What does a building permit cost?
By Mario Bailey Last checked
We read the official fee schedule of every locality we cover and recorded what it says for 1293 permit scenarios across 134 US localities. Each entry below quotes the schedule's own terms, with the verification date. Where a locality publishes no figure, or hands the permit to a state agency, we say that instead of guessing. Many localities bill by project valuation, so a single flat number often does not exist; the notes keep that honesty.
Median fees measured from real permit records
For jurisdictions whose open-data portals publish issued permits, we compute the median fee from the records themselves. These are actual amounts charged, not schedule text.
| Jurisdiction | Median fee | Records |
|---|---|---|
| Chicago, Illinois | $1,142 | 5,329 |
| Mesa, Arizona | $520 | 5,364 |
| Boston, Massachusetts | $90 | 19,468 |
Medians, not averages, so a few large projects cannot skew the figure. Full context in the turnaround study.
Bathroom Remodel permit fees
Verified in 15 localities. Dollar figures appearing in those schedules run from $0.10 to $5,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Falls under the existing-dwelling building permit formula of $100 for the first $5,000 of labor and material cost plus $6 per additional $1,000 plus a 2% state levy, capped at $680 plus levy ($693.60 total), with plumbing or electrical trade permits added for new fixtures, per the county fee page
Verified · Official fee schedule
-
Non-structural bathroom work uses the Short-Form building permit at $20 primary plus $10 per $1,000 of estimated cost; moving walls needs Long-Form at $50 primary plus $10 per $1,000, with plumbing and electrical trade permits on top, per the ISD fee schedule effective 5/15/2023
Verified · Official fee schedule
-
Building subcode charges $15 per $1,000 of estimated renovation cost with a $50 minimum short-permit fee or $100 minimum plan-review fee, plus $10 per plumbing fixture added or replaced, per city ordinance Ch. 160-1
Verified
-
Filed as a residential Alteration Building Permit at $0.78 per sq ft of altered area with a filing fee of 50% of the permit fee or $329.59 whichever is greater, per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01; plumbing fixture work needs a separate WSSC plumbing permit outside county DPS
Verified · Official fee schedule
-
Nonstructural interior remodel up to 500 sq ft with no occupancy or load-bearing change is a flat $250 stand-alone fee per Table 14A-12-1204.2; larger remodels take higher brackets or the calculated permit formula
Verified · Official fee schedule
-
Interior renovation building fee runs $0.34 per square foot with a $180 minimum, plus a 2% surcharge and $65 processing fee ($248.60 total on a typical under-500 sq ft remodel), per the county interior renovation packet under the 7/1/2025 Unified Fee Schedule
Verified · Official fee schedule
-
Falls under renovation, alteration or conversion: $114 if square footage does not change, $171 with a change of use or added square footage, plus separate electrical or plumbing permits for rough-in work and the 2% state levy, per the residential fee schedule effective 7/1/2025
Verified · Official fee schedule
-
Bills as the residential Alteration category at $0.25 per square foot with a $150 minimum, plus separate Trades permits at $0.15 per square foot ($100 minimum) for plumbing or electrical work, plus Virginia's 2% state surcharge, per the FY27 Tax and Fee Schedule
Verified · Official fee schedule
-
No single line item; as an interior alteration it falls to the schedule's $141.75 base fee minimum, plus plumbing (base fee for 1 to 7 fixtures, rising by level) and electrical (base fee for 1 to 100 fixtures or circuits) trade fees when fixtures or wiring change, per Appendix Q effective 2026-07-01
Verified · Official fee schedule
-
Billed as a residential alteration: building permit fee is 1% of construction cost plus a $130 plan review fee, with separate electrical or plumbing trade permits if fixtures are relocated, per the county's Residential Additions and Alterations page
Verified · Official fee schedule
-
Prince William County, Virginia
No dedicated line item; billed as Residential Repairs and Alterations building permit $88.44 base ($110.65 with surcharges) plus a Plumbing Additions/Remodeling permit $88.44 base ($110.65) plus $7.36 per fixture ($9.20), and an Electrical Existing Dwellings permit $44.23 base ($55.35) with per-item charges, only for the trades actually altered, per the FY27 BDD Fee Schedule
Verified · Official fee schedule
-
Interior alterations to a single family home need a $25 filing fee plus $50 for an area of 200 sq ft or less or $100 over 200 sq ft, plus a 10% technology fee on all permits, per the FY27 Building Permit Fee Schedule effective 7/1/2026
Verified · Official fee schedule
Plus 3 more localities with a verified note, each on its own permit page. Browse every bathroom remodel page
Deck permit fees
Verified in 126 localities. Dollar figures appearing in those schedules run from $0.03 to $100,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
A deck over the exemption is a building permit priced from the one- and two-family valuation table in Sec. 18-20(b)(2): $52.00 up to $1,000.00 of valuation, $58.00 from $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 per additional $1,000.00 or fraction thereof to $100,000.00. Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22. One- and two-family work carries no separate construction document review fee. A reinspection is $75.00 under Sec. 18-20(h)(6), and building without the permit first triples the permit fee under Sec. 18-20(e)(2).
Verified · Official fee schedule
-
Newark municipal code Chapter 7:2-3.1c prices deck work as 'Building Renovation and Alteration', 'Fees based on estimated cost of construction for all building types': $28 per $1,000 between $0 and $50,000, $21 per $1,000 from $50,001 to $100,000, and $17 per $1,000 over $100,000, plus a DCA administrative surcharge of $0.80 per $1,000. 'Minimum Building Permit: $58.' (Ord. 6 S+FD, 9-5-2007; code current through 12-20-2023.)
Verified · Official fee schedule
-
Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.'
Verified · Official fee schedule
-
Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024". "Other Building Permit Fees: Minor Renovation Projects (valued less than $75,000) | Residential Renovation Permit | $125" and "Extensive Renovation Projects (valued at $75,000 or greater) | Extensive Renovation Permit | $4 per $1,000 of construction value". The schedule also states "Building permit fees include Plan Review and Building Inspections" and prices reinspections at "First Follow-up Inspection $0", "Second Follow-up Inspection $50", "Third and each Subsequent Follow-up Inspection $100", with "Penalty for Construction Prior to Issuance of Permit 100% of the Permit Fee". Caution on figures: the department's older undated handout "Regulatory Requirements for Residential Permits" still prices this work at "$0.006 x Value of Construction" and the 2012-era step sheets at "$6 per $1,000 of estimated construction cost (minimum fee is $30)", both of which predate the July 1, 2024 schedule. Confirm the current amount with the Permits Section at 678-518-6020 before budgeting.
Verified · Official fee schedule
-
No deck line item appears in the Building Inspection Department Service Fee Schedule (Schedule A, effective July 1, 2024). A deck permit is priced from construction valuation using the Schedule A building permit fee table (for example, '$381.46 for the first $10,000 plus $8.88 for each additional $1,000.00 or fraction thereof, to and including $50,000'), plus building plan review at 80% of the building permit fee with a $140.00 minimum, plus a $20.00 single-permit processing fee.
Verified · Official fee schedule
-
PDS 613 (effective 07/10/2026, FY 25/26) publishes no line item named "deck." Under "PROJECT TYPES NOT LISTED IN THE TABLES ABOVE" the fee is calculated from the Schedule of Building Permit Fees Based on Valuation, which is $374.00 for the first $10,000.00 of total valuation plus $1.00 for each additional $1,000.00 or fraction thereof up to $50,000.00, with a plan review fee of 65% of the building permit fee.
Verified · Official fee schedule
-
At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge; a $22 zoning review fee is due at issuance.
Verified
-
No deck-specific fee line item is published. Deck permits fall under the general Building Services Fees table: Permit Issuance Fee $14.00, plus Total Valuation of Building fee (minimum $19.00, or $11.00 for the first $1,000 plus $2.63 for each additional thousand up to $50,000; higher tiers apply above that), per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026).
Verified · Official fee schedule
-
Building Permit Fees (effective October 2019, revised 7/15/2025): $15 base application fee for all permits, plus a permit fee on estimated project cost ($100 for cost up to $1,000, which includes one rough and one final inspection; $100 plus $10 per $1,000 from $1,000 to $50,000), plus a plan examination fee of 20% of the building permit fee. A deck of 200 sq ft or less that is floating or detached instead pays the zoning compliance permit fee of $25 (projects up to $10,000) or $75 (over $10,000). Expedited plan review adds a $15 expedited plan review fee on top of the $15 base application fee.
