Research
What does a building permit cost?
Verified fees read from official fee schedules across the localities we cover, plus medians from real permit records.
By PermitNotebook Research
Every research page, guide, and tracked rule change PermitNotebook Research has published lives here, each one checked against an official source before it went up. Where a rule everyone repeats turns out to be wrong, we say so and show the count.
Measured from permit and inspection records we ingest and normalise ourselves.
Research
Verified fees read from official fee schedules across the localities we cover, plus medians from real permit records.
By PermitNotebook Research
Research
How long permits actually take, measured from real permit records, slowest localities first.
By PermitNotebook Research
Research
The verdict landscape across every rule we have verified: what usually needs a permit, what usually does not, and where thresholds sit.
By PermitNotebook Research
Research
First-time residential inspection pass percent by trade, measured from real inspection event logs across the localities we cover, with administrative closure events excluded.
By PermitNotebook Research
Guide
The model code leaves the penalty to your local office, and offices charge anything from a flat $30 to many times the permit fee. The most common rule is double. The rules of 32 building departments read on their own schedules and codes, a worked example, the waivers that exist, and the costs beyond the fee.
By PermitNotebook Research last checked
Guide
Yes for every detached garage in Montgomery, Prince George's, Anne Arundel, Baltimore and Howard counties, with plans, setbacks and size caps that differ by county. A pole barn is exempt only as a true farm building, under county law, and still needs an electrical permit. Fees and contacts read on each county's pages.
By PermitNotebook Research last checked
Guide
Montgomery County permits every fence. Baltimore County starts at 42 inches, Prince George's over 4 feet, Anne Arundel over 6 feet or on a corner or waterfront lot, Howard over 7 feet or around a pool. Front-yard heights, corner sight triangles, floodplain and Critical Area rules and each fee, read on the counties' own pages.
By PermitNotebook Research last checked
Guide
Maryland has no statewide shed exemption. Your county decides: Montgomery permits every shed, Baltimore County anything over 120 sq ft, Prince George's and Anne Arundel over 150, Howard at 200. Where the shed may sit, the Critical Area rules, wiring, anchoring and the fee, from each county's own pages.
By PermitNotebook Research last checked
Guide
Paint, tile, flooring and a new vanity cabinet need no permit. Moving a toilet or shower, adding a circuit or a fan, opening a wall or adding a bathroom does. Replacing a fixture in place depends on the city. The line item by item, with how Virginia, Jersey City, San Francisco, Boston, Portland, Chicago, Des Moines, Burlington, Las Vegas and Martin County draw it.
By PermitNotebook Research last checked
Guide
Framing walls, adding circuits, plumbing or ductwork in a basement needs a building permit plus trade permits. Carpet and paint do not. The basement needs an emergency escape opening, and so does every bedroom in it; the ceiling has a minimum height, and smoke alarms get upgraded. The rules, fees and inspections as Overland Park, Loudoun County, Portland, Denver, Grand Rapids and Las Vegas publish them.
By PermitNotebook Research last checked
Guide
In 10 of the 11 state electrical licensing laws we read, a homeowner may wire a single-family home they own and live in without a license. The Massachusetts section lists none. Then the city decides: Albuquerque makes you pass an exam, Philadelphia and Boston require a licensed contractor. The statute text, the conditions, and the three questions to ask before you start.
By PermitNotebook Research last checked
Guide
New wiring, a new outlet or circuit, and any panel or service change need an electrical permit almost everywhere. Changing a bulb, a breaker or a plug-in appliance does not. Swapping a light fixture or outlet depends on the city. The line item by item, in the words of the model code and of Seattle, Portland, Philadelphia, Las Vegas, Grand Rapids, Chicago and Washington State.
By PermitNotebook Research last checked
Guide
Clearing a clog, fixing a leak and swapping a faucet need no plumbing permit. New or moved pipes and gas piping do, and so does a water heater in most places. Replacing a toilet or sink in place depends on the city. The line item by item, then the rough-in and final inspections, from the model code and Portland, Philadelphia, Minneapolis, Boston, Chicago, Las Vegas, Grand Rapids and Seattle.
By PermitNotebook Research last checked
Guide
A certificate of occupancy is the building department saying a finished building may be used. When the code requires one, what it has to state, how to get it after the final inspection, and what a temporary one allows, quoted from the model code and two state rules.
