Georgia / DeKalb County

Patio Permit in DeKalb County, Georgia

Permit required

Yes, a permit is required

Before adding a patio. Applicants are directed to speak with a Zoning Officer first, and patio square footage is declared as impervious area on the Building Permit Application.

Quick answer

DeKalb County treats a patio addition as permitted work. The county's Residential Site Plan Revision Inquiry form tells patio applicants to see a Zoning Officer before applying at the Permit Intake Counter, the Building Permit Application has a dedicated Outdoor Areas patio square footage field feeding the impervious area calculation, and Sec. 7-30(a) requires a permit before construction of any structure other than ordinary repairs. The county's exemption list at Sec. 7-30(d)(1) runs items (A) through (I) and has no patio or paving item. DeKalb publishes no patio specific do-I-need-a-permit statement, so this verdict is built from those county documents rather than from a single sentence, and a reader planning a slab on grade should confirm on 404-371-2155.

Issued by
DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare patio contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a patio permit costs in DeKalb County

Fee schedule in force
Official scheduleRead .
Published in
DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule:
  • "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)" and "Certificate of Occupancy Fee $50";
  • the schedule has no line naming patios.
  • The Building Permit Application states the same total: "Total Minimum Fees $245 ($195 Minimum Permit Fee; $50 Certificate of Occupancy or Certificate of Completion)".

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in DeKalb County

General guide, not specific to this office

What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division

Patio Permit in DeKalb County compared with nearby Georgia localities

LocalityPermit needed?ThresholdWhat each Georgia schedule saysVerified
DeKalb CountyPermit requiredAny sizeSee schedule
AtlantaNot confirmedNot confirmedThe general building permit line is $7 per $1,000 of cost of construction with a $150 minimum; the schedule has the rest
Cobb CountyIt dependsa patio attached to the house that adds to the home's footprint needs an Addition Permit; the county's pages do not state a rule for a patio that is not attached to the houseSee schedule
Gwinnett CountyNot confirmedNot confirmedNot published

Permitting activity in DeKalb County

In 2025, DeKalb County authorized permits for 1,321 new residential housing units (805 single-family, 516 in multi-family buildings), valued at $420M, up from 1,238 the year before. That works out to about 1.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 774,394.

What else needs a permit in DeKalb County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Electrical Permit: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)"
Fence PermitIt dependsheight of the fenceSee schedule
HVAC PermitPermit requiredAny sizeDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), HVAC Permits: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)"
Plumbing PermitPermit requiredAny sizeDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Plumbing Permits: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)"
Pool PermitIt dependsprefabricated pools installed entirely above groundDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule: "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)"
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeDeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule: "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)"

Frequently asked questions

Do you need a patio permit in DeKalb County?
Yes, before adding a patio. Applicants are directed to speak with a Zoning Officer first, and patio square footage is declared as impervious area on the Building Permit Application. If you are unsure how that applies to your project, call the permit office at 404-371-2155 (option 3) before you start.
How much does a patio permit cost in DeKalb County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at 404-371-2155 (option 3).
Where do you apply for a patio permit in DeKalb County?
You can apply through the DeKalb County permit portal or contact the DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in DeKalb County?
Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-19(d)(1) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-17(g), as reenacted by SB 553, effective July 1, 2026). Confirm how DeKalb County applies this before you apply.

From the Library

Patio Permit in other Georgia localities

Everything above, sourced

How this patio permit page for DeKalb County was verified. 2 official sources: dekalbcountyga.gov, dekalbcountyga.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project