Verified · Official fee schedule
-
Mecklenburg County prices the deck building permit off total construction permit value under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 is a $59.70 minimum fee per trade for projects not requiring plan review and $3,001 to $50,000 is '$59.70 plus $12.19 per $1,000 or part over $3,000', plus a $3.00 technology charge on all permits. Owner-as-contractor projects under $40,000 in total construction permit value instead pay $60.00 per BEMP trade base permit fee, $45.00 per BEMP trade plan review if required and $45.00 per inspection trip, with the inspection trip capped at 30 minutes on site. The City of Charlotte FY 2025 Individual Residential Lot Fee Schedule charges $50 Stormwater Services Review for 'Additions, Deck, Pool, Retaining Wall, Shed, Detached Structure' plus $70 Residential Zoning, effective for projects submitted July 1, 2024 to June 30, 2025.
Verified · Official fee schedule
-
A $40.00 non-refundable application fee plus a valuation-based building permit fee, under the Building and Trade Permit Fee Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019. The New Residential Valuation Table prices "Porches, decks, Patios" at "$45.92/ft2" of construction cost, which then runs through the Building Permit Fee Table: "Application Fee Only" at $1,000 or less, otherwise "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000." Plan review is 50% of the building permit fee.
Verified · Official fee schedule
-
Deck permits follow the county's general building permit valuation table: no fee for construction valued at $1,000 or less unless an inspection is required ($15.00 per inspection); $15.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof, up to $50,000 (Schedule of Building Permit Fees).
Verified · Official fee schedule
Plus 114 more localities with a verified note, each on its own permit page. Browse every deck page
Electrical permit fees
Verified in 131 localities. Dollar figures appearing in those schedules run from $0.03 to $100,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Electrical permits for one- and two-family detached dwellings are priced from the same valuation table as every other trade, Sec. 18-20(b)(2): $52.00 for total valuation of $0.00 to $1,000.00, $58.00 for $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00. Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22. Sec. 18-20(h)(9) adds a distinct $54.00 electrical service reconnect fee when an owner asks for an inspection of an existing service so the utility can reconnect, creditable toward a permit fee if permitted work turns out to be needed, and waived where the service was disconnected by a fire in the previous 90 days.
Verified · Official fee schedule
-
Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024". The schedule has no separate electrical trade permit line; the department's "Regulatory Requirements for Residential Permits" lists a combined "Mechanical, Electrical, Plumbing" application type at "$0.006 x Value of Construction", which predates the July 1, 2024 schedule. Standalone residential work under $75,000 falls in the "Residential Renovation Permit | $125" band. Confirm with the Permits Section at 678-518-6020.
Verified · Official fee schedule
-
At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge.
Verified
-
Electrical permits are charged as a trade permit under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 in total construction permit value is a $59.70 minimum fee per trade for projects not requiring plan review, and $3,001 to $50,000 is '$59.70 plus $12.19 per $1,000 or part over $3,000', plus a $3.00 technology charge on all permits. Where the owner serves as the contractor and total construction permit value is less than $40,000, the ordinance charges $60.00 per BEMP trade base permit fee, $45.00 per BEMP trade plan review if required and $45.00 per inspection trip. Item 29 of the same ordinance charges the original permit fee times 3.75 for work started without a permit.
Verified · Official fee schedule
-
A stand-alone electrical permit is valuation based on the same Residential Rate Table, $220 minimum for the $0 to $8,333 bracket, plus a 4% technology improvement fee capped at $800, per the Development Services Schedule of Fees (Ord. 5524, Dec 2025)
Verified · Official fee schedule
-
2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value (Minimum: $130 - Maximum: $8,000)", 40% non-refundable at application and the remainder at issuance, plus a $4.50 State Education and Training Fund fee, a $5.00 Digital Record Retention Fee and a technology fee of $2.00 to $25.00 by base fee range. An Electrical trade license is $90.00 initial and annual renewal.
Verified · Official fee schedule
-
FY 2026 Schedule C Departmental Fee List, Planning & Inspections, Electrical Permits: "Base fee, ea. (non-refundable)" is "$110 plus applicable technology fee," plus per-item charges such as "Each Service or new/replacement of electrical panel/panel board $47 based on quantity plus base fee and applicable technology fee," "Max Service Entrance Fee $130 plus applicable technology fee," and outlets at "1 to 20 ea. $1.17 Based on quantity plus base fee and applicable technology fee." For new and remodeling work the schedule instead uses building-permit valuation tiers, beginning "$1,000.00 to $6,000.00 ... shall be $76 plus applicable technology fee."
Verified · Official fee schedule
-
Table 28-112.2 item 16, "Permit for electrical work," is "As provided by department rules." Those rules are 1 RCNY 101-03, which sets "Electrical permit initial application (excluding minor work)" at $40.00, plus a per-unit additional fee due before electrical sign-off (each outlet, fixture, horsepower of motor, kilowatt of heater, horsepower of air conditioner or kilovolt-ampere of transformer is one unit; the first 10 units are $0.00 and each unit over 10 is $0.25) with service switch, feeder, panel and other add-ons and a $5,000.00 cap on the total additional fee. A minor work electrical permit is $15.00. AC 28-112.2.2, added by Local Law 128 of 2024 and effective December 21, 2025, requires 50 percent of the total fee, but not less than $130.00, at the time of filing, or the whole fee where it is under $130.00.
Verified · Official fee schedule
-
Electrical work at a one or two family dwelling is priced under Code of Ordinances Sec. 5-204(a)(2) alongside building, plumbing, gas and mechanical work: $20.00 for total value of $1.00 to $5,000.00, then $4.00 per $1,000.00 or fraction thereof. Sec. 5-204(b) charges $30.00 for the first re-inspection and $50.00 for each additional one, and Sec. 5-204(c) adds a penalty of 100 percent of the usual permit fee if the work starts before the permit is obtained.
Verified · Official fee schedule
-
Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per additional $1,000 or fraction thereof, plus a 2% state levy; a new-dwelling trade permit is a $100 flat fee plus $2 state levy ($102 total), per Henrico's residential trade permit fee schedule.
Verified · Official fee schedule
-
Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review Fees: valuation up to $4,999.99, "$100.00 plus applicable inspection fees as required"; "The minimum for any electrical permit review fee shall be $150.00 per unit or tenant space plus applicable inspection fees as required."
Verified · Official fee schedule
-
Mecklenburg County, North Carolina
Electrical trade permit priced off total construction value with a $59.70 minimum for projects not requiring plan review plus $12.19 per $1,000 over $3,000 and a $3 technology charge per permit, per the LUESA Fee Ordinance revised July 1 2026
Verified · Official fee schedule
Plus 119 more localities with a verified note, each on its own permit page. Browse every electrical page
EV Charger permit fees
Verified in 13 localities. Dollar figures appearing in those schedules run from $0.15 to $18,975, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Charged as a standard electrical permit at $25 per $1,000 of estimated cost with a $63 minimum and $18,975 maximum; no EV-specific fee line exists, per the city's electrical permit page
Verified · Official fee schedule
-
No EV-specific fee; charger circuits operate above 50 volts so they take the standard existing-dwelling electrical permit at $100 for the first $5,000 of labor and material cost plus $6 per additional $1,000 plus a 2% state levy, per the county electrical permit and fee pages
Verified · Official fee schedule
-
Billed as an electrical fixture under Residential Addition/Alteration Electrical Installation Fees at the $141.75 base fee for Level One (1 to 100 fixtures, circuits or equipment), per Appendix Q effective 2026-07-01
Verified · Official fee schedule
-
No EV-specific line; a charger circuit falls under the county's electrical permit trigger for new wiring, $114 where rough-in is required or $57 for an installation using existing wiring, plus the 2% state levy, per the residential fee schedule effective 7/1/2025
Verified · Official fee schedule
-
$62.19 for an Electrical Charging Station under Other Electrical Equipment, charged in addition to the $111.94 residential electrical permit minimum fee, per DPS-Fees-Electrical-Mechanical-FY27.pdf effective 2026-07-01
Verified · Official fee schedule
-
No EV-specific line; a home charger circuit bills under the residential Trades electric category at $0.15 per square foot with a $100 minimum, plus Virginia's 2% state surcharge, per the FY27 Tax and Fee Schedule
Verified · Official fee schedule
-
No EV-specific line; a charger circuit bills as a single electrical trade permit at $84.15 including the technology fee, per the county fee schedule effective 7/1/2025
Verified · Official fee schedule
-
No EV-specific fee line; a home charger circuit files under the standard residential Electrical Permit at $70 for fixtures, receptacles and circuits, with a service upgrade a separate $70 (0-400 amps), per the July 2022 fee schedule
Verified · Official fee schedule
-
Not separately itemized; an EV charger circuit falls under the residential All Trades electrical rate of $60 per trade per system, plus the 2 percent state levy and 2.75 percent technology fee, per the Development Services Fee Schedule effective 11/1/2024
Verified · Official fee schedule
-
Prince William County, Virginia
No permit or fee if the charger is cord-and-plug connected to an existing circuit per manufacturer instructions; hardwired installs are billed as stationary equipment on the Existing Dwellings electrical schedule, base fee $44.23 ($55.35 with surcharges) plus $11.80 per unit ($14.75 with surcharges), per the FY27 BDD Fee Schedule
Verified · Official fee schedule
-
Not itemized by name; an EV charger circuit falls under the $50 electrical permit application fee plus the $50 flat fee for residential alterations or a service heavy-up, plus a 10% technology fee, per the FY27 Electrical Permit Fee Schedule effective 7/1/2026
Verified · Official fee schedule
-
An Electrical Permit is required per Boston's EVSE installation guide, billed under the electrical fee schedule at $20 application fee plus cost-based charges, per the ISD fee schedule effective 5/15/2023
Verified · Official fee schedule
Plus 1 more localities with a verified note, each on its own permit page. Browse every ev charger page
Fence permit fees
Verified in 121 localities. Dollar figures appearing in those schedules run from $0.05 to $75,001, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or $6 per $1,000 above $75,001), plus a $15 technology fee; no fence-specific line item, per the 2024 Fee Schedule effective 7/1/2024
Verified · Official fee schedule
-
Charlotte County's Residential Fence page lists fees due at issuance: Zoning Review $30, plus a building fee of 0.004 x ICC valuation (only if valuation is $50,000 or more) and a surcharge of 0.025 x the building fee.