By PermitNotebook Research last checked
Guide
The model code exempts detached outbuildings up to 200 square feet, and a carport sized for a car is often at or past that. Where the line sits in 11 building departments, from 300 square feet in San Diego County to every carport in Polk County, Arlington and Denver.
By PermitNotebook Research last checked
Guide
The model code never names pergolas, so the answer turns on three things your local code does name: whether it is attached to the house, how big it is, and whether it has a roof. Seven building departments that answer it in writing, from no permit to always.
By PermitNotebook Research last checked
Guide
Under the model code most states use, a permit dies if work does not start within 180 days or stops for 180 days between inspections. Where Florida, North Carolina, Tennessee and New Orleans set different clocks, how to ask for an extension, and what an expired permit means.
By PermitNotebook Research last checked
Guide
New cabinets, countertops, paint and flooring need no permit under the model code. Moving a sink, adding a circuit, venting a range hood or taking out a wall does. The line, item by item, with how Boston, San Francisco, Portland, Las Vegas, Grand Rapids and Martin County draw it.
By PermitNotebook Research last checked
Guide
Across the 137 jurisdictions we have verified, an at-grade patio slab and a roofed patio cover often get different answers, most clearly in the 17 rows where the jurisdiction names "patio" on both sides of the line, in its own words. What each jurisdiction actually regulates, with real thresholds, fees and the office to call.
By PermitNotebook Research last checked
Guide
Maryland never wrote a statewide roofing exemption; it handed permitting to the local level. The 5 counties we cover answer differently: a 50 percent sheathing test in Baltimore County, a 64 square foot allowance in Howard, a covering-only list in Montgomery, and a shingles-versus-sheathing line in Prince George's and Anne Arundel. Fees, phone numbers, and what Maryland law requires of the roofer.
By PermitNotebook Research last checked
Guide
A rooftop solar system usually needs a permit, though a real minority of jurisdictions exempt ordinary residential systems outright. We reviewed 137 solar permit rows across 27 states, sorted by how each fee is actually set, and describe our own rows in our own words rather than presenting them as the jurisdictions speaking.
By PermitNotebook Research last checked
Guide
Across 137 jurisdictions, the largest group (57) prices a deck permit from a table keyed to construction value; the rest charge one flat number, a rate tied to the deck itself, or a mix that resists either, and several publish no usable figure at all. A national average would blend numbers that are not measuring the same thing.
By PermitNotebook Research last checked
Guide
There is no honest national shed permit fee. Of 137 jurisdictions we track, 28 charge a flat fee, 20 charge by the square foot, 54 run the shed through a valuation table, 12 use a mechanism that does not reduce to a rate, and 23 give us no usable figure at all. Real jurisdictions, hand-classified, with sources.
By PermitNotebook Research last checked
Guide
Permit records are public. In 80 of the 137 jurisdictions we cover you can look one up yourself online, 38 of them by street address alone, and in the rest a phone call does it. How to search, what a missing record does and does not mean, and how to report work with no permit.
By PermitNotebook Research last checked
Guide
Taking out a wall is the one remodel step that is never on the exemption list, load-bearing or not. What the code actually says, what the 27 states we cover do about it after the fact, and why the bathroom-remodel rule is the closest thing to a national answer.
By PermitNotebook Research last checked
Guide
A stop work order is not the penalty. It is the pause before one. What the order has to say, what you can keep doing while it stands, and the three things every office wants before it lets work resume, with the statute in each of the 27 states we cover.
By PermitNotebook Research last checked
Guide
The 30 inch deck rule is one clause of a four clause exemption: area, height, attachment and the exit door. Failing any single one reinstates the permit, and the attachment clause is the one that catches most decks.
By PermitNotebook Research last checked
Guide
In all six states where we have read the statute, the line is the same: a cord-and-plug charger on an existing outlet is maintenance, and a hardwired 240 volt circuit is permit-triggering electrical work. Two of the six let you start before the permit is filed.
By PermitNotebook Research last checked
Guide
Fence permits are the most exempted type we track, and where a permit is needed the trigger is usually height, from 1 foot in Maricopa County to 9 feet in Eugene. The height line rarely regulates the fence itself.
