Maryland / Howard County

Bathroom Remodel Permit in Howard County, Maryland

It depends

Sometimes, depending on the project

For a bathroom alteration beyond the listed exempt work (for example moving or adding walls, fixtures or piping); plumbing work needs a plumbing permit pulled by a Master Plumber, and new wiring needs an electrical permit

Quick answer

Howard County has no incorporated cities or towns, so the Department of Inspections, Licenses and Permits (DILP) issues permits countywide, including Columbia and Ellicott City. The county's local amendment to IRC Section 105.2 (Council Bill 24-2025, adopting the 2024 IRC) exempts, on existing single-family dwellings, painting, wallpapering or floor covering, installation of kitchen or bathroom cabinets, counter tops and non-gas appliances, replacement of paneling or wallboard, and replacement of ceiling fans, light fixtures or receptacles. Other bathroom alterations need a building permit for Alterations & Repairs, and the exemptions do not apply to structures in the floodplain.

Typical threshold
finish and cabinet work listed in local Section 105.2 item 14 versus other alterations
Issued by
Howard County Department of Inspections, Licenses and Permits
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.

Compare bathroom remodel quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a bathroom remodel permit costs in Howard County

Fee schedule in force
Official scheduleRead .

Alterations & Repairs to Attached and Detached Single Family Dwellings: Filing Fee (non-refundable) $25, plus $50 for a single/small room or area (200 square feet or less) or $100 for more than a single floor or area (over 200 square feet), plus a 10% technology fee on all permits, per the Building Permit Fee Schedule (Howard County Council Resolution #83-2026, Effective July 1, 2026).

Plumbing fixtures are priced on the county's separate Plumbing Permit Fee Schedule.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Howard County compares in Maryland

JurisdictionPermit needed?Threshold
Anne Arundel CountyIt dependsBefore moving or replacing fixtures or piping, adding circuits, or relocating or...
Howard Countythis pageIt dependsfinish and cabinet work listed in local Section 105.2 item 14 versus other alterations
Montgomery CountyIt dependscosmetic work with no structural change versus reconstruction or renovation

How to apply in Howard County

General guide, not specific to this office

What a bathroom remodel permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a bathroom remodel permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Howard County Department of Inspections, Licenses and Permits

Permitting activity in Howard County

In 2025, Howard County authorized permits for 728 new residential housing units (329 single-family, 399 in multi-family buildings), valued at $256M, down from 881 the year before. That works out to about 2.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 339,183.

What else needs a permit in Howard County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsa detached freestanding deck that is less than 25 square feet in area and less than 30 inches above grade is exempt from a building permit; every other deck needs one$50 per structure (Miscellaneous Structures Accessory permit, FY2027 Building Permit Fee Schedule)
Electrical PermitPermit requiredAny size$50 non-refundable permit application fee plus a $50 flat fee for residential alterations and additions
EV Charger PermitPermit requiredAny sizeUnder the Electrical Permit Fee Schedule (Howard County Council Resolution #83-2026, Effective July 1, 2026): Permit Application Fee (Non-Refundable) $50
Fence PermitIt dependsfences 7 ft or under, not enclosing a pool and not in the floodplain, are exempt from a building permit at an existing single-family dwelling; over 7 ft or enclosing a pool requires a Miscellaneous Structures building permit$50 per structure for a fence over 7 feet high; the schedule has the rest
HVAC PermitIt dependspermit required for new installations, fuel or energy source conversions, new or altered systems and duct extensions, and replacement with a change of fuel or power source; not required for exact replacement of existing electrical HVAC equipment$50 non-refundable application fee
Patio PermitNo permit neededExemptHoward County's Building Permit Fee Schedule effective July 1, 2026 has no fee line for a patio
Plumbing PermitPermit requiredAny size$50 non-refundable filing fee (other than Express Plumbing Permit)
Pool PermitPermit requiredAny size$100 for above-ground pools
Roof Replacement PermitIt dependsroof covering replacement with no other structural repairs is exempt, including up to 64 sq ft of roof sheathing; replacing more sheathing or any other structural repair requires a building permitNot published
Shed PermitIt dependssheds under 200 sq ft (one-story, non-conditioned, detached) are exempt from a building permit; 200 sq ft or more requires a Miscellaneous Structures building permit$50 per structure for sheds over 200 and up to 400 sq ft (Miscellaneous Structures Accessory permit, FY2027 fee schedule)
Solar PermitPermit requiredAny size$50 per structure for a residential roof- or ground-mounted solar collector (Miscellaneous Structures Accessory permit, FY2027 fee schedule)
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a bathroom remodel permit in Howard County?
It depends on the project. Finish and cabinet work listed in local Section 105.2 item 14 versus other alterations. If you are unsure how that applies to your project, call the Howard County Department of Inspections, Licenses and Permits at 410-313-2455 before you start.
How much does a bathroom remodel permit cost in Howard County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Howard County Department of Inspections, Licenses and Permits at 410-313-2455.
Where do you apply for a bathroom remodel permit in Howard County?
You can apply through the Howard County permit portal or contact the Howard County Department of Inspections, Licenses and Permits directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Howard County?
Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Howard County applies this before you apply.

From the Library

Bathroom Remodel Permit in other Maryland localities

Everything above, sourced

How this bathroom remodel permit page for Howard County was verified. 1 official source: howardcountymd.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Howard County Department of Inspections, Licenses and Permits. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project