Do you need an electrical permit?
Yes for anything new; a same-for-same swap is the narrow exception
Adding an outlet, a light, a circuit or a ceiling fan box, or touching the panel, needs an electrical permit nearly everywhere. Replacing a worn outlet, switch or fixture with the same kind, on the same box and circuit, is the one job many offices let you skip.
We read the electrical rule of 177 US counties and cities. 119 treat electrical work in general as permitted work; 58 publish a separate list of exempt minor work, and outlets, receptacles or switches appear on 45 of those lists, light fixtures on 35. Many of the 119 still allow a like-for-like swap in their own rules: Phoenix lets you replace a switch or receptacle in kind without a permit, and Virginia's statewide code exempts replacing switches, receptacles, light fixtures and ceiling fans in a house.
Where are you working?
Your office decides which swaps are exempt. Its own list:
The jobs that need a permit almost everywhere
The line offices draw is between replacing what is there and adding to it. These sit on the permit side of that line in nearly every electrical rule we have read (Sioux Falls, South Dakota, which counts outlets and circuits before it requires a permit, is the rare exception):
- A new outlet, switch or light where there was none, including a hardwired fixture that replaces a plug-in lamp.
- A new or extended circuit, for a kitchen, a bathroom, an addition, a hot tub or a car charger.
- Panel and service work: a new panel, a subpanel, a service upgrade, a meter base.
- Equipment that brings its own wiring: a standby generator, a solar array, an EV charger.
Two offices, in their own words:
“A permit is required for new or extended branch circuits, adding fixtures or receptacles to an existing circuit or adding or upgrading an electrical service.”
Overland Park, Kansas (its permits page)
“Installing new wired lighting, ceiling fans, or electrical outlets requires a permit. This includes fixtures like chandeliers, recessed lights, and wall sconces that are hardwired, not plug-in.”
Tucson, Arizona (its permit exemptions page)
Car chargers and solar have their own national pages: EV charger permits and solar permits.
The swap exemption, and its fine print
Virginia writes the swap into its statewide code, for houses: “Replacement of general use snap switches, dimmer and control switches, 125 volt-15 or 20 ampere receptacles, luminaires (lighting fixtures), and ceiling (paddle) fans” (13VAC5-63-80, item 14.3, read 18 Nov 2026). Elsewhere the exemption is local, and narrower.
The International Residential Code, the starting point for most state codes, keeps its electrical exemptions short (Section R105.2): minor repairs such as replacing lamps, plugging approved equipment into existing receptacles, reinstalling a receptacle but not the outlet behind it, replacing a breaker or fuse of the required size in the same place, and low-voltage wiring. Local codes reword and extend that list, and the wording decides what you can do.
“Replacement of snap switches, receptacles and fixtures (other than ceiling fans) where no alteration or extension of an existing circuit is required.”
Kansas City, Missouri (its exempt work list)
“A permit is required for alterations to electrical systems that involve more than replacing switches or receptacles”
Detroit, Michigan (its “Do I need a permit” sheet)
Read your office’s list for three details that trip people up:
- The box, not just the device. Las Vegas exempts “Replacement of receptacles, but not the outlet box.” Moving or enlarging the box is new work.
- Same type means same type. A smart switch that needs a neutral wire the box does not have is no longer a swap: it means new wiring.
- A fixture is not a fan. A ceiling fan is heavier than the light it replaces and needs a box rated for it, which is why Kansas City carves fans out of its fixture exemption.
Doing it yourself: a different question from the permit
Whether the work needs a permit and who may do it are separate rules. The permit rule is local; who may wire a house is usually state licensing law, and many states let an owner pull a permit for their own home and do the work themselves while barring them from doing it for anyone else. Corpus Christi, Texas, for example, tells owners: “Homeowners performing their own mechanical, electrical or plumbing work on their homestead may apply for a trade permit.”
The full state-by-state picture is in can a homeowner pull an electrical permit, and the item-by-item list of what needs a permit is in electrical work that needs a permit.
Every published line, office by office
Measured in outlets, switches, receptacles or fixtures (1 jurisdiction)
| Threshold | Jurisdictions | Where |
|---|---|---|
| 5 outlets, switches, receptacles or fixtures | 1 | Sioux Falls |
Measured in USD (1 jurisdiction)
| Threshold | Jurisdictions | Where |
|---|---|---|
| $1,000 | 1 | Burlington |
Thresholds are recorded as the jurisdiction states them. Which side of the number triggers the permit varies, so read your own locality's page before relying on one.
