Florida Flat fee Residential electrical permit fee is $85.00 per Construction Fees Resolution 17-025 schedule 11 Nov 2026
Santa Rosa County Florida Per unit Resolution No. 2025-29 lists, under Electrical Permits, New Construction, 'Electrical Wiring Permit up to 800 amp (per... schedule 16 Nov 2026
Seminole County Florida Flat fee Electrical Permit, Residential: $165.00 per inspection, per the Building Division's Seminole County Permit Fees... schedule 11 Nov 2026
St. Johns County Florida Flat fee Electrical Permit Fees (F.S. 553-80): Permit Issuance Fee $16.00, plus itemized charges such as Simple Permanent... schedule 16 Nov 2026
Tampa Florida By valuation "Electrical (general) for all electrical-related activities not addressed below or any other fee table" $120.00 and... schedule 30 Oct 2026
Volusia County Florida Flat fee Volusia County Building Permit Fee Schedule (Resolution 2005-191, as revised October 1, 2026, reflecting a 3.5 percent... schedule 18 Nov 2026
Atlanta Georgia Flat fee Per the City of Atlanta's "Getting started" fee tables (a baseline reference schedule 18 Nov 2026
Cobb County Georgia Flat fee Electrical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1... schedule 11 Nov 2026
DeKalb County Georgia Flat fee DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Electrical Permit: "Minimum Permit Fee: $100 ($20... schedule 11 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Gwinnett County Georgia By valuation Planning and Development Fee Schedule, "Building Permit Fees (Effective August 25, 2026)" schedule 11 Nov 2026
Hawaii County Hawaii By valuation Hawaiʻi County Code section 5-7-3(b), "PERMIT FEES" table (Chapter 5 Construction Administrative Code, 2020, ord... schedule 16 Nov 2026
Honolulu Hawaii By valuation No per-item schedule is published for this project schedule 17 Nov 2026
Boise Idaho Flat fee Single branch circuit: $57.00 (Table 2-b) schedule 3 Oct 2026
Meridian Idaho Flat fee Building Electrical Fees: "Existing Residential": $40 permit fee plus $10 for each branch circuit schedule 23 Oct 2026
Chicago Illinois Flat fee Repair or alteration of devices on existing electrical circuits is $75 per service disconnecting means, and... schedule 11 Nov 2026
Cook County Illinois Per unit Cook County Code of Ordinances Sec. 32-1, Electrical Permit Fee Schedule, item 1-E SINGLE-FAMILY DWELLINGS: 0 to 499... schedule 15 Aug 2026
Fort Wayne Indiana Per unit Allen County Code 6-10-2-3, Electrical - Commercial & Residential schedule 15 Aug 2026
Indianapolis Indiana Flat fee DBNS Fee Schedule (Permits, as of 1.5.2026), Electrical Permit (ELE): "Installation-New Structure or Commercial... schedule 17 Nov 2026
Des Moines Iowa Flat fee "Electrical permit for electrical installations associated with alterations and additions to existing dwellings and... schedule 23 Oct 2026
Overland Park Kansas By valuation Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less... schedule 3 Oct 2026
Wichita Kansas Flat fee Electrical permit (UBTC Table I): 120 volt Circuit $2.00 each schedule 3 Oct 2026
Locality Pricing model What each electrical permit schedule says Verified
Lexington Kentucky Flat fee LFUCG electrical page: "Electrical permits cost $10 each." Inspection fees are set separately by the Commonwealth... schedule 3 Oct 2026
Louisville Kentucky Flat fee Louisville Metro Construction Review's Permit Fees page (LMCO 150.096): a service upgrade, new service, repairs or... schedule 16 Nov 2026
Baton Rouge Louisiana Flat fee Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus... schedule 16 Aug 2026
New Orleans Louisiana Flat fee $40 $40 application fee plus $3 per new circuit plus $0.30 per service amperage schedule 16 Aug 2026
Portland Maine Flat fee Electrical Permit Fees (Revised 7/2026): "Administrative Fee / Minimum Fee (applies to all electrical permits)"... schedule 8 Nov 2026
Anne Arundel County Maryland Flat fee Electrical, "Residential additions, alterations, remodeling (does not include service change or subpanel) | Any number... schedule 30 Oct 2026
Baltimore County Maryland Flat fee Electrical Permit Fee Schedule effective 11/26/18: Residential Service (each meter), new, modification, upgrade... schedule 16 Nov 2026
Howard County Maryland Flat fee $50 $50 non-refundable permit application fee plus a $50 flat fee for residential alterations and additions schedule 11 Nov 2026
