Do you need a bathroom remodel permit?
New tile, a vanity and paint, usually no; moving pipes, wiring or walls, yes
A cosmetic refresh, meaning paint, tile, flooring, a new vanity or countertop, and a toilet or sink swapped in the same spot, usually needs no permit. The moment the remodel moves a fixture, adds or changes wiring, opens a wall to the framing or adds a vented fan, it does, and often more than one.
We have read the bathroom rule of 53 offices so far. 50 draw the line between finish work and system work, and 49 of those name finish items such as paint, tile or cabinets as exempt; 3 require a permit for any bathroom remodel.
Where are you working?
Find your office's line between finish work and remodeling:
What counts as finish work
The finish-work list most offices use reads, in Sioux Falls, South Dakota’s adopted residential code, “Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work” (Sioux Falls, its adopted code). Boise says the same in plain words:
“The building code exempts interior work such as painting, floor covering, cabinets, counter tops and wall coverings from permit requirements.”
Pipes, wires and walls
The same Boise sentence goes on to name the three things that end the exemption: a permit is required if the project “removes wall coverings to expose the framing; builds a wall or partition (whether bearing or non-bearing) or relocates sinks, tubs, showers or water closets which require plumbing.” Las Vegas gives a rule of thumb that works for most offices:
“If you affect the ‘envelope’ of the structure or plainly, if you open up the interior or exterior walls of the structure; 3. For other than routine maintenance and service, if you work on or add to the building’s mechanical, electrical, or plumbing systems.”
Las Vegas, Nevada (its “When do I need a permit” sheet)
A new exhaust fan is the item people forget: it needs a vent run and usually wiring, and 13 of the bathroom rules we read mention exhaust fans or ventilation.
One room, several permits
A full remodel is usually a building permit plus separate plumbing and electrical permits, each with its own inspection, and in many places a licensed plumber or electrician pulls the trade permit. Plan the order: rough plumbing and wiring are inspected with the walls open, before the drywall and tile go up. The national trade pages cover each permit on its own: plumbing and electrical. For costs and the full checklist, see our bathroom remodel permit guide.
Every published line, office by office
Measured in USD (3 jurisdictions)
| Threshold | Jurisdictions | Where |
|---|---|---|
| $1,000 | 1 | Burlington |
| $40,000 | 2 | Durham, Raleigh |
Thresholds are recorded as the jurisdiction states them. Which side of the number triggers the permit varies, so read your own locality's page before relying on one.
What a bathroom remodel permit costs
| Locality | Pricing model | What each bathroom remodel permit schedule says | Verified |
|---|---|---|---|
| Birmingham Alabama | By valuation | Technical Code of the City of Birmingham, 2024 (effective 10/1/2024), Article V: "Building permit fees shall be... schedule | 30 Oct 2026 |
| Anchorage Alaska | By valuation | Trade-only remodels: AMC 23.10.109 Table 3-A item 3.A, "Trade Permits (Plumbing, mechanical, or electrical work but no... schedule | 30 Oct 2026 |
| Tucson Arizona | By valuation | Fixture and piping work is a "4-02.9.1 Trade Permits" item at $150.00 (listed item "H. Plumbing Fixture... schedule | 23 Oct 2026 |
| Little Rock Arkansas | By valuation | Building permit (if required) on the valuation schedule with a $51.50 minimum schedule | 30 Oct 2026 |
| San Francisco California | By valuation | Valuation-based under Table 1A-A Building Permit Fees (July 2026) with separate electrical (Table 1A-E) and plumbing... schedule | 30 Oct 2026 |
| Stamford Connecticut | Per unit | Building permit at $13.00 per $1,000 of construction value (minimum $60.00), with construction value figured at a... schedule | 8 Nov 2026 |
