Georgia / DeKalb County

Solar Permit in DeKalb County, Georgia

Permit required

Yes, a permit is required

Before mounting solar panels or installing a solar energy system, including the electrical interconnection and any panel or service change it requires.

Quick answer

Unincorporated DeKalb County requires permitting for solar. The county lists Solar among its specialty permit types and directs installations to comply with zoning, building and safety regulations, and Sec. 7-30(a) requires a permit before any alteration to a building or to an electrical system other than ordinary repairs. Nothing in the county's exemption list at Sec. 7-30(d) covers photovoltaic panels, and the electrical portion has to be applied for by a licensed electrical contractor.

Issued by
DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?

Georgia's owner-builder rule (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in DeKalb County

Fee schedule in force
Official scheduleRead .
Published in
DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule:
  • "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)";
  • the Building Permit Application gives "Total Minimum Fees $245 ($195 Minimum Permit Fee; $50 Certificate of Occupancy or Certificate of Completion)".
  • The Electrical Permit schedule in the same document has a "Minimum Permit Fee: $100 ($20 Technology Fee is additional)".
  • Neither schedule has a line naming solar or photovoltaic systems.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How DeKalb County compares in Georgia

No Georgia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
AtlantaPermit requiredNot published
Cobb CountyPermit requiredSee schedule
DeKalb Countythis pagePermit requiredSee schedule
Gwinnett CountyPermit requiredSee schedule

How to apply in DeKalb County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division

Permitting activity in DeKalb County

In 2025, DeKalb County authorized permits for 1,321 new residential housing units (805 single-family, 516 in multi-family buildings), valued at $420M, up from 1,238 the year before. That works out to about 1.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 774,394.

What else needs a permit in DeKalb County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Electrical Permit: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)"
Fence PermitIt dependsheight of the fenceSee schedule
HVAC PermitPermit requiredAny sizeDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), HVAC Permits: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)"
Patio PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Plumbing Permits: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)"
Pool PermitIt dependsprefabricated pools installed entirely above groundDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule: "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)"
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a solar permit in DeKalb County?
Yes, before mounting solar panels or installing a solar energy system, including the electrical interconnection and any panel or service change it requires. If you are unsure how that applies to your project, call the permit office at 404-371-2155 (option 3) before you start.
How much does a solar permit cost in DeKalb County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at 404-371-2155 (option 3).
Where do you apply for a solar permit in DeKalb County?
You can apply through the DeKalb County permit portal or contact the DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in DeKalb County?
Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-19(d)(1) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-17(g), as reenacted by SB 553, effective July 1, 2026). Confirm how DeKalb County applies this before you apply.

From the Library

Solar Permit in other Georgia localities

Everything above, sourced

How this solar permit page for DeKalb County was verified. 1 official source: dekalbcountyga.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page