Do you need a bathroom remodel permit?
By Mario Bailey Last checked
It depends entirely on where you live, and the differences are larger than most national guides admit. We read the code, ordinance, or fee schedule published by each of 27 US counties and cities and recorded what it actually says.
Where are you building?
The rule is set locally and the spread is wide, so start with your own jurisdiction. We have read the published rule in 27 of them.
The short answer
Of the 27 jurisdictions where we have confirmed the rule, 0 require a permit outright, 27 require one only in certain conditions.
What a bathroom remodel permit costs
25 of our bathroom remodel permit rows carry a fee answer taken from the jurisdiction's own published schedule, across 25 localities. There is no single number to quote, and not because we did not look: jurisdictions price this permit in genuinely different ways. Some charge a flat fee, some a percentage of the job's assessed valuation, some a rate per square foot, and some do not price it at all because the work is permitted by a state agency or a utility instead. Each row below is that jurisdiction's own wording.
| Locality | Pricing model | What each bathroom remodel permit schedule says | Verified |
|---|---|---|---|
| New Castle County Delaware | By valuation | Building permit fees per the Deck and Swimming Pool requirement sheets (rev schedule | 3 Oct 2026 |
| Sussex County Delaware | Per unit | Sussex County Building Permit Fee Guide: construction value (table rates such as $128.10/sq ft residential, $52.23/sq... schedule | 3 Oct 2026 |
| Hawaii County Hawaii | By valuation | Hawaiʻi County Code section 5-7-3(b), "PERMIT FEES" table (Chapter 5 Construction Administrative Code, 2020, ord... schedule | 3 Oct 2026 |
| Honolulu Hawaii | By valuation | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials, plus a plan review fee of 20%... schedule | 3 Oct 2026 |
| Boise Idaho | Per unit | Plumbing: $33.00 base fee plus $12.50 per fixture (FY27 Plumbing Code Fee Schedule) schedule | 3 Oct 2026 |
| Chicago Illinois | Flat fee | Nonstructural interior remodel up to 500 sq ft with no occupancy or load-bearing change is a flat $250 stand-alone fee... schedule | 12 Jul 2026 |
| Overland Park Kansas | By valuation | Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less... schedule | 3 Oct 2026 |
| Lexington Kentucky | Flat fee | LFUCG Division of Building Inspection Schedule of Fees, EFFECTIVE JULY 1, 2019 (document revised 10/27/21) schedule | 3 Oct 2026 |
| Louisville Kentucky | By valuation | Metro building permit for a partial alteration: $50 plus $2.50 per $1,000 of estimated cost, minimum $75 (LMCO... schedule | 3 Oct 2026 |
| Howard County Maryland | Flat fee | Interior alterations to a single family home need a $25 filing fee plus $50 for an area of 200 sq ft or less or $100... schedule | 12 Jul 2026 |
| Montgomery County Maryland | Per unit | Filed as a residential Alteration Building Permit at $0.78 per sq ft of altered area with a filing fee of 50% of the... schedule | 12 Jul 2026 |
| Boston Massachusetts | By valuation | Non-structural bathroom work uses the Short-Form building permit at $20 primary plus $10 per $1,000 of estimated cost schedule | 12 Jul 2026 |
| Lincoln Nebraska | Per unit | Plumbing Fees page: $8 per fixture (Water Closet or Urinal, Lavatory, Bathtub, Shower) | 3 Oct 2026 |
| Omaha Nebraska | Per unit | Building permit fees are based on job value (Omaha Municipal Code Sec. 43-91 schedule | 3 Oct 2026 |
| Jersey City New Jersey | By valuation | Building subcode charges $15 per $1,000 of estimated renovation cost with a $50 minimum short-permit fee or $100... | 12 Jul 2026 |
| Philadelphia Pennsylvania | Flat fee | Billed as a plumbing alteration permit at $50 for the first 7 fixtures plus $22.50 per additional fixture schedule | 12 Jul 2026 |
| Chesterfield County Virginia | Flat fee | Falls under renovation, alteration or conversion: $114 if square footage does not change, $171 with a change of use or... schedule | 12 Jul 2026 |
| Fairfax County Virginia | Flat fee | No single line item schedule | 12 Jul 2026 |
| Fauquier County Virginia | Per unit | Billed as a residential alteration at $0.16 per square foot with a $100 minimum plus the schedule's 10% technology... schedule | 12 Jul 2026 |
| Henrico County Virginia | By valuation | Falls under the existing-dwelling building permit formula of $100 for the first $5,000 of labor and material cost plus... schedule | 12 Jul 2026 |