Montgomery County Maryland Flat fee $111.94 $111.94 minimum fee for a residential one or two family dwelling electrical permit, charged in addition to itemized... schedule 11 Nov 2026
Prince George's County Maryland Flat fee DPIE Fee Schedule, effective October 16, 2026, prices electrical work by item, each stated as "Total Fee =... schedule 17 Nov 2026
Boston Massachusetts Per unit $20 $20 application fee plus $0.25 per amp for service upgrades or $1 per fixture for other work schedule 11 Nov 2026
Worcester Massachusetts Flat fee Flat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00" schedule 16 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Ann Arbor Michigan Flat fee Electrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no... schedule 15 Aug 2026
Detroit Michigan Per unit BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 schedule 15 Aug 2026
Grand Rapids Michigan Flat fee FY 2027 Planning, Design and Development Fee Schedule effective July 1, 2026, Electrical Permit Fees: "Application... schedule 15 Aug 2026
Sterling Heights Michigan Flat fee Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item schedule 15 Aug 2026
Minneapolis Minnesota By valuation No city fee schedule 11 Nov 2026
Saint Paul Minnesota By valuation Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work schedule 15 Aug 2026
Jackson Mississippi By valuation Jackson does not publish a current permit fee schedule online 8 Nov 2026
Kansas City Missouri By valuation Electrical permits for one- and two-family detached dwellings are priced from the same valuation table as every other... schedule 16 Nov 2026
St. Louis Missouri Flat fee Electrical permit fees are established by City Ordinance 70802 schedule 18 Nov 2026
Billings Montana Flat fee Electrical Permit Fees (PDF dated April 23, 2026, figures read from the image): single-family dwelling including a... schedule 8 Nov 2026
Lincoln Nebraska Flat fee Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE... 3 Oct 2026
Omaha Nebraska Per unit Omaha Municipal Code Sec. 44-130: minimum fee on all electrical work $25.00 schedule 16 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Clark County Nevada By valuation $54 $54 permit issuance fee under Table 3-B, with flat online simple permit fees of $61.88 for a re-tag or panel... schedule 11 Nov 2026
Henderson Nevada Flat fee No single flat electrical fee, charged per component: $190 per service including the first meter socket, plus... schedule 11 Nov 2026
Las Vegas Nevada Flat fee Table 3-D MPE FEES: "Receptacle, Switch, and Lighting Outlets - First 10" plan check $102, permit/inspection $105... schedule 30 Oct 2026
Manchester New Hampshire By valuation Building Code §109.8 11) Electrical Wiring: new one-unit residential dwelling $100.00, each additional unit $75.00 schedule 8 Nov 2026
Jersey City New Jersey Flat fee Electrical subcode charges $25 for the first block of 1 to 10 receptacles, fixtures or devices and $25 for each... 18 Jun 2026
Newark New Jersey By valuation Newark municipal code Chapter 7:2-3.2b: receptacles and fixtures, first 50 at $58 and each additional 20 at $12 schedule 15 Aug 2026
Albuquerque New Mexico By valuation "TABLE 112-B ELECTRICAL PERMIT FEES": "Administrative charge applicable to all applications and additions to permits"... schedule 23 Oct 2026
Bernalillo County New Mexico Flat fee Resolution 25-2009 Table 3-B Electrical Permit Fees: administrative charge $23.50 each schedule 23 Oct 2026
Buffalo New York Flat fee Electrical permit application: $50.00 application fee for all permits, plus a $100.00 plan review fee for all plans... schedule 15 Aug 2026
New York City New York By valuation Table 28-112.2 item 16, "Permit for electrical work," is "As provided by department rules." Those rules are 1 RCNY... schedule 15 Aug 2026
Rochester New York Flat fee Residential electrical inspection fees on the city's fee page: "New dwelling unit with service" $275.00 plus $120.00... schedule 17 Nov 2026
Town of Brookhaven New York By valuation Town of Brookhaven Building Division Fee Schedule 2026, Construction table: the schedule has no line naming an... schedule 11 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Town of Hempstead New York By valuation Town Code § 86-11, the Building Department fee section, has no line naming an electrical permit schedule 11 Nov 2026
