Georgia / DeKalb County

Solar Permit in DeKalb County, Georgia

Permit required

Yes, a permit is required

Before mounting solar panels or installing a solar energy system, including the electrical interconnection and any panel or service change it requires.

Confirmed on official page Verified DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division

By Mario Bailey, verified against official sources

Quick answer

Unincorporated DeKalb County requires permitting for solar. The county lists Solar among its specialty permit types and directs installations to comply with zoning, building and safety regulations, and Sec. 7-30(a) requires a permit before any alteration to a building or to an electrical system other than ordinary repairs. Nothing in the county's exemption list at Sec. 7-30(d) covers photovoltaic panels, and the electrical portion has to be applied for by a licensed electrical contractor.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before mounting solar panels or installing a solar energy system, including the electrical interconnection and any panel or service change it requires.

What a solar permit costs in DeKalb County

Line item
solar permitBy formulaBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum Permit Fee; $50 Certificate of Occupancy or Certificate of Completion). Some commercial projects require Fire Review & Inspection Fees ($100 Fire Life Safety Review; $100 Fire Site Review; $100 Fire Inspection). Please note that additional fees may apply depending on the type of permit being submitted." DeKalb does not currently publish a full building permit fee schedule online; the fee schedule address printed on the application form no longer resolves to any fee document. The accompanying electrical work is priced on the Electrical Permit Application (revised 07/09/2025), whose "Fee Schedule: MINIMUM FEE $120" line and per item service, panel change and sub feed charges cover a photovoltaic interconnection; there is no separate solar line item.

How DeKalb County compares in Georgia

No Georgia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
AtlantaPermit requiredNot published
Cobb CountyPermit requiredFee follows the small residential construction cost table, $80 base for cost...
DeKalb Countythis pagePermit requiredBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245...
Gwinnett CountyPermit requiredPlanning and Development Fee Schedule, "Building Permit Fees (Effective July...

How to apply in DeKalb County

A rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.

What most solar permit applications include:

  • Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
  • The plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
  • Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
  • The site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
  • The one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
  • Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
  • Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).

General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division sets the exact checklist for DeKalb County.

Where to apply in DeKalb County:

DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division

Inspections and closing out your permit

Inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.

  1. Where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
  2. The inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
  3. PV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
  4. Bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
  5. At the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
  6. Utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the DeKalb County permit portal or by phone at 404-371-2155 (option 3).

Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a solar permit in DeKalb County?
Unincorporated DeKalb County requires permitting for solar. The county lists Solar among its specialty permit types and directs installations to comply with zoning, building and safety regulations, and Sec. 7-30(a) requires a permit before any alteration to a building or to an electrical system other than ordinary repairs. Nothing in the county's exemption list at Sec. 7-30(d) covers photovoltaic panels, and the electrical portion has to be applied for by a licensed electrical contractor. Always confirm with the DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division before starting.
How much does a solar permit cost in DeKalb County?
Building Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum Permit Fee; $50 Certificate of Occupancy or Certificate of Completion). Some commercial projects require Fire Review & Inspection Fees ($100 Fire Life Safety Review; $100 Fire Site Review; $100 Fire Inspection). Please note that additional fees may apply depending on the type of permit being submitted." DeKalb does not currently publish a full building permit fee schedule online; the fee schedule address printed on the application form no longer resolves to any fee document. The accompanying electrical work is priced on the Electrical Permit Application (revised 07/09/2025), whose "Fee Schedule: MINIMUM FEE $120" line and per item service, panel change and sub feed charges cover a photovoltaic interconnection; there is no separate solar line item. Contact the office for current amounts.
Where do you apply for a solar permit in DeKalb County?
You can apply through the DeKalb County permit portal or contact the DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in DeKalb County?
Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-13(d); O.C.G.A. 43-14-14): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-13(d) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-14). Confirm how DeKalb County applies this before you apply.

From the Library

What else needs a permit in DeKalb County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum...
Electrical PermitPermit requiredNot specifiedElectrical Permit Application (revised 07/09/2025): "Fee Schedule: MINIMUM FEE $120...
Fence PermitIt dependsheight of the fenceBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum...
HVAC PermitPermit requiredNot specifiedMechanical Permit Application (revised 07/09/2025): "Fee Schedule: MINIMUM FEE $120.
Patio PermitPermit requiredNot specifiedBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum...
Plumbing PermitPermit requiredNot specifiedPlumbing Permit Application: "Fee Schedule: MINIMUM FEE $120 Additional $200 for Fire...
Pool PermitIt dependsprefabricated pools installed entirely above groundBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum...
Roof Replacement PermitPermit requiredNot specifiedBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum...
Shed PermitPermit requiredNot specifiedBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum...

Solar Permit in other Georgia localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not DeKalb County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page