| New Castle County Delaware | By valuation | Building permit fees per the Deck Permit Requirements, Swimming Pool & Hot Tub/Spa and Residential Addition and... schedule | 17 Nov 2026 |
| Sussex County Delaware | Per unit | Sussex County Building Permit Fee Guide: construction value (table rates such as $128.10/sq ft residential, $52.23/sq... schedule | 16 Nov 2026 |
| Martin County Florida | By valuation | Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee... schedule | 23 Oct 2026 |
| Miami Florida | By valuation | Residential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost schedule | 30 Oct 2026 |
| Tampa Florida | By valuation | Fixture-only work: "Plumbing (general)" $120.00, City of Tampa Trade Permit Fee Schedule ("Effective October 1, 2018"... schedule | 30 Oct 2026 |
| Hawaii County Hawaii | By valuation | Hawaiʻi County Code section 5-7-3(b), "PERMIT FEES" table (Chapter 5 Construction Administrative Code, 2020, ord... schedule | 16 Nov 2026 |
| Honolulu Hawaii | By valuation | No per-item schedule is published for this project schedule | 17 Nov 2026 |
| Boise Idaho | Per unit | Plumbing: $33.00 base fee plus $12.50 per fixture (FY27 Plumbing Code Fee Schedule) schedule | 3 Oct 2026 |
| Locality | Pricing model | What each bathroom remodel permit schedule says | Verified |
|---|---|---|---|
| Meridian Idaho | Per unit | Plumbing (R-PLMEX) per the plumbing lines: $30 permit fee plus $8 per fixture schedule | 23 Oct 2026 |
| Chicago Illinois | Flat fee | Table 14A-12-1204.2 Stand-Alone Permit Fees effective January 1, 2027 (issued September 28, 2026): "Interior... schedule | 2 Nov 2026 |
| Des Moines Iowa | Flat fee | "Renovations to dwellings: $154.50" for the building permit, plus $77.25 each for residential electrical, mechanical... schedule | 23 Oct 2026 |
| Overland Park Kansas | By valuation | Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less... schedule | 3 Oct 2026 |
| Lexington Kentucky | Flat fee | LFUCG Division of Building Inspection Schedule of Fees, EFFECTIVE JULY 1, 2019 (document revised 10/27/21) schedule | 3 Oct 2026 |
| Louisville Kentucky | By valuation | Louisville Metro Construction Review's Permit Fees page (LMCO 150.096): partial alterations and work on structures... schedule | 16 Nov 2026 |
| Portland Maine | By valuation | Building Permits and Inspections Fee Schedule (Revised 7/2026), General Building Permit Fees: "Up to $1,000 worth of... schedule | 8 Nov 2026 |
| Anne Arundel County Maryland | By valuation | Trade permits as scoped: plumbing "First plumbing fixture | $51.00", "Each additional plumbing fixture | $8.00" schedule | 30 Oct 2026 |
| Howard County Maryland | Flat fee | Alterations & Repairs to Attached and Detached Single Family Dwellings: Filing Fee (non-refundable) $25, plus $50 for... schedule | 11 Nov 2026 |
| Montgomery County Maryland | By valuation | Residential Alteration and repairs fee $0.783545 per SF, plus a Filing Fee for Add, Alter, Repair of 50% of the permit... schedule | 2 Nov 2026 |
| Boston Massachusetts | By valuation | Short-Form Permit: "$20, plus $10 per $1,000 of estimated cost" schedule | 2 Nov 2026 |
| Jackson Mississippi | By valuation | Jackson does not publish a current permit fee schedule online | 8 Nov 2026 |
| Billings Montana | By valuation | Building permit fees are set by valuation (Permit Fees by Valuation schedule, PDF dated April 23, 2026): $30.00 for $1... schedule | 8 Nov 2026 |
| Locality | Pricing model | What each bathroom remodel permit schedule says | Verified |
|---|---|---|---|
| Lincoln Nebraska | Per unit | Plumbing Fees page: $8 per fixture (Water Closet or Urinal, Lavatory, Bathtub, Shower) | 3 Oct 2026 |
| Omaha Nebraska | Flat fee | Building permit fees are based on the total value of all construction work for which the permit is issued (Omaha... schedule | 16 Nov 2026 |
| Las Vegas Nevada | Flat fee | Table 3-A FEE SCHEDULE - NEW CONSTRUCTION: "Single-Family Resid schedule | 30 Oct 2026 |