Verified
-
No fence-specific fee line item is published. Fence permits fall under the general Building Services Fees table: Permit Issuance Fee $14.00, plus Total Valuation of Building fee (minimum $19.00, or $11.00 for the first $1,000 plus $2.63 for each additional thousand or fraction thereof up to $50,000; higher tiers apply above that), per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026).
Verified · Official fee schedule
-
The Planning Services Fence Guidelines handout (revised 3/3/2025) states a flat Fence Permit Fee of $75.00. The Building Permit Fees schedule (effective October 2019, revised 7/15/2025) adds the line "Fences over 7 feet tall ... building permit fee", so a fence taller than 7 feet is charged the $15 base application fee plus the estimated project cost permit fee ($100 for project cost up to $1,000; $100 plus $10 per $1,000 from $1,000 to $50,000) plus a plan examination fee of 20% of the building permit fee. Properties in a historic district also pay a $35 historic district staff review fee.
Verified · Official fee schedule
-
No fence line item exists. A fence is billed as a residential alteration or repair under the Building and Trade Permit Fee Schedule, approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019: a $40.00 non-refundable application fee "required for all building and trade permits," plus a construction-cost based permit fee that is "Application Fee Only" at $1,000 or less of construction cost and "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000" above that. A plan review fee equal to 50% of the building permit fee applies when valuation exceeds $1,000 and plans must be reviewed. Starting without a permit doubles the money: the schedule's Penalties clause says "Where work for which a permit is required by this code is started or proceeded prior to obtaining said permit, the fees herein specified shall be doubled, but the payment of such double fee shall neither relieve any persons from fully complying with the requirements of this code in the execution of the work nor from any other penalties prescribed herein."
Verified · Official fee schedule
-
No fence-specific line; a fence needing a building permit bills under the Section B101 valuation table, no fee for work valued $1,000 or less unless an inspection is required ($15 per inspection), then $15 for the first $1,000 plus $5 per additional thousand up to $50,000, per the county Schedule of Building Permit Fees
Verified · Official fee schedule
-
A fence reviewed by Zoning only pays the Department of City Planning fee, "Residential Zoning Review $1.00/$1000 of project cost (min. $50.00, max $40,000.00)", plus a technology fee of $2.00 to $25.00 based on the base fee range. If PLI review is also triggered, the 2026 PLI Fee Schedule effective 1/1/2026 adds "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value (Minimum: $130 - Maximum: $8,000)", with 40% of the base fee non-refundable and due at application and the remainder due at issuance, plus a $4.50 State Education and Training Fund fee and a $5.00 Digital Record Retention Fee per permit.
Verified · Official fee schedule
-
The Master Schedule of Fees publishes no flat fence permit fee. Its Table of Construction Valuation (Section 2500, Miscellaneous) lists 'Fences (Over 6' High) $34.00 per lineal foot' as a construction valuation rate, not a fee. The permit fee is then computed from total valuation under Section 2501 Building Construction Permits, which for FY 2026-27 is a $166.28 minimum charge, then $166.28 for the first $4,000.00 plus $18.85 for each additional $1,000.00 or fraction thereof to and including $25,000.00. FY 2026-27 amounts include the 3 percent increase effective 07/01/2026 under Ordinance 24-005.
Verified · Official fee schedule
-
Los Angeles County, California
No fence line item is published. A fence over 6 feet is priced from the valuation-based Table 1-A Building Permit Fees: $65.36 for a total valuation of $0 to and including $700, and $98.09 for more than $700 to and including $25,000 plus $25.27 for each additional $1,000 or fraction thereof in excess of $1,000. A $41.35 permit issuance fee is added to all building permit fees. Building Code Fee Schedule (Title 26 of the County of Los Angeles Code, Ord. No. 2013-0048), effective July 1, 2026.
Verified · Official fee schedule
-
The Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F) has no fence line item. A fence that does need a building permit is charged under Building Permit Fees on the value of the work: "$1 - $2,000 ... $114.50 minimum fee", then $114.50 plus $12.30 for each additional $1,000 up to $25,000. A fence inside the Special Flood Hazard Area also draws the Public Works item "Floodplain development permit w/o buildings ... $71.50", which the schedule says "includes structures such as fences, retaining walls, bridges, paving, etc."
Verified · Official fee schedule
-
Residential zoning clearance permit fee is $75.50 under Tulsa Revised Ordinances Title 49, Chapter 3, Section 303.G (Ord. No. 25351, 7-17-2024). A fence over 7 feet needs a building permit instead, priced from declared valuation: application fee $64.00 for $0 to $15,000.00 of declared valuation (Title 49 Section 301) and building permit fee $133.00 for estimated valuation $0 to $5,000.00 (Section 302). Every permit also carries the general administrative fees in Title 49, Chapter 1: a $5.00 permit system maintenance surcharge on each permit (Section 103), a $4.00 Uniform Building Code Commission fee plus a $0.50 city administrative fee collected under 59 O.S. Section 1000.25 (Section 100), and a minimum fee of $80.00 on any permit (Section 107). Starting work before the permit is issued adds a penalty fee of $214.00 or three times the regular fee, whichever is greater (Section 105). All Title 49 figures are from Ord. No. 25351, 7-17-2024.
Verified · Official fee schedule
-
Unified Development Ordinance Fee Schedule (Rev. Sept. 25) zoning permit line items: 'SINGLE FAMILY RESIDENTIAL (UNDER $10,000) $5.00' and 'SINGLE FAMILY RESIDENTIAL (OVER $10,000) $10.00'. A wall 7 feet or taller takes a residential building permit instead, priced under Code of Ordinances Sec. 5-204(a)(2) (Ord. No. 2014-064, 6-24-14) at $20.00 for total value of $1.00 to $5,000.00 and $4.00 per $1,000.00 or fraction thereof over $5,000.00, plus the $25.00 residential plan review fee. Sec. 5-204(e) adds a $50.00 elevation certificate and inspection checklist fee for fences in a flood plain.
Verified · Official fee schedule
Plus 109 more localities with a verified note, each on its own permit page. Browse every fence page
HVAC permit fees
Verified in 131 localities. Dollar figures appearing in those schedules run from $0.03 to $1,000,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
M-0 fee issuance cost per permit $20.00, M-3.1 fee for the first $1,000 valuation $15.00 then $8.00 for each additional $1,000 under $1,000,000, M-4 minimum permit fee $15.00, and M-3.2.1 SINGLE FAMILY RESIDENTS ONLY, mechanical permit fees shall be based on total valuation (contract price) based on a minimum $1,000.00 per ton, per the 2022 Fee Schedule, Mechanical Permit and Inspection Fees Schedule. Work commencing before permit issuance is charged double fee. All fees exclude an administrative charge of $4.00 and a residential surcharge of $1.00, so $5.00 is added to the residential total, per the 2022 Fee Schedule.