Charlotte North Carolina By valuation Electrical permits are charged as a trade permit under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 in... schedule 16 Nov 2026
Durham North Carolina Flat fee Electrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge): "Minimum electrical permit fee" $65.00 schedule 23 Oct 2026
Greensboro North Carolina Per unit Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00' schedule 17 Nov 2026
Mecklenburg County North Carolina Per unit Electrical trade permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring... schedule 11 Nov 2026
Raleigh North Carolina By valuation The FY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027) enumerates stand-alone... schedule 23 Oct 2026
Wake County North Carolina Flat fee 'Residential Trade Permit Fee - $75 schedule 17 Nov 2026
Fargo North Dakota By valuation The city publishes no electrical fee schedule schedule 16 Nov 2026
Cincinnati Ohio By valuation The City of Cincinnati fee schedule carries no electrical line item because the work is outsourced schedule 16 Aug 2026
Cleveland Ohio Flat fee Electrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee for any permit shall be $50.00" schedule 15 Aug 2026
Columbus Ohio Flat fee Electrical work for a 1, 2, and 3 family dwelling uses the Mechanical, Electrical, and Plumbing line, $275 (includes 2... schedule 11 Nov 2026
Franklin County Ohio Flat fee Franklin County EDP Fee Schedule, effective Jan schedule 16 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Oklahoma City Oklahoma Flat fee Oklahoma City Municipal Code Chapter 60, General Schedule of Fees, Section 60-18-16(a) "residential add-on, remodel... schedule 17 Nov 2026
Tulsa Oklahoma Flat fee Title 49, Chapter 4, Section 401 sets residential electrical permit fees for one- and two-family dwellings for new... schedule 16 Nov 2026
Eugene Oregon By valuation From the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F)... schedule 16 Aug 2026
Portland Oregon Per unit Electrical Permit Fee Schedule for the City of Portland, effective July 10, 2026 schedule 16 Aug 2026
Philadelphia Pennsylvania By valuation $100 $100 filing fee (nonrefundable) schedule 11 Nov 2026
Pittsburgh Pennsylvania By valuation 2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value... schedule 15 Aug 2026
Providence Rhode Island By valuation Trade permit fee by project valuation schedule 30 Oct 2026
Charleston South Carolina Flat fee A $40.00 non-refundable application fee, which the schedule says "is in addition to the Electrical Permit Fee," plus... schedule 16 Aug 2026
Columbia South Carolina By valuation Electrical work at a one or two family dwelling is priced under Code of Ordinances Sec. 5-204(a)(2) alongside... schedule 16 Nov 2026
Greenville County South Carolina Per unit Electrical Permit Fees: minimum fee per permit $72.00 schedule 23 Oct 2026
Sioux Falls South Dakota By valuation 2026 Mechanical, Electrical, or Plumbing Permit Fees (City of Sioux Falls PDF): the fee is set on the MEP valuation... schedule 30 Oct 2026
Memphis Tennessee Flat fee E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00, E-6.2 EXISTING RESIDENTIAL 1&2 FAMILY OCCUPANCIES... schedule 16 Aug 2026
Locality Pricing model What each electrical permit schedule says Verified
Nashville Tennessee Flat fee Itemized charges for circuits, panels, services and appliances, with a $75 minimum fee per permit, per Metro Code... schedule 11 Nov 2026
Williamson County Tennessee Flat fee State-issued via the TN CORE system: the issuing agent may charge up to $5.00 for the permit, plus inspection fees... schedule 11 Nov 2026
Arlington Texas Not priced Planning and Development Services Fee Schedule, Effective October 1, 2026, Resolution No. 26 - 288, Building Permit... schedule 16 Nov 2026
Austin Texas Flat fee Electrical Base Fee is $183.69 under the Single Family, Duplex, Townhouse, and Other Residential Structure Fees, per... schedule 11 Nov 2026
Corpus Christi Texas Per unit Electrical trade permits: residential $0.075 per square foot, minimum fee $146.41 (commercial is the greater of the... schedule 16 Nov 2026
Dallas Texas Flat fee The Permit Fee Schedule effective July 1, 2025 has no electrical-specific residential line schedule 11 Nov 2026