| Loudoun County Virginia | By valuation | Billed as a residential alteration: building permit fee is 1% of construction cost plus a $130 plan review fee, with... schedule | 12 Jul 2026 |
| Orange County Virginia | Per unit | Bills as the residential Alteration category at $0.25 per square foot with a $150 minimum, plus separate Trades... schedule | 12 Jul 2026 |
| Prince William County Virginia | Per unit | No dedicated line item schedule | 12 Jul 2026 |
| Spotsylvania County Virginia | Per unit | Interior renovation building fee runs $0.34 per square foot with a $180 minimum, plus a 2% surcharge and $65... schedule | 12 Jul 2026 |
| Stafford County Virginia | Per unit | Billed as a residential alteration at $0.10 per sq ft ($75 minimum) plan review and $0.10 per sq ft ($50 minimum)... schedule | 12 Jul 2026 |
25 rows, every one taken from the jurisdiction's published schedule for bathroom remodel permits and linked to its page. Every bathroom remodel permit row also sits inside the cross-type study at what building permits cost.
Cite this data
PermitNotebook (2026). Bathroom Remodel Permit fees and requirements in 25 US localities, verified against published fee schedules. https://permitnotebook.com/permits/bathroom-remodel/
Bathroom Remodel Permit rules by state
12 states, 27 counties and cities. Pick your state for the locality-by-locality comparison, or go straight to your county.
| State | Localities | Required | Conditional | Not required | Thresholds published |
|---|---|---|---|---|---|
| Virginia uniform | 10 | 0 | 10 | 0 | None published |
| Delaware uniform | 2 | 0 | 2 | 0 | None published |
| Hawaii uniform | 2 | 0 | 2 | 0 | None published |
| Kansas uniform | 2 | 0 | 2 | 0 | None published |
| Kentucky uniform | 2 | 0 | 2 | 0 | None published |
| Maryland uniform | 2 | 0 | 2 | 0 | None published |
| Nebraska uniform | 2 | 0 | 2 | 0 | None published |
| Idaho | 1 | 0 | 1 | 0 | None published |
| Illinois | 1 | 0 | 1 | 0 | None published |
| Massachusetts | 1 | 0 | 1 | 0 | None published |
| New Jersey | 1 | 0 | 1 | 0 | None published |
| Pennsylvania | 1 | 0 | 1 | 0 | None published |
A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.
How bathroom remodel permits work, start to finish
Applying
A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.
- Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
- The permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
- Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
- A bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
- New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
- Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
- Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).
Inspections and close-out
Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
- Any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
- The plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
- Work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
- Scheduling is on the permit holder: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
- A final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).
General practice; your locality's page carries its own process, fees, and portal. Sources: International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902, International Residential Code (IRC), 2021 edition, Section R109 (Inspections).
Common questions about bathroom remodel permits
- Do I need a bathroom remodel permit?
- For bathroom remodel work it depends on the size of the job and where you are. A bathroom remodel permit is issued by your city or county rather than the state, so the rule is local. Across the 27 jurisdictions where we have read the bathroom remodel rule, 0 require a permit outright, 27 require one only in certain conditions.
- Is there a bathroom remodel permit exemption?
- In 27 of the 27 jurisdictions we cover, a bathroom remodel permit is not needed below a published threshold, and that threshold differs from one office to the next. The size thresholds section above lists each jurisdiction's own bathroom remodel figure with its source, and the same bathroom remodel job can be exempt in one county and permitted in the next.
Find the bathroom remodel permit rule where you live
Look up your locality
Hire it out
Sponsored
Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.
Compare bathroom remodel quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning more than a bathroom remodel permit? Check your whole project