Verified · Official fee schedule
-
Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024". The schedule has no separate mechanical trade permit line; the department's "Regulatory Requirements for Residential Permits" lists a combined "Mechanical, Electrical, Plumbing" application type priced at "$0.006 x Value of Construction", which predates the July 1, 2024 schedule. A standalone residential change-out under $75,000 falls in the "Residential Renovation Permit | $125" band. Confirm with the Permits Section at 678-518-6020.
Verified · Official fee schedule
-
At application: $90 flat building fee unless valuation is $50,000 or more (then 0.004 x ICC valuation), plus a 0.025 x building-fee surcharge.
Verified
-
Contra Costa County, California
Land Development Fee Schedule S-002 D.6, "Mechanical Permit (Other) $75.00 minimum." Fees for mechanical work not covered by the new dwelling, addition or alteration, new commercial, shell, or tenant improvement tiers are calculated from the S-002 A.1 Building Permit valuation table, which starts at $75.00 for improvement value up to $2,000 plus $13.75 for each additional $1,000. Mechanical fees for an addition or alteration to a dwelling unit start at $75.00 for improvement value up to $25,000. Fee schedule adopted May 24, 2022, effective August 10, 2022.
Verified · Official fee schedule
-
Brevard's Residential HVAC/Mechanical Permit Application fee table lists a Building Code Review fee of $75.00 for the first $1,000 of job value plus $3.25 per $1,000 thereafter, plus a $25.00 Application Processing Fee; a Notice of Commencement is required only if job value exceeds $15,000 for this permit type, versus $5,000 for most other residential permit types. No effective date is shown.
Verified
-
FY 2027 Planning, Design and Development Fee Schedule effective July 1, 2026, Mechanical Permit Fees: "Application (Includes 1 Inspection) $52.00" plus equipment fees. Residential lines include "Air Conditioning Units $31.00", "Heating Systems (add duct work) $52.00", "Water Heaters (new construction) $21.00" and "Generator $25.00". Residential Replacement Equipment is cheaper: "Air Conditioning Units / Heat Pumps $21.00", "Furnaces $21.00", "Water Heaters (replacement) $21.00". Ductwork and piping is banded from $31.00 under $3,000 up to $73.00 for $11,000 to $14,999.
Verified · Official fee schedule
-
Stand-alone mechanical work is valuation based via the Residential Rate Table, $220 minimum for the $0 to $8,333 bracket plus a 4% technology fee capped at $800; a straight AC replacement with the same or less electrical load needs no permit per the Residential Construction Homeowners Guide
Verified · Official fee schedule
-
2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value (Minimum: $130 - Maximum: $8,000)", 40% non-refundable at application and the remainder at issuance, plus a $4.50 State Education and Training Fund fee, a $5.00 Digital Record Retention Fee and a technology fee of $2.00 to $25.00 by base fee range. An HVAC/Mechanical trade license is $90.00 initial and annual renewal.
Verified · Official fee schedule
-
Mechanical Permit Fees (F.S. 553.80): Permit Issuance $11.00 with a minimum permit fee of $35.00; valuation $0 to $5,000: $24.00; $5,001 and above: $19.00 plus $2.00 for each additional $1,000, per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026).
Verified · Official fee schedule
-
Mechanical work at a one or two family dwelling is priced under Code of Ordinances Sec. 5-204(a)(2), which covers 'Building, plumbing, gas, mechanical, electrical' at $20.00 for total value of $1.00 to $5,000.00 and $4.00 per $1,000.00 or fraction thereof above that. Under Sec. 5-204(a)(1) the commercial rule is different in kind: 'A permit is required for the electrical, plumbing, gas and HVAC trades, but there will be no fee charged for these trades for new construction, additions, and remodeling jobs where a building permit is obtained by a licensed general contractor provided that the subcontractors are licensed, hold a city qualification card and are listed on the building permit application.'
Verified · Official fee schedule
-
Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per additional $1,000 or fraction thereof, plus a 2% state levy; a new-dwelling trade permit is a $100 flat fee plus $2 state levy ($102 total), per Henrico's residential trade permit fee schedule.
Verified · Official fee schedule
-
HVAC work falls under Building Permit Fees based on the actual cost of work, which start at $75.00 for $0 to $2,000 and $110.00 for $2,001 to $4,000. The associated electrical inspection is charged separately under Equipment and System Inspection Fees: "Air-conditioning or heat pump" $100.00. The fee page carries the notice "Fees for licenses, building, electrical, and plumbing permits, as well as for certificates of occupancy, will change effective July 1, 2026."
Verified · Official fee schedule
Plus 119 more localities with a verified note, each on its own permit page. Browse every hvac page
Patio permit fees
Verified in 95 localities. Dollar figures appearing in those schedules run from $0.03 to $100,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.'
Verified · Official fee schedule
-
Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or $6 per $1,000 above $75,001), plus a $15 technology fee; no patio-specific line item, per the 2024 Fee Schedule effective 7/1/2024
Verified · Official fee schedule
-
No patio-specific fee line item is published. Patio permits fall under the general Building Services Fees table: Permit Issuance Fee $14.00, plus Total Valuation of Building fee (minimum $19.00, or $11.00 for the first $1,000 plus $2.63 for each additional thousand up to $50,000; higher tiers apply above that), per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026).
Verified · Official fee schedule
-
No patio line in Newark municipal code Chapter 7:2-3.1. A roofed patio cover is priced either as an addition ($0.03 per cubic foot for residential buildings) or as renovation and alteration ($28 per $1,000 of estimated cost between $0 and $50,000), subject to the 'Minimum Building Permit: $58.' (Ord. 6 S+FD, 9-5-2007.)
Verified · Official fee schedule
-
No patio-specific line; billed under the Section B101 valuation table, $15 for the first $1,000 plus $5 per additional thousand up to $50,000, plus a plan-check fee of half the permit fee above $1,000, per the county Schedule of Building Permit Fees
Verified · Official fee schedule
-
Los Angeles County, California
No patio line item is published. A patio cover or patio enclosure is priced from the valuation-based Table 1-A Building Permit Fees ($65.36 for a total valuation of $0 to and including $700; $98.09 for more than $700 to and including $25,000 plus $25.27 for each additional $1,000 or fraction thereof in excess of $1,000), plus the $41.35 permit issuance fee. Building Code Fee Schedule (Title 26, Ord. No. 2013-0048), effective July 1, 2026.
Verified · Official fee schedule
-
A carport permit fee is $98.00 under Title 49, Chapter 3, Section 304. A covered patio or porch is otherwise priced as a building permit from valuation: $64.00 application fee for $0 to $15,000.00 declared valuation (Section 301) plus a building permit fee of $133.00 for estimated valuation of $0 to $5,000.00 (Section 302), per Ord. No. 25351, 7-17-2024. Every permit also carries the general administrative fees in Title 49, Chapter 1: a $5.00 permit system maintenance surcharge on each permit (Section 103), a $4.00 Uniform Building Code Commission fee plus a $0.50 city administrative fee collected under 59 O.S. Section 1000.25 (Section 100), and a minimum fee of $80.00 on any permit (Section 107). Starting work before the permit is issued adds a penalty fee of $214.00 or three times the regular fee, whichever is greater (Section 105). All Title 49 figures are from Ord. No. 25351, 7-17-2024.
Verified · Official fee schedule
-
Building permit fee by valuation per Construction Fees Resolution 17-025; residential fee starts at $85.00 for work valued up to $12,000; fees due at permit issuance.
Verified · Official fee schedule
-
No patio specific line item is published. A patio handled as a zoning compliance permit pays $25 for building projects up to $10,000 or $75 for projects over $10,000 under the Building Permit Fees schedule (revised 7/15/2025). A patio over 200 sq ft handled as a building permit pays the $15 base application fee plus the estimated project cost permit fee plus a plan examination fee of 20% of the building permit fee. Grading and soil erosion permit fees are published on a separate schedule.