El Paso Texas By valuation FY 2027 Schedule C Departmental Fee List, Planning & Inspections, Electrical Permits: base fee $110 (non-refundable)... schedule 16 Nov 2026
Fort Worth Texas Flat fee Billed per item on the electrical fee schedule: services and subpanels 60 amps to 100 amps $19.75, over 100 amps to... schedule 16 Nov 2026
Houston Texas Flat fee Minimum electrical permit fee is $91.06 plus the $33.56 administrative fee, with itemized charges per outlet, fixture... schedule 11 Nov 2026
Lubbock Texas Per unit Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September 30, 2026, under Electrical... schedule 15 Aug 2026
Plano Texas Per unit Building Inspections Fee Schedule effective Jan schedule 15 Aug 2026
San Antonio Texas Flat fee For work on an existing home, a $57.50 Electrical Permit Base Fee, then a service rating charge by amperage ($3.74 for... schedule 11 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Salt Lake City Utah Per unit Residential electrical: "Base Fee" $59 schedule 30 Oct 2026
Burlington Vermont By valuation Wiring permits are $8.50 for every $1,000.00 of the estimated cost of the work, with a minimum of $50.00 per permit... schedule 16 Nov 2026
Arlington County Virginia By valuation Fees per FY27 ISD fee schedule schedule 11 Nov 2026
Chesterfield County Virginia Flat fee $171.00 $171.00 for a new single family dwelling schedule 11 Nov 2026
Fairfax County Virginia Flat fee Residential addition or alteration electrical work starts at the $141.75 base fee for Level One (1 to 100 fixtures... schedule 11 Nov 2026
Fauquier County Virginia Flat fee A single-trade electrical permit is $84.15 including the technology fee at the $75 minimum schedule 11 Nov 2026
Henrico County Virginia By valuation Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per... schedule 11 Nov 2026
Loudoun County Virginia Flat fee Base fee for adding, replacing or relocating fixtures, receptacles or circuits in a 1 or 2 family dwelling is $70 schedule 11 Nov 2026
Orange County Virginia Per unit Billed under the residential Trades category at $0.15 per square foot with a $100 minimum, plus Virginia's 2% state... schedule 11 Nov 2026
Prince William County Virginia Flat fee Existing-dwelling electrical work is a base fee of $44.23 ($55.35 with surcharges) plus itemized add-ons: fixtures or... schedule 11 Nov 2026
Spotsylvania County Virginia Flat fee Minimum electrical permit is $100, totaling $147 over the counter after the 2% building surcharge and $45 processing... schedule 11 Nov 2026
Stafford County Virginia Flat fee Residential electrical trade work bills under the All Trades line at $60 per trade per system, plus the 2 percent... schedule 11 Nov 2026
Locality Pricing model What each electrical permit schedule says Verified
Bellevue Washington By valuation Electrical permit fee by valuation per Table 6 of Ordinance 6879, $79 inspection fee minimum for valuation up to $500... schedule 11 Nov 2026
Clark County Washington State-issued No county fee 11 Nov 2026
King County Washington Flat fee Set by state L&I, not King County, under WAC 296-46B-906 (effective 7/1/2026): new single or two family home wiring... schedule 11 Nov 2026
Pierce County Washington State-issued No county fee 11 Nov 2026
Seattle Washington Flat fee Itemized per Fee Subtitle Table D-15: minimum $105.12 for a standard online self-issued permit plus a $55.48... schedule 11 Nov 2026
Snohomish County Washington State-issued No county fee 11 Nov 2026
Tacoma Washington By valuation No Planning and Development Services fee schedule 11 Nov 2026
Thurston County Washington By valuation L&I sets electrical permit fees schedule 11 Nov 2026
Berkeley County West Virginia By valuation No separate electrical permit fee appears on the county fee schedule schedule 8 Nov 2026
Madison Wisconsin Per unit MGO 19.11, Group IV, Alterations And Special Fees (repealed and recreated by ORD-21-00026, 3-26-21): "$25.00 first ten... schedule 16 Aug 2026
Milwaukee Wisconsin Flat fee Electrical permit fees are not reproduced in the Plan Review and Permit Fees schedule schedule 16 Aug 2026
Cheyenne Wyoming By valuation Valuation-based, from the City of Cheyenne Building and Construction Permit Fees table in City Code 15.08.030... schedule 8 Nov 2026

