Georgia / Gwinnett County

Solar Permit in Gwinnett County, Georgia

Permit required

Yes, a permit is required

Before installing a rooftop or ground-mounted solar photovoltaic system at a house.

Quick answer

A residential solar photovoltaic installation is the installation of an electrical system, so Gwinnett County Construction Code section 106.1 requires a permit before the work starts, and no solar exemption appears in the section 106.4 exempt-work list. The county's current fee schedule confirms the permit exists by discounting it, giving a 5 percent building permit fee reduction for solar panel installations on residential and nonresidential buildings. Gwinnett's weekly Building Permits Issued reports show these permits going out to solar contractors on single family houses with a type of work of "Electrical Only".

Issued by
Gwinnett County Department of Planning and Development, Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?

Georgia's owner-builder rule (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Gwinnett County

Fee schedule in force
Official scheduleRead .
  • Planning and Development Fee Schedule, "Building Permit Fees (Effective August 25, 2026)".
  • The schedule sets no separate solar price;
  • it grants a discount: "There will be a 5% Building Permit Fee reduction for the installation of the following: - Solar panel installations for nonresidential and residential buildings".
  • It does not say which building permit fee a solar installation is charged.
  • Its Other Building Permit Fees are $125 for a Residential Renovation Permit on Minor Renovation Projects (valued less than $75,000) and $4 per $1,000 of construction value on Extensive Renovation Projects (valued at $75,000 or greater).
  • Confirm the amount with the Permits Section at 678-518-6020.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Gwinnett County compares in Georgia

No Georgia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
AtlantaPermit requiredNot published
Cobb CountyPermit requiredSee schedule
DeKalb CountyPermit requiredSee schedule
Gwinnett Countythis pagePermit requiredSee schedule

How to apply in Gwinnett County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Gwinnett County Department of Planning and Development, Building Division

Permitting activity in Gwinnett County

In 2025, Gwinnett County authorized permits for 3,946 new residential housing units (2,950 single-family, 996 in multi-family buildings), valued at $1.1B, down from 5,603 the year before. That works out to about 3.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,018,099.

What else needs a permit in Gwinnett County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

Planning and Development Fee Schedule, "Building Permit Fees (Effective August 25, 2026)", for every permit type below. The fee column shows what differs by project.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsBefore erecting, installing, enlarging, altering, repairing, removing, converting or...See schedule
Fence PermitIt dependsheight of a fence; masonry and concrete fence walls follow a separate 4 foot limitSee schedule
HVAC PermitIt dependsBefore installing, altering, repairing, removing, converting or replacing a fixed...See schedule
Plumbing PermitIt dependsBefore installing, altering, repairing, removing, converting or replacing a plumbing...See schedule
Pool PermitIt dependsprefabricated pools installed entirely above ground that also hold no more than 5,000 gallonsSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsfloor area of a one-story detached accessory structure that contains no electrical or plumbing systemSee schedule

Frequently asked questions

Do you need a solar permit in Gwinnett County?
Yes, before installing a rooftop or ground-mounted solar photovoltaic system at a house. If you are unsure how that applies to your project, call the Gwinnett County Department of Planning and Development, Building Division at 678-518-6020 before you start.
How much does a solar permit cost in Gwinnett County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Gwinnett County Department of Planning and Development, Building Division at 678-518-6020.
Where do you apply for a solar permit in Gwinnett County?
You can apply through the Gwinnett County permit portal or contact the Gwinnett County Department of Planning and Development, Building Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Gwinnett County?
Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-19(d)(1) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-17(g), as reenacted by SB 553, effective July 1, 2026). Confirm how Gwinnett County applies this before you apply.

From the Library

Solar Permit in other Georgia localities

Everything above, sourced

How this solar permit page for Gwinnett County was verified. 2 official sources: gwinnettcounty.com, gwinnettcounty.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Gwinnett County Department of Planning and Development, Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page