Verified · Official fee schedule
-
Residential building permit under Code of Ordinances Sec. 5-204(a)(2): 'Value $1.00 to $5,000, Fee $20.00' and 'Over $5,000, $4.00 per $1,000 or fraction thereof', plus the $25.00 residential plan review fee at application. Where only a zoning permit is issued, the Unified Development Ordinance Fee Schedule (Rev. Sept. 25) charges $5.00 for single family residential work under $10,000 and $10.00 over $10,000.
Verified · Official fee schedule
-
Patio covers and enclosures are valuation based via the Residential Rate Table, $220 minimum for the $0 to $8,333 bracket plus a 4% technology fee capped at $800; light-gauge pre-manufactured metal patio covers are permit-exempt per the Residential Construction Homeowners Guide
Verified · Official fee schedule
-
Cook County Code of Ordinances Sec. 32-1, Building Permit Fee Schedule, item 3-B ALTERATIONS, REMODELING AND MISCELLANEOUS ITEMS OF CONSTRUCTION: "A. Minimum Fee (except uses of land not involving buildings) 73.50 plus $18.50 for each additional $1,000.00 of estimated cost in excess of $5,000.00." Projects that change topography or drainage can also draw the Engineering and Site Plan Review fees added effective December 1, 2020: Engineering Review, Residential Uses - Typical, $300.00, and Architectural Site Plan Review, Residential Uses - Typical, $150.00. A $100.00 residential deposit is payable online and deducted from the final permit fee.
Verified · Official fee schedule
Plus 83 more localities with a verified note, each on its own permit page. Browse every patio page
Plumbing permit fees
Verified in 131 localities. Dollar figures appearing in those schedules run from $0.03 to $100,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Plumbing permits for one- and two-family detached dwellings use the Sec. 18-20(b)(2) valuation table: $52.00 for total valuation of $0.00 to $1,000.00, $58.00 for $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00. Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22. Water and sewer service line permits are billed separately by the Water Services Department under the KC Water Rules and Regulations for Water Service Lines (May 2022), not under Sec. 18-20; that counter is reachable at 816-513-2174.
Verified · Official fee schedule
-
Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024". The schedule has no separate plumbing trade permit line; the department's "Regulatory Requirements for Residential Permits" lists a combined "Mechanical, Electrical, Plumbing" application type at "$0.006 x Value of Construction", which predates the July 1, 2024 schedule. Standalone residential work under $75,000 falls in the "Residential Renovation Permit | $125" band. Confirm with the Permits Section at 678-518-6020.
Verified · Official fee schedule
-
At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge.
Verified
-
Plumbing is charged as a trade permit under the LUESA Fee Ordinance (revised July 1, 2026): $1 to $3,000 in total construction permit value is a $59.70 minimum fee per trade for projects not requiring plan review, and $3,001 to $50,000 is '$59.70 plus $12.19 per $1,000 or part over $3,000', plus a $3.00 technology charge on all permits. Water heater changeouts fall under item D.1, Appliance/Equipment Change Out, which covers 'hot water heaters limited to less than 50 gal. or 5500 watts input for electric and 50 gal. or 55,000 BTU for gas' and charges a total permit fee for both trade permits combined of 1.5 times the minimum permit fee when issued through Trade Internet Permitting, or 2 times the maximum permit fee when issued any other way.
Verified · Official fee schedule
-
Limited Alteration Application is the usual homeowner-scale route. Table 28-112.2 item 11 sets the one-, two- or three-family LAA minimum filing fee at $130.00, and DOB's "Limited Alteration Application (LAA) Fees and Penalties, Category 1 & 2 Filing, 1, 2, 3 Family Fees" chart prices it at $130.00 for any estimated job cost up to $5,000, rising by $2.60 per $1,000 above that ($143.00 at $9,001 to $10,000; $208.00 at $34,001 to $35,000). The matching 1 and 2 family penalty for filing after the fact starts at $780.00. Full plumbing alterations are filed as work type PL, priced on construction cost with a PW3 (DOB PW3 fee-structure sheet, Rev. 04/25).
Verified · Official fee schedule
-
Plumbing permit fees are established by City Ordinance 71644. The application fee for all plumbing permits is $30.00. Fixtures (floor drain, sump, water heater, reduced pressure backflow device or double gate/double check valve, roof drain or trapped outlet) are $10.00 each; a tap, water connection or extension is $25.00 each; a sewer extension, connection or repair is $25.00 each; irrigation system zones are $25.00 each; rough inspection $25.00; finish inspection $25.00; re-inspection $30.00. Starting work before the permit issues triggers a surcharge that scales with the permit fee, from $35.00 on a $0 to $50.00 permit up to $1,005.00 over $10,000.00.
Verified · Official fee schedule
-
Plumbing permit fees are set by MCO 200-33 and are not reproduced in the Plan Review and Permit Fees schedule, which covers plan examination only and states plainly "*No plumbing plan review is required for plumbing in dwellings*". For non-dwelling work, plumbing plan examination is priced by fixture count starting at $350 for 11 to 15 fixtures, with "No plumbing plan examination is required for minor alterations involving fewer than 11 fixtures" and a maximum fee of $8,400. Every permit carries the 1.6% IT and Training Surcharge and a processing fee of $20 or $25 (As of January 1, 2025).
Verified · Official fee schedule
-
A stand-alone plumbing permit is valuation based via the Residential Rate Table, $220 minimum for the $0 to $8,333 bracket plus a 4% technology fee capped at $800, per the Development Services Schedule of Fees (Ord. 5524, Dec 2025)
Verified · Official fee schedule
-
Plumbing work at a one or two family dwelling is priced under Code of Ordinances Sec. 5-204(a)(2) with the other trades: $20.00 for total value of $1.00 to $5,000.00, then $4.00 per $1,000.00 or fraction thereof. Water meter and sewer tap sales are handled separately by Utilities and Engineering, not by the plumbing permit fee.
Verified · Official fee schedule
-
Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per additional $1,000 or fraction thereof, plus a 2% state levy; a new-dwelling trade permit is a $100 flat fee plus $2 state levy ($102 total), per Henrico's residential trade permit fee schedule.
Verified · Official fee schedule
-
Fee Schedule (Resolution 2025-231, effective January 1, 2026), Plumbing and Gas Permit Review Fees: valuation up to $4,999.99, "$100.00 plus applicable inspection fees as required"; like-kind residential electric water heater replacement in an attached/multi-unit structure, "computed at $100.00 (fee includes 1 inspection)."
Verified · Official fee schedule
-
Mecklenburg County, North Carolina
Plumbing trade permit priced off total construction value with a $59.70 minimum for projects not requiring plan review plus $12.19 per $1,000 over $3,000 and a $3 technology charge per permit, per the LUESA Fee Ordinance revised July 1 2026
Verified · Official fee schedule
Plus 119 more localities with a verified note, each on its own permit page. Browse every plumbing page
Pool permit fees
Verified in 131 localities. Dollar figures appearing in those schedules run from $0.05 to $100,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
No swimming pool line item appears in the Building Inspection Department Service Fee Schedule (Schedule A, effective July 1, 2024). A pool permit is priced from construction valuation on the Schedule A table, plus building plan review at '80% of the Building Permit fees, $140.00 minimum', plus a $20.00 single-permit processing fee or $30.00 for a combo permit, plus state Strong Motion (SMIP) fees of '$10 per $100,000 valuation' for residential work and CBSC fees of '$1 per $25,000 valuation and $1 minimum'.
Verified · Official fee schedule
-
The pool building permit is priced from the one- and two-family valuation table in Sec. 18-20(b)(2): $52.00 up to $1,000.00 of valuation, $58.00 from $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00. Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22. Information Bulletin IB119 is explicit that the valuation you declare should exclude the electrical and plumbing work, "because this type of work will require separate supplemental permits," each priced from the same table. A structural plan review may be added when the pool is 10 feet or closer to a building on the property.
Verified · Official fee schedule
-
The county building permit is priced off total construction permit value under the LUESA Fee Ordinance (revised July 1, 2026): $3,001 to $50,000 is '$59.70 plus $12.19 per $1,000 or part over $3,000' and $50,001 to $100,000 is '$632.57 plus $5.49 per $1,000 or part over $50,000', plus a $3.00 technology charge on all permits. The associated electrical and any plumbing permits are separate trade permits. The City of Charlotte FY 2025 Individual Residential Lot Fee Schedule charges $50 Stormwater Services Review for 'Additions, Deck, Pool, Retaining Wall, Shed, Detached Structure' plus $70 Residential Zoning, effective for projects submitted July 1, 2024 to June 30, 2025.
