Maryland / Prince George's County
Electrical Permit in Prince George's County, Maryland
Permit required
Yes, a permit is required
Before replacing or extending wiring, relocating switches, outlets, fixtures or sub-panels, changing the service size or relocating service entrance cable, replacing circuit breakers, or hard-wiring smoke detectors.
Quick answer
Electrical work on an existing Prince George's County dwelling requires an Electrical Permit, and the application must come from a Master Electrician licensed by the State of Maryland, so a homeowner cannot pull this permit themselves. DPIE's published exemption is limited to repairs and maintenance, specifically minor repair work including replacing lamps or connecting approved portable electrical equipment to approved permanently installed receptacles, which does not cover any actual wiring work. Master Electricians must register with DPIE and file through Momentum, and electrical revisions can only be processed by speaking with DPIE staff on 301-636-2050, option 2. The county enforces the 2020 NFPA 70 National Electrical Code together with Subtitle 9, the Prince George's County Electrical Code.
- Issued by
- Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
- Phone
- 301-636-2000
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Prince George's County
- Fee schedule in force
- Official scheduleRead .
- DPIE Fee Schedule, effective October 16, 2026, prices electrical work by item, each stated as "Total Fee = Administrative Fee $66 + Electrical Permit Fee" plus "Technology Fee 10%": "Electrical Permit Fee - Appliance" $50;
- "Electrical Permit Fee - Service Equipment/Heavy Up (Up to 300 Amps)" $90;
- "Electrical Permit Fee - Service Equipment/Heavy Up (Over 300 Amps)" $162.
- Rough wire outlets, light fixtures, electric vehicle charging outlets and swimming pools each have their own line.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Prince George's County compares in Maryland
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Anne Arundel County | It depends | Before installing, altering or replacing wiring, circuits, fixtures, panels or services |
| Baltimore County | It depends | Before any electrical work, including extending circuit wiring, low voltage wiring, and... |
| Howard County | Permit required | Any size |
| Montgomery County | Permit required | DPS lists repairing or replacing electrical plug receptacles in the same location among items that most likely need no permit. |
| Prince George's Countythis page | Permit required | Any size |
How to apply in Prince George's County
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
- 9400 Peppercorn Place, Largo, MD 20774
- Phone: 301-636-2000
- Email: dpiebprd@co.pg.md.us
Your Electrical Permit checklist for Prince George's County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: princegeorgescountymd.gov: permitting inspections and enforcement.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Prince George's County permit portal.
- Keep the office details handy. Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Phone: 301-636-2000. Email: dpiebprd@co.pg.md.us. Address: 9400 Peppercorn Place, Largo, MD 20774.
Compiled from the official sources on this page. Last checked .
Permitting activity in Prince George's County
In 2025, Prince George's County authorized permits for 2,090 new residential housing units (1,530 single-family, 560 in multi-family buildings), valued at $616M, up from 1,473 the year before. That works out to about 2.2 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 970,374.
What else needs a permit in Prince George's County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fence height above grade, with a permit required at any height on a corner lot, in a historic or protected area, or in the 100-year floodplain | See schedule |
| HVAC Permit | It depends | Before installing or replacing a furnace, boiler, heat pump, central air conditioner... | See schedule |
| Patio Permit | It depends | area of an at-grade patio, with a permit required at any size if stairs or ramps are built due to elevation change | See schedule |
| Plumbing Permit | It depends | Before installing new plumbing or natural gas piping, before replacing a water heater... | See schedule |
| Pool Permit | It depends | prefabricated pools accessory to one- and two-family dwellings that are installed entirely above ground, hold no more than 5,000 gallons, and have a four-foot fence around the pool perimeter | DPIE Fee Schedule, effective October 16, 2026: "Swimming Pool (In-ground) - Residential", minimum permit fee $297; the schedule has the rest |
| Roof Replacement Permit | It depends | Before replacing roof sheathing or plywood, or doing any roof work that involves... | See schedule |
| Shed Permit | It depends | floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property | See schedule |
| Solar Permit | Permit required | Any size | DPIE Fee Schedule, effective October 16, 2026: "Solar Panels (Roof-mounted) - Residential", minimum permit fee $158; the schedule has the rest |
Frequently asked questions
- Do you need an electrical permit in Prince George's County?
- Yes, before replacing or extending wiring, relocating switches, outlets, fixtures or sub-panels, changing the service size or relocating service entrance cable, replacing circuit breakers, or hard-wiring smoke detectors. If you are unsure how that applies to your project, call the permit office at 301-636-2000 before you start.
- How much does an electrical permit cost in Prince George's County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at 301-636-2000.
- Where do you apply for an electrical permit in Prince George's County?
- You can apply through the Prince George's County permit portal or contact the Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Prince George's County?
- Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Prince George's County applies this before you apply.
From the Library
Electrical Permit in other Maryland localities
Everything above, sourced
How this electrical permit page for Prince George's County was verified. 2 official sources: princegeorgescountymd.gov, princegeorgescountymd.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page