What an electrical permit costs
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Birmingham Alabama | By valuation | Technical Code of the City of Birmingham, 2024 (effective 10/1/2024), Article V: "ELECTRICAL PERMIT FEES .. schedule | 30 Oct 2026 |
| Anchorage Alaska | Flat fee | AMC 23.10.109 Table 3-A item 3.A, "Trade Permits (Plumbing, mechanical, or electrical work but no structural or... schedule | 30 Oct 2026 |
| Chandler Arizona | By valuation | Flat $100.00 for an electrical service of 400 amps or less and flat $100.00 for miscellaneous minor residential work... schedule | 11 Nov 2026 |
| Gilbert Arizona | Flat fee | Individual Electrical Permit, residential: $150 (fee schedule revised 7/1/2026) schedule | 17 Nov 2026 |
| Maricopa County Arizona | Flat fee | Flat rate by residential service size, $50 for 1-200 amps, $75 for 201-400 amps, $120 over 400 amps, per the Summary... schedule | 11 Nov 2026 |
| Mesa Arizona | By valuation | A stand-alone electrical permit is valuation based on the Residential Rate Table, $220 for the $0 to $8,333 bracket... schedule | 11 Nov 2026 |
| Peoria Arizona | By valuation | Valuation-based building permit fee, minimum 87 dollars (Development Fee Schedule Rev 9/2025) schedule | 11 Nov 2026 |
| Phoenix Arizona | By valuation | Electrical permits have no dedicated fee line schedule | 11 Nov 2026 |
| Pima County Arizona | Flat fee | Tiered by scope: minor electrical work (service upgrade, electrical reconnect, addition of up to five circuits) is $27... schedule | 11 Nov 2026 |
| Scottsdale Arizona | Flat fee | Typical single-family electrical work (rewire, panel relocation, service upgrade to 400 amp) is a no-plan-review... schedule | 11 Nov 2026 |
| Tucson Arizona | Flat fee | "4-02.9.1 Trade Permits": $150.00, listed items include "C. Replace Electric Service Panel (like for like schedule | 23 Oct 2026 |
| Little Rock Arkansas | Per unit | Repair/alteration/addition items, for example openings 1 to 20, $12.36 schedule | 30 Oct 2026 |
| Alameda County California | By valuation | Building Inspection Department Service Fee Schedule (Schedule A, effective July 1, 2024): where electrical work is... schedule | 15 Aug 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Contra Costa County California | By valuation | Land Development Fee Schedule S-002 C.6, "Electrical Permit (Other) $75.00 minimum." Electrical inspection fees for an... schedule | 15 Aug 2026 |
| Fresno County California | Flat fee | Section 2511 Electrical Code Fees, FY 2026-27: Issuing permits $42.77 each schedule | 16 Nov 2026 |
| Los Angeles California | Flat fee | Itemized per installed item per the LADBS Electrical Permit Fee Schedule (rev 12/2016): minimum $55 for one item under... schedule | 11 Nov 2026 |
| Los Angeles County California | Per unit | Electrical Code Fee Schedule (Title 27 of the County of Los Angeles Code, Ord No. 2013-0049), effective July 1, 2026:... schedule | 16 Nov 2026 |
| Orange County California | By valuation | Electrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27 schedule | 16 Nov 2026 |
| Riverside County California | Flat fee | Residential Electrical (BEL-RELE): $448.20 fixed fee schedule | 16 Nov 2026 |
| Sacramento California | Flat fee | Flat $105 permit fee for one-trade minor electrical work such as a panel change-out, rewire or new circuit, plus a 10%... schedule | 11 Nov 2026 |
| Sacramento County California | By valuation | No electrical line item is published schedule | 15 Aug 2026 |
| San Bernardino County California | Flat fee | County Code 16.0204(b)(1) sets residential electrical fees effective July 1, 2026: "Meter change out and upgrades... schedule | 17 Nov 2026 |
| San Diego California | Per unit | Billed per circuit or panel under IB-103 Table 2 effective May 2026: circuits 15-45 amps $176.57 for the first 5... schedule | 11 Nov 2026 |
| San Diego County California | Flat fee | PDS 613 (effective 07/10/2026, FY 25/26) line item "Electrical Only": Permit Fee $392.00, no plan review fee schedule | 15 Aug 2026 |
| San Francisco California | Flat fee | Table 1A-E Electrical Permit Issuance and Inspection ("July 2026", fees for permits issued on and after July 12... schedule | 30 Oct 2026 |
| San Jose California | Flat fee | The greater of $315 per hour of required inspection time or an itemized fixture-based schedule, charged in addition to... schedule | 11 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Santa Clara County California | By valuation | Single-family electrical work is a minor permit under the county's Building Fee Schedule - FY 2026-2027 (effective... schedule | 16 Nov 2026 |