Verified · Official fee schedule
-
Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.' Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Residential Swimming Pool 65.00 ea.', with 'Minimum Permit Fee 85.00' and 'Extra Inspection Fee, First Follow-up 45.00'.
Verified · Official fee schedule
-
The pool guideline says the Application Fee, Plan Review Fee and Building Permit Fee all come from page 4 of the Building and Trade Permit Fee Schedule, whose construction-cost table covers "ALL SWIMMING POOLS - NEW CONSTRUCTION, ALTERATIONS & REPAIRS." That is a $40.00 non-refundable application fee, a permit fee of "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000" (then $260.00 plus $4.00 per additional thousand from $50,001 to $100,000), and a plan review fee equal to 50% of the permit fee. Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019. Separate $40.00 application fees apply to the electrical and fuel gas sub-permits.
Verified · Official fee schedule
-
No pool-specific line; billed under the Section B101 valuation table, for example $260 for the first $50,000 of value plus $4 per additional thousand up to $100,000, plus a plan-check fee of half the permit fee, per the county Schedule of Building Permit Fees
Verified · Official fee schedule
-
At application: $94 flat fee for above-ground pools or $200 for in-ground pools, plus a 0.025 x building-fee surcharge; at issuance: Zoning Review $22 and Right-of-Way Review $90, plus building fees based on ICC valuation if $50,000 or more.
Verified
-
$550 base covers building, electric and plan review for a pool, spa or hot tub with deck up to $40,000 in value, plus $5.50 per $1,000 above that, per Combination Permits IV-J of the FY26 BDRS schedule
Verified · Official fee schedule
-
Priced as a building permit from declared valuation: application fee $64.00 for $0 to $15,000.00 of declared valuation (Title 49, Chapter 3, Section 301) plus a building permit fee based on estimated valuation, $213.00 for $5,000.01 to $40,000.00 (Section 302), per Ord. No. 25351, 7-17-2024. A residential zoning clearance permit at $75.50 is also required (Section 303.G). Every permit also carries the general administrative fees in Title 49, Chapter 1: a $5.00 permit system maintenance surcharge on each permit (Section 103), a $4.00 Uniform Building Code Commission fee plus a $0.50 city administrative fee collected under 59 O.S. Section 1000.25 (Section 100), and a minimum fee of $80.00 on any permit (Section 107). Starting work before the permit is issued adds a penalty fee of $214.00 or three times the regular fee, whichever is greater (Section 105). All Title 49 figures are from Ord. No. 25351, 7-17-2024.
Verified · Official fee schedule
-
Contra Costa County, California
The Building Valuation Data Supplement sets a "Swimming pool, lump sum of: $39,514.98" valuation, and the permit fee is computed from that valuation using the S-001 plan review and S-002 building permit tables, plus separate electrical and plumbing inspection fees with a $75.00 minimum each. Fee schedule adopted May 24, 2022, effective August 10, 2022.
Verified · Official fee schedule
-
Building permit fees are based on project cost under the BSEED Fee Schedule effective January 1, 2024, modified 7/18/2025: $2,000 or less, Flat $271.43; Over $2,000 but not over $25,000, First $2,000 Base $271.43 plus $34.09 Per $1,000 or fraction thereof over $2,000. Pool wiring is charged separately on the electrical schedule, PART A Base fee $66 plus $20 for each circuit.
Verified · Official fee schedule
-
Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is valuation based, with a $167.00 minimum fee for total value of construction work of $1 to $500, rising through tiers such as $220.85 for the first $2,000 plus $13.91 for each additional $1,000 up to $25,000. A pool project usually also draws the Electrical Permit Fee Schedule. A 12% State of Oregon surcharge applies to building, plumbing, electrical, and mechanical permits.
Verified · Official fee schedule
Plus 119 more localities with a verified note, each on its own permit page. Browse every pool page
Roof Replacement permit fees
Verified in 128 localities. Dollar figures appearing in those schedules run from $0.03 to $100,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
A reroof is a general building permit priced on valuation under Sec. 33.04(a), published as DSI's Building Permit Fee Schedule (Section 33.04 of the Saint Paul Legislative Code, Effective: 2/25/2023). Sample rows from the schedule: valuation 9,001 to 10,000 = $274, 11,001 to 12,000 = $316, 19,001 to 20,000 = $484. Above $100,000 the fee is $1,499 for the first $100,000 plus $8 for each additional $1,000. The Minnesota state surcharge is $0.50 for jobs valued $1.00 to $1,000, otherwise 0.0005 times job value. DSI notes that Contractor Express items, which include re-roof and roof repair, do not require plan review and can be issued online.
Verified · Official fee schedule
-
An exempt reroof costs nothing. A reroof that loses the exemption, most often because sheathing or structure is being replaced, is a building permit priced from the one- and two-family valuation table in Sec. 18-20(b)(2): $52.00 up to $1,000.00 of valuation, $58.00 from $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00. Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22. Sec. 18-20(e)(2) triples the fee if the work starts before the permit issues, with a carve-out where the work is done at a one-family dwelling by the person who owns and occupies it and the permit is applied for before the end of the workday following notification.
Verified · Official fee schedule
-
Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.'
Verified · Official fee schedule
-
Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or $6 per $1,000 above $75,001), plus a $15 technology fee; re-roofs have no separate residential fee line, per the 2024 Fee Schedule effective 7/1/2024
Verified · Official fee schedule
-
Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024". "Other Building Permit Fees: Minor Renovation Projects (valued less than $75,000) | Residential Renovation Permit | $125" and "Extensive Renovation Projects (valued at $75,000 or greater) | Extensive Renovation Permit | $4 per $1,000 of construction value". The schedule also states "Building permit fees include Plan Review and Building Inspections" and prices reinspections at "First Follow-up Inspection $0", "Second Follow-up Inspection $50", "Third and each Subsequent Follow-up Inspection $100", with "Penalty for Construction Prior to Issuance of Permit 100% of the Permit Fee". A residential re-roof valued under $75,000 therefore falls in the $125 Residential Renovation Permit band. Caution on figures: the department's older undated handout "Regulatory Requirements for Residential Permits" still prices this work at "$0.006 x Value of Construction" and the 2012-era step sheets at "$6 per $1,000 of estimated construction cost (minimum fee is $30)", both of which predate the July 1, 2024 schedule. Confirm the current amount with the Permits Section at 678-518-6020 before budgeting.
Verified · Official fee schedule
-
At application: building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) plus a 0.025 x building-fee surcharge; no flat fee is listed for roof permits, unlike most other residential permit types.
Verified
-
No re-roof-specific fee line item is published. Roof replacement permits fall under the general Building Services Fees table: Permit Issuance Fee $14.00, plus Total Valuation of Building fee (minimum $19.00, or $11.00 for the first $1,000 plus $2.63 for each additional thousand up to $50,000; higher tiers apply above that), per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026).
Verified · Official fee schedule
-
No roofing line item is published. A flat roof reroof or recover pays the $15 base application fee plus the estimated project cost permit fee ($100 for cost up to $1,000; $100 plus $10 per $1,000 from $1,000 to $50,000) plus a plan examination fee of 20% of the building permit fee, under the Building Permit Fees schedule effective October 2019 and revised 7/15/2025. Expedited plan review adds a $15 expedited plan review fee. Properties in a historic district also pay $35 for historic district staff review.
Verified · Official fee schedule
-
No roofing-specific line item is published. A roofing permit is charged off total construction permit value under the LUESA Fee Ordinance (revised July 1, 2026), where $1 to $3,000 is a $59.70 minimum fee per trade for projects not requiring plan review and $3,001 to $50,000 is '$59.70 plus $12.19 per $1,000 or part over $3,000', plus a $3.00 technology charge on all permits issued. Starting the work first is expensive: item 29 of the same ordinance, 'Fee for Work Started without a Permit', is the original permit fee times 3.75.
Verified · Official fee schedule
-
The roofing guideline sends all three fees to page 4 of the Building and Trade Permit Fee Schedule, the construction-cost table for "RESIDENTIAL - ALTERATIONS & REPAIRS": a $40.00 non-refundable application fee, then "Application Fee Only" at $1,000 or less of construction cost or "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000" above that, plus a plan review fee equal to 50% of the permit fee where plans are required. Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019.