| Manchester New Hampshire | By valuation | Plumbing: calculated cost of the work multiplied by 0.015 schedule | 8 Nov 2026 |
| Albuquerque New Mexico | By valuation | Building permit (if structural or layout work) by valuation under "TABLE 112-A BUILDING PERMIT FEES" with the (.50)... schedule | 23 Oct 2026 |
| Bernalillo County New Mexico | By valuation | Building work is valuation-based under Resolution 25-2009 Table 3-A ("$30.00 plus $4.00 per $1,000.00 Valuation" plus... schedule | 23 Oct 2026 |
| Durham North Carolina | Flat fee | Plumbing Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule E "Fixture Replacement schedule | 23 Oct 2026 |
| Raleigh North Carolina | By valuation | FY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027), Permit Fees for Alterations... schedule | 23 Oct 2026 |
| Fargo North Dakota | By valuation | Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to... schedule | 16 Nov 2026 |
| Philadelphia Pennsylvania | By valuation | In a one-family dwelling, filed as an EZ Bathroom and Kitchen Remodel plumbing permit with no separate building permit schedule | 2 Nov 2026 |
| Providence Rhode Island | By valuation | Building permit fee by project valuation, from the City of Providence schedule in the state fee rule... schedule | 30 Oct 2026 |
| Greenville County South Carolina | By valuation | Priced as an alteration on the valuation table at actual project cost (the schedule's note reads "*** Renovations... schedule | 23 Oct 2026 |
| Sioux Falls South Dakota | By valuation | 2026 Building Permit Valuation/Fee Schedule (City of Sioux Falls, fee schedule dated 01/01/2026), "Residential... schedule | 30 Oct 2026 |
| Locality | Pricing model | What each bathroom remodel permit schedule says | Verified |
|---|---|---|---|
| Salt Lake City Utah | Per unit | Building permit if walls or layout change (building permit fee from the valuation table in the Salt Lake City... schedule | 30 Oct 2026 |
| Burlington Vermont | By valuation | Building permit: Burlington Code of Ordinances (BCO) Sec. 8-28(a), "$8.50 per $1,000.00" of Estimated Cost of... schedule | 16 Nov 2026 |
| Chesterfield County Virginia | Flat fee | Renovation, alteration, or conversion resulting in no change to square footage $114.00 ($171.00 with a change of use... schedule | 2 Nov 2026 |
| Fairfax County Virginia | Flat fee | No single line item for a bathroom remodel schedule | 11 Nov 2026 |
| Fauquier County Virginia | Flat fee | Trade permits: "A permit for a single trade is $84.15 including technology fee schedule | 16 Nov 2026 |
| Henrico County Virginia | By valuation | No bathroom-specific fee schedule | 2 Nov 2026 |
| Loudoun County Virginia | By valuation | Billed as a residential alteration: building permit fee is 1% of construction cost plus a $130 plan review fee, with... schedule | 11 Nov 2026 |
| Orange County Virginia | Per unit | Bills as the residential Alteration line at $0.25 per square foot (min. $150), with any plumbing or electrical work... schedule | 2 Nov 2026 |
| Prince William County Virginia | Flat fee | Building, "D. REPAIRS AND ALTERATIONS 1 schedule | 2 Nov 2026 |
| Spotsylvania County Virginia | Per unit | Interior renovation building fee runs $0.34 per square foot with a $180 minimum, plus a 2% surcharge and $65... schedule | 11 Nov 2026 |
| Stafford County Virginia | Per unit | Billed as a residential alteration at $0.10 per sq ft ($75 minimum) plan review and $0.10 per sq ft ($50 minimum)... schedule | 11 Nov 2026 |
| Berkeley County West Virginia | Flat fee | Residential: "Interior Renovations/Remodeling" $59.00 plus .14 sq ft. Berkeley County Building Permit/Inspection Fees... schedule | 8 Nov 2026 |
| Cheyenne Wyoming | By valuation | Valuation-based, from the City of Cheyenne Building and Construction Permit Fees table in City Code 15.08.030... schedule | 8 Nov 2026 |
53 rows, every one taken from the jurisdiction's published schedule for bathroom remodel permits and linked to its page. Every bathroom remodel permit row also sits inside the cross-type study at what building permits cost.