| Aurora Colorado | Flat fee | On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)") the line item "Residential... schedule | 16 Nov 2026 |
| Denver Colorado | By valuation | Valuation-based fee per CPD Table 1 with a $20 minimum for work valued at $500 or less schedule | 11 Nov 2026 |
| Jefferson County Colorado | By valuation | Electrical permits not tied to an active building permit bill on the countywide valuation fee table with a $55 minimum... schedule | 11 Nov 2026 |
| Stamford Connecticut | By valuation | "Residential Electrical, plumbing, HVAC": "$13.00 per $1000 of construction value", minimum $60.00, plus $0.26 per... schedule | 8 Nov 2026 |
| New Castle County Delaware | Not priced | An electrical job needs no permit from New Castle County, which does not permit or inspect electrical work schedule | 24 Nov 2026 |
| Sussex County Delaware | By valuation | Set by the licensed inspection agency, not the county schedule | 16 Nov 2026 |
| Alachua County Florida | By valuation | No electrical-specific flat fee is published schedule | 13 Aug 2026 |
| Brevard County Florida | By valuation | Brevard's Residential Electrical Permit Application fee table lists a Building Code Review fee of $75.00 for the first... | 8 Aug 2026 |
| Broward County Florida | By valuation | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.30 of the Building... schedule | 11 Nov 2026 |
| Charlotte County Florida | By valuation | At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a... | 8 Aug 2026 |
| Clay County Florida | Flat fee | New residential construction: minimum fee $50.00, and $80.00 for 0 - 200 ampere service up to $150.00 for 400 ampere... schedule | 16 Nov 2026 |
| Collier County Florida | Per unit | Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review Fees: "$100.00 plus applicable... schedule | 18 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Hernando County Florida | Flat fee | Electric, Other: $165.00 schedule | 16 Nov 2026 |
| Hillsborough County Florida | Flat fee | Residential Electrical (General) trade permit fee is $130 flat for inspection-only work with no plan review, full fee... schedule | 11 Nov 2026 |
| Jacksonville Florida | Flat fee | City Fees schedule (Municipal Code Section 320.409), Electrical Permit Fees, new single-family residential occupancy:... schedule | 17 Nov 2026 |
| Lake County Florida | Per unit | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square... schedule | 13 Aug 2026 |
| Lee County Florida | Flat fee | Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational... schedule | 11 Nov 2026 |
| Leon County Florida | Per unit | Fee Schedule, Residential Plan Review/Inspection (sq ft based): Electrical Plan Review $0.10 per sq ft, Electrical... schedule | 17 Nov 2026 |
| Manatee County Florida | Flat fee | Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046):... schedule | 16 Nov 2026 |
| Marion County Florida | Flat fee | Res Electrical Scope: $100.00, per Resolution 25-R-295 (effective Oct schedule | 11 Nov 2026 |
| Martin County Florida | By valuation | Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee... schedule | 23 Oct 2026 |
| Miami Florida | By valuation | Residential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost schedule | 30 Oct 2026 |
| Miami-Dade County Florida | Per unit | Residential wiring for new construction, additions, alterations and repairs is $0.113 per square foot, calculated on... schedule | 11 Nov 2026 |
| Orange County Florida | Flat fee | Minimum Electrical Permit fee is $38 flat, scaling with service amperage for new or upgraded service, for example $77... schedule | 11 Nov 2026 |
| Osceola County Florida | Flat fee | Appendix A's Electrical Permit Fees section lists a $125.00 base fee, plus 'Service - Up to 200 AMP' $45.00, 'Service... schedule | 13 Aug 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Palm Beach County Florida | By valuation | Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule schedule | 11 Nov 2026 |
| Pasco County Florida | Flat fee | Base fee $45 schedule | 11 Nov 2026 |
| Pinellas County Florida | By valuation | No flat generic electrical line schedule | 11 Nov 2026 |
| Polk County Florida | Flat fee | Residential electrical permit fee is $85.00 per Construction Fees Resolution 17-025 schedule | 11 Nov 2026 |
| Santa Rosa County Florida | Per unit | Resolution No. 2025-29 lists, under Electrical Permits, New Construction, 'Electrical Wiring Permit up to 800 amp (per... schedule | 16 Nov 2026 |