Verified · Official fee schedule
-
Priced as a building permit from valuation: $64.00 application fee for $0 to $15,000.00 declared valuation (Title 49, Chapter 3, Section 301) plus a building permit fee of $133.00 for estimated valuation of $0 to $5,000.00 or $213.00 for $5,000.01 to $40,000.00 (Section 302), per Ord. No. 25351, 7-17-2024. Title 49, Chapter 5, Section 501.J separately prices the 'Removal and replacement of rooftop units for purposes of re-roofing' at a flat $35.00 mechanical fee. Every permit also carries the general administrative fees in Title 49, Chapter 1: a $5.00 permit system maintenance surcharge on each permit (Section 103), a $4.00 Uniform Building Code Commission fee plus a $0.50 city administrative fee collected under 59 O.S. Section 1000.25 (Section 100), and a minimum fee of $80.00 on any permit (Section 107). Starting work before the permit is issued adds a penalty fee of $214.00 or three times the regular fee, whichever is greater (Section 105). All Title 49 figures are from Ord. No. 25351, 7-17-2024.
Verified · Official fee schedule
-
Los Angeles County, California
No reroofing line item is published. A reroof is priced from the valuation-based Table 1-A Building Permit Fees ($65.36 for a total valuation of $0 to and including $700; $98.09 for more than $700 to and including $25,000 plus $25.27 for each additional $1,000 or fraction thereof in excess of $1,000), plus the $41.35 permit issuance fee. Where a rooftop photovoltaic system is removed for the reroof, Building Code Manual 1512 Article 1 requires a second solar permit carrying only the issuance fee and a one hour inspection fee. Building Code Fee Schedule (Title 26, Ord. No. 2013-0048), effective July 1, 2026.
Verified · Official fee schedule
Plus 116 more localities with a verified note, each on its own permit page. Browse every roof replacement page
Shed permit fees
Verified in 127 localities. Dollar figures appearing in those schedules run from $0.02 to $100,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
A shed that needs a permit is a general building permit priced from the one- and two-family valuation table in Sec. 18-20(b)(2) of the Code of Ordinances: $52.00 for total valuation of $0.00 to $1,000.00, $58.00 for $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00, and above $100,000.00 $483.00 for the first $100,000.00 plus $1.41 for each additional $1,000.00. Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22. There is no separate construction document review fee on one- and two-family work: Sec. 18-20(c)(1) charges that only "For other than one- and two-family dwellings." Optional add-ons are a $80.00 fast track permit fee under Sec. 18-20(b)(8) and a $30.00 scheduled express review fee for one- and two-family dwellings under Sec. 18-20(c)(4). Starting work before the permit is issued triples the fee under Sec. 18-20(e)(2).
Verified · Official fee schedule
-
No shed-specific line in Newark municipal code Chapter 7:2-3.1 (Ord. 6 S+FD, 9-5-2007). Where a permit is required, building work is priced as 'Building Renovation and Alteration' at $28 per $1,000 of estimated cost of construction between $0 and $50,000 (then $21 per $1,000 to $100,000, $17 per $1,000 above that), or at $0.03 per cubic foot for a new residential structure, subject to the 'Minimum Building Permit: $58.' The $58 non-refundable processing fee is credited against the total.
Verified · Official fee schedule
-
Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.'
Verified · Official fee schedule
-
Building Permit Fees are based on the actual cost of work: $75.00 for $0 to $2,000, $110.00 for $2,001 to $4,000, $145.00 for $4,001 to $6,000, rising in steps to $985.00 for $58,001 to $60,000. The fee page carries the notice "Fees for licenses, building, electrical, and plumbing permits, as well as for certificates of occupancy, will change effective July 1, 2026." No separate shed line item is published.
Verified · Official fee schedule
-
At application: flat fee $90, plus a 0.025 x building-fee surcharge and a $22 zoning flat fee; at issuance: building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a $90 Right-of-Way Review fee.
Verified
-
No shed or accessory-structure-specific fee line item is published. Shed permits fall under the general Building Services Fees table: Permit Issuance Fee $14.00, plus Total Valuation of Building fee (minimum $19.00, or $11.00 for the first $1,000 plus $2.63 for each additional thousand up to $50,000; higher tiers apply above that), per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026).
Verified · Official fee schedule
-
Building Permit Fees (effective October 2019, revised 7/15/2025), under the Zoning Compliance permit heading: "Sheds under 200 square feet, includes one inspection ... $75". The same schedule prices zoning compliance permits at $25 for building projects up to $10,000 and $75 for projects over $10,000. A shed larger than 200 sq ft pays the $15 base application fee plus the estimated project cost permit fee ($100 for cost up to $1,000; $100 plus $10 per $1,000 from $1,000 to $50,000) plus a plan examination fee of 20% of the building permit fee.
Verified · Official fee schedule
-
County building permit, when one is needed, is priced from the LUESA Fee Ordinance (revised July 1, 2026): Total Construction Permit Value $1 to $3,000 is a $59.70 minimum fee per trade for projects not requiring plan review, and $3,001 to $50,000 is '$59.70 plus $12.19 per $1,000 or part over $3,000', plus a $3.00 technology charge on all permits issued. Where the owner serves as the contractor and total construction permit value is less than $40,000, the ordinance instead charges a $60.00 base permit fee per BEMP trade, $45.00 per BEMP trade for plan review if required, and $45.00 per inspection trip. On the city side the FY 2025 Individual Residential Lot Fee Schedule charges a $50 Stormwater Services Review for 'Additions, Deck, Pool, Retaining Wall, Shed, Detached Structure' plus $70 Residential Zoning, and the FY25 Residential Zoning Fee Schedule prices a standalone Zoning Use Permit at $330; both are effective for projects submitted July 1, 2024 to June 30, 2025. The fee ordinance also sets item 29, 'Fee for Work Started without a Permit', at the original permit fee times 3.75.
Verified · Official fee schedule
-
A $40.00 non-refundable application fee plus a valuation-based building permit fee, under the Building and Trade Permit Fee Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019. The New Residential Valuation Table sets construction cost at "$45.92/ft2" for "Accessory Structures, Unheated" and "$116.15/ft2" for "Accessory Structures, Heated"; the resulting valuation runs through the Building Permit Fee Table, which is "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000." The plan review fee is 50% of the building permit fee.
Verified · Official fee schedule
-
No shed-specific line; an accessory structure needing a permit bills under the Section B101 valuation table, no fee at $1,000 or less unless inspected, then $15 for the first $1,000 plus $5 per additional thousand up to $50,000, per the county Schedule of Building Permit Fees
Verified · Official fee schedule
-
2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value (Minimum: $130 - Maximum: $8,000)", with 40% of the base fee non-refundable and due at application and the remainder due at issuance. Add a $4.50 State Education and Training Fund fee, a $5.00 Digital Record Retention Fee, and a technology fee of $2.00 to $25.00 by base fee range. Zoning review adds "Residential Zoning Review $1.00/$1000 of project cost (min. $50.00, max $40,000.00)".
Verified · Official fee schedule
-
Los Angeles County, California
No shed line item is published. A shed that exceeds the exemption is priced from the valuation-based Table 1-A Building Permit Fees ($65.36 for a total valuation of $0 to and including $700; $98.09 for more than $700 to and including $25,000 plus $25.27 for each additional $1,000 or fraction thereof in excess of $1,000), plus the $41.35 permit issuance fee. Building Code Fee Schedule (Title 26, Ord. No. 2013-0048), effective July 1, 2026.
Verified · Official fee schedule
Plus 115 more localities with a verified note, each on its own permit page. Browse every shed page
Solar permit fees
Verified in 129 localities. Dollar figures appearing in those schedules run from $0.02 to $300,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Appendix A states 'The following permit fees will apply to residential and commercial solar permits' immediately before its Valuation Table: up to $5,000.00 in valuation costs $85.00; $5,000.00 and over costs $150.00 plus $3.25 per thousand dollars (or fraction) over $5,000.00, capped at a $300,000.00 maximum permit fee. Separately, a re-roof combined with solar panel removal/replacement or solar shingles is billed at a flat $150.00 permit fee under the re-roofing fee lines. Effective October 1, 2025, per Resolution #25-036R.
