Maryland / Prince George's County

Electrical Permit in Prince George's County, Maryland

Permit required

Yes, a permit is required

Before replacing or extending wiring, relocating switches, outlets, fixtures or sub-panels, changing the service size or relocating service entrance cable, replacing circuit breakers, or hard-wiring smoke detectors.

Confirmed on official page Verified Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)

By Mario Bailey, verified against official sources

Quick answer

Electrical work on an existing Prince George's County dwelling requires an Electrical Permit, and the application must come from a Master Electrician licensed by the State of Maryland, so a homeowner cannot pull this permit themselves. DPIE's published exemption is limited to repairs and maintenance, specifically minor repair work including replacing lamps or connecting approved portable electrical equipment to approved permanently installed receptacles, which does not cover any actual wiring work. Master Electricians must register with DPIE and file through Momentum, and electrical revisions can only be processed by speaking with DPIE staff on 301-636-2050, option 2. The county enforces the 2020 NFPA 70 National Electrical Code together with Subtitle 9, the Prince George's County Electrical Code.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before replacing or extending wiring, relocating switches, outlets, fixtures or sub-panels, changing the service size or relocating service entrance cable, replacing circuit breakers, or hard-wiring smoke detectors.

What an electrical permit costs in Prince George's County

Line item
electrical permitBy formulaDPIE Fee Schedule, effective March 2, 2025, prices electrical work by item: "Electrical Permit Fee - Rough Wire Outlet, Segment of 15" $50; "Electrical Permit Fee - Service Equipment/Heavy Up (Up to 300 Amps)" $90; "Electrical Permit Fee - Service Equipment/Heavy Up (Over 300 Amps)" $162; "Electrical Permit Fee - Light Fixture, Exclude Light Pole (Segment of 15)" $50; "Electrical Permit Fee - Electric Vehicle Charging Per New Outlet" $110 per outlet; "Electrical Permit Fee - Swimming Pool" $162. Each is stated as "Total Fee = Administrative Fee $66 + Electrical Permit Fee $X. Plus Technology Fee 10%.".
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Prince George's County compares in Maryland

No Maryland jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Baltimore CountyIt dependsElectrical Permit Fee Schedule effective 11/26/18: Residential Service (each...
Howard CountyPermit required$50 non-refundable permit application fee, plus $50 for 25 or fewer...
Montgomery CountyPermit required$111.94 minimum fee for a residential one or two family dwelling electrical...
Prince George's Countythis pagePermit requiredDPIE Fee Schedule, effective March 2, 2025, prices electrical work by item:...

How to apply in Prince George's County

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) sets the exact checklist for Prince George's County.

Where to apply in Prince George's County:

Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Prince George's County permit portal or by phone at 301-636-2000.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in Prince George's County?
Electrical work on an existing Prince George's County dwelling requires an Electrical Permit, and the application must come from a Master Electrician licensed by the State of Maryland, so a homeowner cannot pull this permit themselves. DPIE's published exemption is limited to repairs and maintenance, specifically minor repair work including replacing lamps or connecting approved portable electrical equipment to approved permanently installed receptacles, which does not cover any actual wiring work. Master Electricians must register with DPIE and file through Momentum, and electrical revisions can only be processed by speaking with DPIE staff on 301-636-2050, option 2. The county enforces the 2020 NFPA 70 National Electrical Code together with Subtitle 9, the Prince George's County Electrical Code. Always confirm with the Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) before starting.
How much does an electrical permit cost in Prince George's County?
DPIE Fee Schedule, effective March 2, 2025, prices electrical work by item: "Electrical Permit Fee - Rough Wire Outlet, Segment of 15" $50; "Electrical Permit Fee - Service Equipment/Heavy Up (Up to 300 Amps)" $90; "Electrical Permit Fee - Service Equipment/Heavy Up (Over 300 Amps)" $162; "Electrical Permit Fee - Light Fixture, Exclude Light Pole (Segment of 15)" $50; "Electrical Permit Fee - Electric Vehicle Charging Per New Outlet" $110 per outlet; "Electrical Permit Fee - Swimming Pool" $162. Each is stated as "Total Fee = Administrative Fee $66 + Electrical Permit Fee $X. Plus Technology Fee 10%.". See the official fee schedule for current amounts.
Where do you apply for an electrical permit in Prince George's County?
You can apply through the Prince George's County permit portal or contact the Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Prince George's County?
Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Prince George's County applies this before you apply.

From the Library

What else needs a permit in Prince George's County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedDPIE Fee Schedule, effective March 2, 2025, line item "Deck or Pergola", minimum permit...
Fence PermitIt dependsfence height above grade, with a permit required at any height on a corner lot, in a historic or protected area, or in the 100-year floodplainDPIE Fee Schedule, effective March 2, 2025, line item "Fence - Residential", minimum...
HVAC PermitIt dependsNot specifiedDPIE Fee Schedule, effective March 2, 2025, line item "Mechanical Permit -...
Patio PermitIt dependsarea of an at-grade patio, with a permit required at any size if stairs or ramps are built due to elevation changeDPIE Fee Schedule, effective March 2, 2025, line item "Patio - Residential > 500 Sq Ft"...
Plumbing PermitIt dependsNot specifiedThe DPIE Fee Schedule effective March 2, 2025 carries no residential plumbing permit...
Pool PermitIt dependsprefabricated pools accessory to one- and two-family dwellings that are installed entirely above ground, hold no more than 5,000 gallons, and have a four-foot fence around the pool perimeterDPIE Fee Schedule, effective March 2, 2025: "Swimming Pool (In-ground) - Residential"...
Roof Replacement PermitIt dependsNot specifiedDPIE Fee Schedule, effective March 2, 2025, routes the line item "Roofing - Shingles &...
Shed PermitIt dependsfloor space of a one-story detached accessory structure, and only one such exempt structure is allowed per propertyDPIE Fee Schedule, effective March 2, 2025, line item "Shed > 150 Sq Ft", $1.17 per SF:...
Solar PermitPermit requiredNot specifiedDPIE Fee Schedule, effective March 2, 2025: "Solar Panels (Roof-mounted) - Residential"...

Electrical Permit in other Maryland localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Prince George's County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Electrical Permit requirements across Maryland localities

Permit required
Get quotes