| Seminole County Florida | Flat fee | Electrical Permit, Residential: $165.00 per inspection, per the Building Division's Seminole County Permit Fees... schedule | 11 Nov 2026 |
| St. Johns County Florida | Flat fee | Electrical Permit Fees (F.S. 553-80): Permit Issuance Fee $16.00, plus itemized charges such as Simple Permanent... schedule | 16 Nov 2026 |
| Tampa Florida | By valuation | "Electrical (general) for all electrical-related activities not addressed below or any other fee table" $120.00 and... schedule | 30 Oct 2026 |
| Volusia County Florida | Flat fee | Volusia County Building Permit Fee Schedule (Resolution 2005-191, as revised October 1, 2026, reflecting a 3.5 percent... schedule | 18 Nov 2026 |
| Atlanta Georgia | Flat fee | Per the City of Atlanta's "Getting started" fee tables (a baseline reference schedule | 18 Nov 2026 |
| Cobb County Georgia | Flat fee | Electrical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1... schedule | 11 Nov 2026 |
| DeKalb County Georgia | Flat fee | DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Electrical Permit: "Minimum Permit Fee: $100 ($20... schedule | 11 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Gwinnett County Georgia | By valuation | Planning and Development Fee Schedule, "Building Permit Fees (Effective August 25, 2026)" schedule | 11 Nov 2026 |
| Hawaii County Hawaii | By valuation | Hawaiʻi County Code section 5-7-3(b), "PERMIT FEES" table (Chapter 5 Construction Administrative Code, 2020, ord... schedule | 16 Nov 2026 |
| Honolulu Hawaii | By valuation | No per-item schedule is published for this project schedule | 17 Nov 2026 |
| Boise Idaho | Flat fee | Single branch circuit: $57.00 (Table 2-b) schedule | 3 Oct 2026 |
| Meridian Idaho | Flat fee | Building Electrical Fees: "Existing Residential": $40 permit fee plus $10 for each branch circuit schedule | 23 Oct 2026 |
| Chicago Illinois | Flat fee | Repair or alteration of devices on existing electrical circuits is $75 per service disconnecting means, and... schedule | 11 Nov 2026 |
| Cook County Illinois | Per unit | Cook County Code of Ordinances Sec. 32-1, Electrical Permit Fee Schedule, item 1-E SINGLE-FAMILY DWELLINGS: 0 to 499... schedule | 15 Aug 2026 |
| Fort Wayne Indiana | Per unit | Allen County Code 6-10-2-3, Electrical - Commercial & Residential schedule | 15 Aug 2026 |
| Indianapolis Indiana | Flat fee | DBNS Fee Schedule (Permits, as of 1.5.2026), Electrical Permit (ELE): "Installation-New Structure or Commercial... schedule | 17 Nov 2026 |
| Des Moines Iowa | Flat fee | "Electrical permit for electrical installations associated with alterations and additions to existing dwellings and... schedule | 23 Oct 2026 |
| Overland Park Kansas | By valuation | Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less... schedule | 3 Oct 2026 |
| Wichita Kansas | Flat fee | Electrical permit (UBTC Table I): 120 volt Circuit $2.00 each schedule | 3 Oct 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Lexington Kentucky | Flat fee | LFUCG electrical page: "Electrical permits cost $10 each." Inspection fees are set separately by the Commonwealth... schedule | 3 Oct 2026 |
| Louisville Kentucky | Flat fee | Louisville Metro Construction Review's Permit Fees page (LMCO 150.096): a service upgrade, new service, repairs or... schedule | 16 Nov 2026 |
| Baton Rouge Louisiana | Flat fee | Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus... schedule | 16 Aug 2026 |
| New Orleans Louisiana | Flat fee | $40 $40 application fee plus $3 per new circuit plus $0.30 per service amperage schedule | 16 Aug 2026 |
| Portland Maine | Flat fee | Electrical Permit Fees (Revised 7/2026): "Administrative Fee / Minimum Fee (applies to all electrical permits)"... schedule | 8 Nov 2026 |
| Anne Arundel County Maryland | Flat fee | Electrical, "Residential additions, alterations, remodeling (does not include service change or subpanel) | Any number... schedule | 30 Oct 2026 |
| Baltimore County Maryland | Flat fee | Electrical Permit Fee Schedule effective 11/26/18: Residential Service (each meter), new, modification, upgrade... schedule | 16 Nov 2026 |
| Howard County Maryland | Flat fee | $50 $50 non-refundable permit application fee plus a $50 flat fee for residential alterations and additions schedule | 11 Nov 2026 |
| Montgomery County Maryland | Flat fee | $111.94 $111.94 minimum fee for a residential one or two family dwelling electrical permit, charged in addition to itemized... schedule | 11 Nov 2026 |
| Prince George's County Maryland | Flat fee | DPIE Fee Schedule, effective October 16, 2026, prices electrical work by item, each stated as "Total Fee =... schedule | 17 Nov 2026 |