Cite this data
PermitNotebook (2026). Bathroom Remodel Permit fees and requirements in 53 US localities, verified against published fee schedules. https://permitnotebook.com/permits/bathroom-remodel/
Bathroom Remodel Permit rules by state
| State | Localities | Required | Conditional | Not required | Thresholds published |
|---|---|---|---|---|---|
| Virginia uniform | 10 | 0 | 10 | 0 | None published |
| Florida uniform | 3 | 0 | 3 | 0 | None published |
| Maryland uniform | 3 | 0 | 3 | 0 | None published |
| Delaware uniform | 2 | 0 | 2 | 0 | None published |
| Hawaii uniform | 2 | 0 | 2 | 0 | None published |
| Idaho uniform | 2 | 0 | 2 | 0 | None published |
| Kansas uniform | 2 | 0 | 2 | 0 | None published |
| Kentucky uniform | 2 | 0 | 2 | 0 | None published |
| Nebraska uniform | 2 | 0 | 2 | 0 | None published |
| New Mexico uniform | 2 | 0 | 2 | 0 | None published |
| North Carolina uniform | 2 | 0 | 2 | 0 | $40,000 |
| Alabama | 1 | 0 | 1 | 0 | None published |
| Alaska | 1 | 0 | 1 | 0 | None published |
| Arizona | 1 | 0 | 1 | 0 | None published |
| Arkansas | 1 | 0 | 1 | 0 | None published |
| California | 1 | 1 | 0 | 0 | None published |
| Connecticut | 1 | 0 | 1 | 0 | None published |
| Illinois | 1 | 0 | 1 | 0 | None published |
| Iowa | 1 | 0 | 1 | 0 | None published |
| Maine | 1 | 0 | 1 | 0 | None published |
| Massachusetts | 1 | 1 | 0 | 0 | None published |
| Mississippi | 1 | 0 | 1 | 0 | None published |
| Montana | 1 | 0 | 1 | 0 | None published |
| Nevada | 1 | 0 | 1 | 0 | None published |
| New Hampshire | 1 | 0 | 1 | 0 | None published |
| New Jersey | 1 | 0 | 1 | 0 | None published |
| North Dakota | 1 | 0 | 1 | 0 | None published |
| Pennsylvania | 1 | 0 | 1 | 0 | None published |
| Rhode Island | 1 | 0 | 1 | 0 | None published |
| South Carolina | 1 | 0 | 1 | 0 | None published |
| South Dakota | 1 | 0 | 1 | 0 | None published |
| Texas | 1 | 0 | 0 | 0 | None published |
| Utah | 1 | 0 | 1 | 0 | None published |
| Vermont | 1 | 0 | 1 | 0 | $1,000 |
| West Virginia | 1 | 1 | 0 | 0 | None published |
| Wyoming | 1 | 0 | 1 | 0 | None published |
A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.
How bathroom remodel permits work, start to finish
Applying
A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.
- Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
- The permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
- Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
- A bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
- New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
- Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
- Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).
Inspections and close-out
Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
- Any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
- The plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
- Work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
- Scheduling is on the permit holder: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
- A final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).
This is common practice under the model codes, not any one office's procedure. Some places build under their own code instead, such as New York City's Construction Codes and Wisconsin's Uniform Dwelling Code. Each locality page carries that office's own permit page, fees and portal. Sources: International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902, International Residential Code (IRC), 2021 edition, Section R109 (Inspections).
Common questions about bathroom remodel permits
- Do I need a permit to remodel a bathroom?
- For finish work alone, usually not; for anything that touches pipes, wiring or walls, yes. 50 of the 53 offices we read draw that line, and 3 permit any bathroom remodel. Boise, Idaho, requires a permit if the project "removes wall coverings to expose the framing; builds a wall or partition (whether bearing or non-bearing) or relocates sinks, tubs, showers or water closets which require plumbing."
- Do I need a permit to replace a toilet or vanity?
- Usually not, if it goes back in the same place on the same pipes. Jersey City treats "Replacement of fixtures with a similar fixture provided that no change in the piping arrangement is made" as ordinary maintenance with no permit (its ordinary maintenance page).
- Do I need a permit to retile a shower?
- Tile itself is finish work that most offices exempt. Tearing the shower out to the studs is different: exposing the framing, rebuilding the pan or moving the valve brings it into permit territory in offices such as Boise.
Find the bathroom remodel permit rule where you live
Look up your locality
Hire it out
Sponsored
Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.