By PermitNotebook Research last checked
Guide
Usually yes. 92 of 137 jurisdictions require an HVAC permit outright and none exempt the work entirely; the exemption that exists covers a true like-for-like swap. Mini-splits, window units, the 2026 refrigerant rules, what the inspector checks, who may pull the permit and what happens if the unit went in without one.
By PermitNotebook Research last checked
Guide
Across 137 jurisdictions, at least 70 attach a safety barrier requirement to the pool and 53 name electrical work in the rule. The pool permit fee you were quoted is often one line of three.
By PermitNotebook Research last checked
Guide
Roofing permits are gated on repair size in incompatible units: a dollar value, a percentage of roof area, square feet or a layer count. The dollar triggers alone run from $500 to $40,000 across the jurisdictions we verified.
By PermitNotebook Research last checked
Guide
We read the unpermitted-work statute in all 27 states we cover. In roughly half of them the state sets no penalty at all, because the state does not issue building permits. Exposure runs from $10 a day in Missouri to a felony in Florida.
By PermitNotebook Research last checked
Guide
Of the residential permit types we track, only a few have any place that requires no permit at all, and sheds, decks and pools have none. Here is what the exemptions actually cover and where they apply.
By PermitNotebook Research last checked
Guide
Lee County's eConnect portal address has been unreachable since late July 2026, but the same permit search still works at the county's Accela address. No account needed.
By PermitNotebook Research last checked
Guide
The model code exempts decks not more than 30 inches above grade, so that is the number the internet repeats. Many jurisdictions we verified skip the number and require a permit, others draw the line lower, and some measure area instead of height.
By PermitNotebook Research last checked
Guide
The same like-for-like swap costs $20 in Boston, $147 in Spotsylvania County, and no permit at all in Chicago. Across the 16 jurisdictions we cover, the deciding question is usually not where you live but what the unit burns.
By PermitNotebook Research last checked
Guide
A handful of the jurisdictions we have verified let you re-roof a house with no building permit at all, and many of the rest allow it only under conditions. Here is who exempts what, with the rule each one publishes.
By PermitNotebook Research last checked
Guide
Where the 200 square foot shed rule comes from, what the model code text actually says, and why most US jurisdictions we checked use a different number, from Virginia, where every county shares one, to Florida, where counties split.
By PermitNotebook Research last checked
Guide
The model code exempts fences not over seven feet, so the internet repeats seven feet. Across the jurisdictions that publish a height we found lines from one foot to nine, and Phoenix-area cities that draw the line at three.
By PermitNotebook Research last checked
Guide
Seventy-four jurisdictions publish a numeric pool permit threshold. Fifty-two measure water depth, eleven measure surface area, and nine measure volume in gallons. They are not answering the same question, which is why a national answer does not exist.
By PermitNotebook Research last checked
Guide
In eleven of the jurisdictions we cover, the electrical or plumbing permit is issued by a state agency, a health department, or the power utility, not the city or county building office. Applying to the wrong one costs you weeks.
By PermitNotebook Research last checked
Guide
What unpermitted work can mean for financing, insurance, and appraisal, how to check permit history before closing, and the as-built permit path we have verified across 50 states.
By PermitNotebook Research last checked
Guide
What a correction notice means, what re-inspection costs in Fairfax County, Chandler, and Seattle, and how permit expiration interacts with getting the fix done.
By PermitNotebook Research last checked
Guide
Whether to disclose unpermitted work, legalize it before you list, or sell as is, what legalizing generally costs, and the penalties we have verified across 50 states.
By PermitNotebook Research last checked
Guide
The standard residential inspection sequence and the code-cited checkpoints inspectors look for in framing, electrical, plumbing, and mechanical rough-ins, plus decks, roofs, water heaters, and bathroom remodels.
By PermitNotebook Research last checked
Guide
What it means to be the permit holder, contractor-of-record versus owner-builder rules in seven states we have verified, and why jurisdictions that address it tend to want the contractor, not the homeowner, holding the permit.
By PermitNotebook Research last checked
Guide
Why building permit fees are not one number: valuation-based fees versus flat fees, plan review billed as a separate line, trades handed off to a different agency entirely, and why a single national average cannot capture any of it.
By PermitNotebook Research last checked
Bellevue, WA
Ord. 6879
Broward County, FL
Ord. 2025-038
Florida
ch. 2026-63 (HB 803), F.S. 553.79
Howard County, MD
CB24-2025 (Bill No. 24-2025)