| Boston Massachusetts | Per unit | $20 $20 application fee plus $0.25 per amp for service upgrades or $1 per fixture for other work schedule | 11 Nov 2026 |
| Worcester Massachusetts | Flat fee | Flat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00" schedule | 16 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Ann Arbor Michigan | Flat fee | Electrical Permit Fees (effective January 2020): $15 base application fee for all permits, non refundable with no... schedule | 15 Aug 2026 |
| Detroit Michigan | Per unit | BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025, ELECTRICAL PART A: "Base fee" $66 schedule | 15 Aug 2026 |
| Grand Rapids Michigan | Flat fee | FY 2027 Planning, Design and Development Fee Schedule effective July 1, 2026, Electrical Permit Fees: "Application... schedule | 15 Aug 2026 |
| Sterling Heights Michigan | Flat fee | Electrical Permit Application 26-27: non-refundable application fee $55.00, then per item schedule | 15 Aug 2026 |
| Minneapolis Minnesota | By valuation | No city fee schedule | 11 Nov 2026 |
| Saint Paul Minnesota | By valuation | Sec. 33.04(g)(4) sets a minimum permit fee of $85.00 for one-family dwelling electrical work schedule | 15 Aug 2026 |
| Jackson Mississippi | By valuation | Jackson does not publish a current permit fee schedule online | 8 Nov 2026 |
| Kansas City Missouri | By valuation | Electrical permits for one- and two-family detached dwellings are priced from the same valuation table as every other... schedule | 16 Nov 2026 |
| St. Louis Missouri | Flat fee | Electrical permit fees are established by City Ordinance 70802 schedule | 18 Nov 2026 |
| Billings Montana | Flat fee | Electrical Permit Fees (PDF dated April 23, 2026, figures read from the image): single-family dwelling including a... schedule | 8 Nov 2026 |
| Lincoln Nebraska | Flat fee | Electrical Fees page, City/County Contractors Fees tab ('Fees are subject to change with each code cycle.'): BASE FEE... | 3 Oct 2026 |
| Omaha Nebraska | Per unit | Omaha Municipal Code Sec. 44-130: minimum fee on all electrical work $25.00 schedule | 16 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Clark County Nevada | By valuation | $54 $54 permit issuance fee under Table 3-B, with flat online simple permit fees of $61.88 for a re-tag or panel... schedule | 11 Nov 2026 |
| Henderson Nevada | Flat fee | No single flat electrical fee, charged per component: $190 per service including the first meter socket, plus... schedule | 11 Nov 2026 |
| Las Vegas Nevada | Flat fee | Table 3-D MPE FEES: "Receptacle, Switch, and Lighting Outlets - First 10" plan check $102, permit/inspection $105... schedule | 30 Oct 2026 |
| Manchester New Hampshire | By valuation | Building Code §109.8 11) Electrical Wiring: new one-unit residential dwelling $100.00, each additional unit $75.00 schedule | 8 Nov 2026 |
| Jersey City New Jersey | Flat fee | Electrical subcode charges $25 for the first block of 1 to 10 receptacles, fixtures or devices and $25 for each... | 18 Jun 2026 |
| Newark New Jersey | By valuation | Newark municipal code Chapter 7:2-3.2b: receptacles and fixtures, first 50 at $58 and each additional 20 at $12 schedule | 15 Aug 2026 |
| Albuquerque New Mexico | By valuation | "TABLE 112-B ELECTRICAL PERMIT FEES": "Administrative charge applicable to all applications and additions to permits"... schedule | 23 Oct 2026 |
| Bernalillo County New Mexico | Flat fee | Resolution 25-2009 Table 3-B Electrical Permit Fees: administrative charge $23.50 each schedule | 23 Oct 2026 |
| Buffalo New York | Flat fee | Electrical permit application: $50.00 application fee for all permits, plus a $100.00 plan review fee for all plans... schedule | 15 Aug 2026 |
| New York City New York | By valuation | Table 28-112.2 item 16, "Permit for electrical work," is "As provided by department rules." Those rules are 1 RCNY... schedule | 15 Aug 2026 |
| Rochester New York | Flat fee | Residential electrical inspection fees on the city's fee page: "New dwelling unit with service" $275.00 plus $120.00... schedule | 17 Nov 2026 |
| Town of Brookhaven New York | By valuation | Town of Brookhaven Building Division Fee Schedule 2026, Construction table: the schedule has no line naming an... schedule | 11 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Town of Hempstead New York | By valuation | Town Code § 86-11, the Building Department fee section, has no line naming an electrical permit schedule | 11 Nov 2026 |
| Charlotte North Carolina | By valuation | Electrical permits are charged as a trade permit under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 in... schedule | 16 Nov 2026 |