Verified · Official fee schedule
-
Each trade permit is priced from the one- and two-family valuation table in Sec. 18-20(b)(2), which covers building, mechanical, plumbing and electrical permits alike: $52.00 up to $1,000.00 of valuation, $58.00 from $1,001.00 to $2,000.00, then $58.00 for the first $2,000.00 plus $4.33 for each additional $1,000.00 or fraction thereof to and including $100,000.00, and $483.00 for the first $100,000.00 plus $1.41 per additional $1,000.00 above that. Information Bulletin IB162 requires the declared valuation to include the entire scope of the project, including the solar panels themselves. The scheduled express review option adds $30.00 for one- and two-family dwellings under Sec. 18-20(c)(4). Sec. 18-20 was last amended by Ord. No. 220612, Sec. 1, 10-27-22.
Verified · Official fee schedule
-
Solar has no dedicated line item. The permit is charged off total construction permit value under the LUESA Fee Ordinance (revised July 1, 2026), where $3,001 to $50,000 is '$59.70 plus $12.19 per $1,000 or part over $3,000' and $50,001 to $100,000 is '$632.57 plus $5.49 per $1,000 or part over $50,000', plus a $3.00 technology charge on all permits. A ground-mounted or pole-mounted array that needs the City of Charlotte LDIRL pays $70 Residential Zoning under the FY 2025 Individual Residential Lot Fee Schedule, effective for projects submitted July 1, 2024 to June 30, 2025, plus any Urban Forestry tree preservation tier of $75, $225 or $375.
Verified · Official fee schedule
-
Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.' The Electrical Permit Fee Schedule, Document #4100 dated 7/16/24, has no solar line item; it prices the work through 'Minimum Permit Fee 85.00', 'Panel 10.00 ea.' and the amp-rated service lines ('200 Amp. Service 99.00 ea.').
Verified · Official fee schedule
-
Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or $6 per $1,000 above $75,001), plus a $15 technology fee; the solar application requires a cost estimate and no separate solar fee line exists, per the 2024 Fee Schedule effective 7/1/2024
Verified · Official fee schedule
-
Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024". The schedule grants a discount rather than setting a separate solar price: "Green Building Credit [...] There will be a 5% Building Permit Fee reduction for the installation of the following: - Solar panel installations for nonresidential and residential buildings - EV charger unit installations for nonresidential and residential developments". The underlying permit is priced from the Other Building Permit Fees table, where "Minor Renovation Projects (valued less than $75,000) | Residential Renovation Permit | $125".
Verified · Official fee schedule
-
At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge.
Verified
-
For expedited residential solar the Solar Photovoltaic (PV) System Permitting Checklist shows the electric permit basic application fee WAIVED, residential solar panels $0.00, and inspection $35.00 if applicable, with no building permit. Electrical Permit Fees (effective January 2020) confirm the residential line "Solar Panels per set of 3 panels ... $0". Non expedited residential and commercial solar also pays a building permit under the Building Permit Fees schedule (revised 7/15/2025) flat solar scale: estimated cost $0 to $10,000 is a $37.50 plan examination fee plus a $150 permit fee; $10,001 to $50,000 is $75 plus $200; over $50,000 is $100 plus $400. The building plan examination fee of 20% expressly excludes solar permits.
Verified · Official fee schedule
-
Two permits, two fees. The guideline charges the array as a "Residential - Alterations & Repairs permit fee per Building and Trade Permit Fee Schedule," which is a $40.00 non-refundable application fee plus "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000." The electrical sub-permit carries its own $40.00 application fee plus the Electrical Permit Fee Table rate of "$0.25 per ampere (amp)" for new, replacement or upgrade service. Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019.
Verified · Official fee schedule
-
2026 PLI Fee Schedule, effective 1/1/2026: "Base Permit Fee (Residential) $6.00 per $1,000 of Construction Value (Minimum: $130 - Maximum: $8,000)", 40% non-refundable at application and the remainder at issuance, plus a $4.50 State Education and Training Fund fee, a $5.00 Digital Record Retention Fee and a technology fee of $2.00 to $25.00 by base fee range. Zoning review adds "Residential Zoning Review $1.00/$1000 of project cost (min. $50.00, max $40,000.00)". PLI's fee schedule publishes no separate solar line item.
Verified · Official fee schedule
-
Solar voltaic (residential and commercial) is charged per the building permit fee table in Construction Fees Resolution 17-025; residential table starts at $85.00 for work valued up to $12,000.
Verified · Official fee schedule
-
Building permit fees are based on project valuation under the Department of Buildings and Inspections Fee Schedule effective July 1, 2026 (for example, a $10,000.00 valuation RCO project with plans is $336.00), plus a $49.00 RCO application processing fee and the 1% state, 3% technology, 5% planning, 1% training and 1% financial recovery surcharges. IBI charges the electrical permit fee separately.
Verified · Official fee schedule
Plus 117 more localities with a verified note, each on its own permit page. Browse every solar page
Water Heater permit fees
Verified in 15 localities. Dollar figures appearing in those schedules run from $0.15 to $5,000, and the two ends are rarely for the same thing: minimum permit fees, flat per-trade rates, plan-review percentages, and valuation tiers all appear below exactly as each schedule states them.
-
Electric, gas and oil water heaters need a mechanical permit for new or replacement installs, billed at $100 for the first $5,000 of labor and material cost plus $6 per additional $1,000 plus a 2% state levy, per the county mechanical permit and fee pages
Verified · Official fee schedule
-
Water heater replacement is a flat $147 covering the $100 base plus 2% surcharge and $45 processing fee, per the county mechanical packet under the 7/1/2025 Unified Fee Schedule
Verified · Official fee schedule
-
Replacing an electric water heater with a new electric unit needs no permit; a gas water heater repaired or replaced with a like appliance is $57, new gas installation $114, gas piping to the appliance only $57, plus the 2% state levy, per the residential fee schedule effective 7/1/2025
Verified · Official fee schedule
-
Prince William County, Virginia
Billed under Plumbing as an appliance: base fee $88.44 ($110.65 with surcharges) plus $7.36 per appliance ($9.20) for electric or gas units; replacing an electric water heater with a same-size unit in the same location needs no permit per the Do I Need a Permit guide, per the FY27 BDD Fee Schedule
Verified · Official fee schedule
-
No water-heater line; installation or replacement bills under the residential Trades plumbing category at $0.15 per square foot with a $100 minimum, plus Virginia's 2% state surcharge, per the FY27 Tax and Fee Schedule
Verified · Official fee schedule
-
A gas water heater needs a trade permit at $84.15 including the technology fee; replacing a non-gas unit needs no permit, per the county Do I Need a Building Permit sheet and fee schedule
Verified · Official fee schedule
-
Billed as a household appliance permit, $78.75 for one appliance per Ch. 61-1-3(d)13, with an added plumbing fixture fee possible when supply or drain connections change, per Appendix Q effective 2026-07-01
Verified · Official fee schedule
-
No permit to repair or in-kind replace a water heater in a residential building up to 4 stories per chicago.gov; otherwise $75 per dwelling unit per Table 14A-12-1204.2
Verified · Official fee schedule
-
No dedicated line; install or replacement bills under the standard Plumbing Permit at $70 for 1 and 2 family dwellings, with a gas-fired unit also triggering the separate $70 Gas Permit fee, per the July 2022 fee schedule
Verified · Official fee schedule
-
Not separately itemized; a water heater replacement bills as a plumbing or mechanical trade permit under the All Trades line at $60 per trade per system, plus the 2 percent state levy and 2.75 percent technology fee, per the Development Services Fee Schedule effective 11/1/2024
Verified · Official fee schedule
-
Water heater replacement bills as the $50 plumbing filing fee plus the $25 fixture-replacement exception fee for a water heater, plus a 10% technology fee, per the FY27 Plumbing Permit Fee Schedule effective 7/1/2026
Verified · Official fee schedule
-
Flat $31 plumbing permit fee to replace a water heater in a one or two family dwelling, per the L&I construction fee schedule effective 1/1/2025
Verified · Official fee schedule
Plus 3 more localities with a verified note, each on its own permit page. Browse every water heater page
Methodology
Every fee note above was written while reading the locality's current official fee schedule and was reviewed against a quoted line of that schedule before it entered the dataset, with the date recorded. Notes repeat the schedule's own billing basis (flat fee, valuation tier, plan review percentage) rather than reducing everything to one number.
Honest gaps stay gaps: a few localities publish no usable schedule (some block archives, some publish none for certain trades), and some permits are issued by a state agency instead of the locality. Those rows say exactly that.
The measured medians come from official open-data portals and are computed from real issued permits. Sample sizes are shown; medians are used throughout. Read more about the process on how we verify.
What will your project need?
Answer three questions and get the verified requirements, fees, and office links for your locality.