172 rows, every one taken from the jurisdiction's published schedule for electrical permits and linked to its page. Every electrical permit row also sits inside the cross-type study at what building permits cost.

Cite this data

PermitNotebook (2026). Electrical Permit fees and requirements in 172 US localities, verified against published fee schedules. https://permitnotebook.com/permits/electrical/

Electrical Permit rules by state

State Localities Required Conditional Not required Thresholds published
Florida 31 26 5 0 None published
California uniform 15 15 0 0 None published
Virginia 12 6 6 0 None published
Texas 11 10 0 0 None published
Arizona 9 6 3 0 None published
Washington uniform 8 8 0 0 None published
North Carolina 6 1 5 0 None published
Maryland 5 3 2 0 None published
New York 5 2 3 0 None published
Georgia 4 2 2 0 None published
Michigan 4 1 3 0 None published
Ohio 4 2 2 0 None published
Colorado 3 2 1 0 None published
Nevada uniform 3 0 3 0 None published
South Carolina uniform 3 0 3 0 None published
Tennessee uniform 3 3 0 0 None published
Delaware uniform 2 2 0 0 None published
Hawaii 2 1 1 0 None published
Idaho uniform 2 2 0 0 None published
Illinois uniform 2 2 0 0 None published
Indiana uniform 2 0 2 0 None published
Kansas uniform 2 2 0 0 None published
Kentucky uniform 2 2 0 0 None published
Louisiana 2 1 1 0 None published
Massachusetts uniform 2 2 0 0 None published
Minnesota uniform 2 2 0 0 None published
Missouri uniform 2 0 2 0 None published
Nebraska 2 1 1 0 None published
New Jersey 2 1 1 0 None published
New Mexico uniform 2 0 2 0 None published
Oklahoma uniform 2 0 2 0 None published
Oregon 2 1 1 0 None published
Pennsylvania 2 1 1 0 None published
Wisconsin uniform 2 0 2 0 None published
Alabama 1 1 0 0 None published
Alaska 1 0 1 0 None published
Arkansas 1 1 0 0 None published
Connecticut 1 1 0 0 None published
Iowa 1 1 0 0 None published
Maine 1 1 0 0 None published
Mississippi 1 1 0 0 None published
Montana 1 1 0 0 None published
New Hampshire 1 1 0 0 None published
North Dakota 1 1 0 0 None published
Rhode Island 1 0 1 0 None published
South Dakota 1 0 1 0 5 outlets, switches, receptacles or fixtures
Utah 1 1 0 0 None published
Vermont 1 0 1 0 $1,000
West Virginia 1 1 0 0 None published
Wyoming 1 1 0 0 None published

A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.

How electrical permits work, start to finish

Applying

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

Inspections and close-out

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

This is common practice under the model codes, not any one office's procedure. Some places build under their own code instead, such as New York City's Construction Codes and Wisconsin's Uniform Dwelling Code. Each locality page carries that office's own permit page, fees and portal. Sources: International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted), International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions.

Common questions about electrical permits

Do I need a permit to replace an outlet or a light switch?
Often not, if it is a same-for-same swap in the existing box. 45 of the 58 offices we read with a separate electrical exemption list name outlets, receptacles or switches on it, and many offices without one still allow the swap in their own rules, Phoenix among them, while Virginia exempts it statewide. Read your own office's wording, because the conditions differ. Kansas City, Missouri, for example, exempts replacement of "snap switches, receptacles and fixtures (other than ceiling fans) where no alteration or extension of an existing circuit is required."
Do I need a permit to add an outlet or a new circuit?
Almost always. A new outlet, a new circuit or an extended circuit is new wiring, and nearly every electrical exemption we have read covers only repairs and same-for-same replacements; Sioux Falls, South Dakota, is the rare exception, letting a few outlets or one small circuit go without a permit. Overland Park, Kansas, puts it plainly: a permit is required for "new or extended branch circuits, adding fixtures or receptacles to an existing circuit or adding or upgrading an electrical service."
Do I need a permit to install a ceiling fan?
Usually, unless it hangs on a box already rated and wired for a fan and your office exempts fixture swaps. Kansas City excludes ceiling fans from its fixture exemption by name, and Tucson, Arizona, requires a permit for "new wired lighting, ceiling fans, or electrical outlets".
Can a homeowner pull their own electrical permit?
In many places, for their own home and only for work they do themselves. 53 of the 177 electrical rules we read mention owners or homeowners, usually to say who may pull the permit. State licensing law decides it, so the answer differs by state; see our guide to whether a homeowner can pull an electrical permit.

Find the electrical permit rule where you live

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning more than an electrical permit? Check your whole project