| Durham North Carolina | Flat fee | Electrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge): "Minimum electrical permit fee" $65.00 schedule | 23 Oct 2026 |
| Greensboro North Carolina | Per unit | Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00' schedule | 17 Nov 2026 |
| Mecklenburg County North Carolina | Per unit | Electrical trade permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring... schedule | 11 Nov 2026 |
| Raleigh North Carolina | By valuation | The FY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027) enumerates stand-alone... schedule | 23 Oct 2026 |
| Wake County North Carolina | Flat fee | 'Residential Trade Permit Fee - $75 schedule | 17 Nov 2026 |
| Fargo North Dakota | By valuation | The city publishes no electrical fee schedule schedule | 16 Nov 2026 |
| Cincinnati Ohio | By valuation | The City of Cincinnati fee schedule carries no electrical line item because the work is outsourced schedule | 16 Aug 2026 |
| Cleveland Ohio | Flat fee | Electrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee for any permit shall be $50.00" schedule | 15 Aug 2026 |
| Columbus Ohio | Flat fee | Electrical work for a 1, 2, and 3 family dwelling uses the Mechanical, Electrical, and Plumbing line, $275 (includes 2... schedule | 11 Nov 2026 |
| Franklin County Ohio | Flat fee | Franklin County EDP Fee Schedule, effective Jan schedule | 16 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Oklahoma City Oklahoma | Flat fee | Oklahoma City Municipal Code Chapter 60, General Schedule of Fees, Section 60-18-16(a) "residential add-on, remodel... schedule | 17 Nov 2026 |
| Tulsa Oklahoma | Flat fee | Title 49, Chapter 4, Section 401 sets residential electrical permit fees for one- and two-family dwellings for new... schedule | 16 Nov 2026 |
| Eugene Oregon | By valuation | From the Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F)... schedule | 16 Aug 2026 |
| Portland Oregon | Per unit | Electrical Permit Fee Schedule for the City of Portland, effective July 10, 2026 schedule | 16 Aug 2026 |
| Philadelphia Pennsylvania | By valuation | $100 $100 filing fee (nonrefundable) schedule | 11 Nov 2026 |
| Pittsburgh Pennsylvania | By valuation | 2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value... schedule | 15 Aug 2026 |
| Providence Rhode Island | By valuation | Trade permit fee by project valuation schedule | 30 Oct 2026 |
| Charleston South Carolina | Flat fee | A $40.00 non-refundable application fee, which the schedule says "is in addition to the Electrical Permit Fee," plus... schedule | 16 Aug 2026 |
| Columbia South Carolina | By valuation | Electrical work at a one or two family dwelling is priced under Code of Ordinances Sec. 5-204(a)(2) alongside... schedule | 16 Nov 2026 |
| Greenville County South Carolina | Per unit | Electrical Permit Fees: minimum fee per permit $72.00 schedule | 23 Oct 2026 |
| Sioux Falls South Dakota | By valuation | 2026 Mechanical, Electrical, or Plumbing Permit Fees (City of Sioux Falls PDF): the fee is set on the MEP valuation... schedule | 30 Oct 2026 |
| Memphis Tennessee | Flat fee | E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00, E-6.2 EXISTING RESIDENTIAL 1&2 FAMILY OCCUPANCIES... schedule | 16 Aug 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Nashville Tennessee | Flat fee | Itemized charges for circuits, panels, services and appliances, with a $75 minimum fee per permit, per Metro Code... schedule | 11 Nov 2026 |
| Williamson County Tennessee | Flat fee | State-issued via the TN CORE system: the issuing agent may charge up to $5.00 for the permit, plus inspection fees... schedule | 11 Nov 2026 |
| Arlington Texas | Not priced | Planning and Development Services Fee Schedule, Effective October 1, 2026, Resolution No. 26 - 288, Building Permit... schedule | 16 Nov 2026 |
| Austin Texas | Flat fee | Electrical Base Fee is $183.69 under the Single Family, Duplex, Townhouse, and Other Residential Structure Fees, per... schedule | 11 Nov 2026 |
| Corpus Christi Texas | Per unit | Electrical trade permits: residential $0.075 per square foot, minimum fee $146.41 (commercial is the greater of the... schedule | 16 Nov 2026 |
| Dallas Texas | Flat fee | The Permit Fee Schedule effective July 1, 2025 has no electrical-specific residential line schedule | 11 Nov 2026 |
| El Paso Texas | By valuation | FY 2027 Schedule C Departmental Fee List, Planning & Inspections, Electrical Permits: base fee $110 (non-refundable)... schedule | 16 Nov 2026 |
| Fort Worth Texas | Flat fee | Billed per item on the electrical fee schedule: services and subpanels 60 amps to 100 amps $19.75, over 100 amps to... schedule | 16 Nov 2026 |
| Houston Texas | Flat fee | Minimum electrical permit fee is $91.06 plus the $33.56 administrative fee, with itemized charges per outlet, fixture... schedule | 11 Nov 2026 |
| Lubbock Texas | Per unit | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September 30, 2026, under Electrical... schedule | 15 Aug 2026 |
| Plano Texas | Per unit | Building Inspections Fee Schedule effective Jan schedule | 15 Aug 2026 |
| San Antonio Texas | Flat fee | For work on an existing home, a $57.50 Electrical Permit Base Fee, then a service rating charge by amperage ($3.74 for... schedule | 11 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Salt Lake City Utah | Per unit | Residential electrical: "Base Fee" $59 schedule | 30 Oct 2026 |
| Burlington Vermont | By valuation | Wiring permits are $8.50 for every $1,000.00 of the estimated cost of the work, with a minimum of $50.00 per permit... schedule | 16 Nov 2026 |
| Arlington County Virginia | By valuation | Fees per FY27 ISD fee schedule schedule | 11 Nov 2026 |
| Chesterfield County Virginia | Flat fee | $171.00 $171.00 for a new single family dwelling schedule | 11 Nov 2026 |
| Fairfax County Virginia | Flat fee | Residential addition or alteration electrical work starts at the $141.75 base fee for Level One (1 to 100 fixtures... schedule | 11 Nov 2026 |
| Fauquier County Virginia | Flat fee | A single-trade electrical permit is $84.15 including the technology fee at the $75 minimum schedule | 11 Nov 2026 |
| Henrico County Virginia | By valuation | Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per... schedule | 11 Nov 2026 |
| Loudoun County Virginia | Flat fee | Base fee for adding, replacing or relocating fixtures, receptacles or circuits in a 1 or 2 family dwelling is $70 schedule | 11 Nov 2026 |
| Orange County Virginia | Per unit | Billed under the residential Trades category at $0.15 per square foot with a $100 minimum, plus Virginia's 2% state... schedule | 11 Nov 2026 |
| Prince William County Virginia | Flat fee | Existing-dwelling electrical work is a base fee of $44.23 ($55.35 with surcharges) plus itemized add-ons: fixtures or... schedule | 11 Nov 2026 |
| Spotsylvania County Virginia | Flat fee | Minimum electrical permit is $100, totaling $147 over the counter after the 2% building surcharge and $45 processing... schedule | 11 Nov 2026 |
| Stafford County Virginia | Flat fee | Residential electrical trade work bills under the All Trades line at $60 per trade per system, plus the 2 percent... schedule | 11 Nov 2026 |
| Locality | Pricing model | What each electrical permit schedule says | Verified |
|---|---|---|---|
| Bellevue Washington | By valuation | Electrical permit fee by valuation per Table 6 of Ordinance 6879, $79 inspection fee minimum for valuation up to $500... schedule | 11 Nov 2026 |
| Clark County Washington | State-issued | No county fee | 11 Nov 2026 |
| King County Washington | Flat fee | Set by state L&I, not King County, under WAC 296-46B-906 (effective 7/1/2026): new single or two family home wiring... schedule | 11 Nov 2026 |
| Pierce County Washington | State-issued | No county fee | 11 Nov 2026 |
| Seattle Washington | Flat fee | Itemized per Fee Subtitle Table D-15: minimum $105.12 for a standard online self-issued permit plus a $55.48... schedule | 11 Nov 2026 |
| Snohomish County Washington | State-issued | No county fee | 11 Nov 2026 |
| Tacoma Washington | By valuation | No Planning and Development Services fee schedule | 11 Nov 2026 |
| Thurston County Washington | By valuation | L&I sets electrical permit fees schedule | 11 Nov 2026 |
| Berkeley County West Virginia | By valuation | No separate electrical permit fee appears on the county fee schedule schedule | 8 Nov 2026 |
| Madison Wisconsin | Per unit | MGO 19.11, Group IV, Alterations And Special Fees (repealed and recreated by ORD-21-00026, 3-26-21): "$25.00 first ten... schedule | 16 Aug 2026 |
| Milwaukee Wisconsin | Flat fee | Electrical permit fees are not reproduced in the Plan Review and Permit Fees schedule schedule | 16 Aug 2026 |
| Cheyenne Wyoming | By valuation | Valuation-based, from the City of Cheyenne Building and Construction Permit Fees table in City Code 15.08.030... schedule | 8 Nov 2026 |
172 rows, every one taken from the jurisdiction's published schedule for electrical permits and linked to its page. Every electrical permit row also sits inside the cross-type study at what building permits cost.
Cite this data
PermitNotebook (2026). Electrical Permit fees and requirements in 172 US localities, verified against published fee schedules. https://permitnotebook.com/permits/electrical/
Electrical Permit rules by state
| State | Localities | Required | Conditional | Not required | Thresholds published |
|---|---|---|---|---|---|
| Florida | 31 | 26 | 5 | 0 | None published |
| California uniform | 15 | 15 | 0 | 0 | None published |
| Virginia | 12 | 6 | 6 | 0 | None published |
| Texas | 11 | 10 | 0 | 0 | None published |
| Arizona | 9 | 6 | 3 | 0 | None published |
| Washington uniform | 8 | 8 | 0 | 0 | None published |
| North Carolina | 6 | 1 | 5 | 0 | None published |
| Maryland | 5 | 3 | 2 | 0 | None published |
| New York | 5 | 2 | 3 | 0 | None published |
| Georgia | 4 | 2 | 2 | 0 | None published |
| Michigan | 4 | 1 | 3 | 0 | None published |
| Ohio | 4 | 2 | 2 | 0 | None published |
| Colorado | 3 | 2 | 1 | 0 | None published |
| Nevada uniform | 3 | 0 | 3 | 0 | None published |
| South Carolina uniform | 3 | 0 | 3 | 0 | None published |
| Tennessee uniform | 3 | 3 | 0 | 0 | None published |
| Delaware uniform | 2 | 2 | 0 | 0 | None published |
| Hawaii | 2 | 1 | 1 | 0 | None published |
| Idaho uniform | 2 | 2 | 0 | 0 | None published |
| Illinois uniform | 2 | 2 | 0 | 0 | None published |
| Indiana uniform | 2 | 0 | 2 | 0 | None published |
| Kansas uniform | 2 | 2 | 0 | 0 | None published |
| Kentucky uniform | 2 | 2 | 0 | 0 | None published |
| Louisiana | 2 | 1 | 1 | 0 | None published |
| Massachusetts uniform | 2 | 2 | 0 | 0 | None published |
| Minnesota uniform | 2 | 2 | 0 | 0 | None published |
| Missouri uniform | 2 | 0 | 2 | 0 | None published |
| Nebraska | 2 | 1 | 1 | 0 | None published |
| New Jersey | 2 | 1 | 1 | 0 | None published |
| New Mexico uniform | 2 | 0 | 2 | 0 | None published |
| Oklahoma uniform | 2 | 0 | 2 | 0 | None published |
| Oregon | 2 | 1 | 1 | 0 | None published |
| Pennsylvania | 2 | 1 | 1 | 0 | None published |
| Wisconsin uniform | 2 | 0 | 2 | 0 | None published |
| Alabama | 1 | 1 | 0 | 0 | None published |
| Alaska | 1 | 0 | 1 | 0 | None published |
| Arkansas | 1 | 1 | 0 | 0 | None published |
| Connecticut | 1 | 1 | 0 | 0 | None published |
| Iowa | 1 | 1 | 0 | 0 | None published |
| Maine | 1 | 1 | 0 | 0 | None published |
| Mississippi | 1 | 1 | 0 | 0 | None published |
| Montana | 1 | 1 | 0 | 0 | None published |
| New Hampshire | 1 | 1 | 0 | 0 | None published |
| North Dakota | 1 | 1 | 0 | 0 | None published |
| Rhode Island | 1 | 0 | 1 | 0 | None published |
| South Dakota | 1 | 0 | 1 | 0 | 5 outlets, switches, receptacles or fixtures |
| Utah | 1 | 1 | 0 | 0 | None published |
| Vermont | 1 | 0 | 1 | 0 | $1,000 |
| West Virginia | 1 | 1 | 0 | 0 | None published |
| Wyoming | 1 | 1 | 0 | 0 | None published |
A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.
How electrical permits work, start to finish
Applying
In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
Inspections and close-out
Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
This is common practice under the model codes, not any one office's procedure. Some places build under their own code instead, such as New York City's Construction Codes and Wisconsin's Uniform Dwelling Code. Each locality page carries that office's own permit page, fees and portal. Sources: International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted), International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions.
Common questions about electrical permits
- Do I need a permit to replace an outlet or a light switch?
- Often not, if it is a same-for-same swap in the existing box. 45 of the 58 offices we read with a separate electrical exemption list name outlets, receptacles or switches on it, and many offices without one still allow the swap in their own rules, Phoenix among them, while Virginia exempts it statewide. Read your own office's wording, because the conditions differ. Kansas City, Missouri, for example, exempts replacement of "snap switches, receptacles and fixtures (other than ceiling fans) where no alteration or extension of an existing circuit is required."
- Do I need a permit to add an outlet or a new circuit?
- Almost always. A new outlet, a new circuit or an extended circuit is new wiring, and nearly every electrical exemption we have read covers only repairs and same-for-same replacements; Sioux Falls, South Dakota, is the rare exception, letting a few outlets or one small circuit go without a permit. Overland Park, Kansas, puts it plainly: a permit is required for "new or extended branch circuits, adding fixtures or receptacles to an existing circuit or adding or upgrading an electrical service."
- Do I need a permit to install a ceiling fan?
- Usually, unless it hangs on a box already rated and wired for a fan and your office exempts fixture swaps. Kansas City excludes ceiling fans from its fixture exemption by name, and Tucson, Arizona, requires a permit for "new wired lighting, ceiling fans, or electrical outlets".
- Can a homeowner pull their own electrical permit?
- In many places, for their own home and only for work they do themselves. 53 of the 177 electrical rules we read mention owners or homeowners, usually to say who may pull the permit. State licensing law decides it, so the answer differs by state; see our guide to whether a homeowner can pull an electrical permit.
Find the electrical permit rule where you live
Look up your locality
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning more than an electrical permit? Check your whole project