Permit types

Do you need a patio permit?

It depends entirely on where you live, and the differences are larger than most national guides admit. We read the code, ordinance, or fee schedule published by each of 178 US counties and cities and recorded what it actually says.

Where are you building?

The rule is set locally and the spread is wide, so start with your own jurisdiction. We have read the published rule in 178 of them.

The short answer

Of the 136 jurisdictions where we record a rule, 28 require a permit outright, 96 require one only in certain conditions, 12 require no permit at all.

The most common published threshold is 200 sq ft, used by 11 of the 21 jurisdictions that state a threshold in sq ft. That leaves 10 of them on a different number, which is why a national rule of thumb is not a safe answer for your own address.

42 of the 178 jurisdictions publish nothing we could verify for this permit type. We record those as unconfirmed rather than guessing.

The size thresholds, and how much they disagree

36 of the 178 jurisdictions publish a specific number. They do not all measure the same thing: 2 incompatible units are in use for patio permits (sq ft, inches), and they cannot be averaged into a single figure.

Measured in sq ft (21 jurisdictions)

Measured in inches (13 jurisdictions)

Threshold Jurisdictions Where
6 inches 2 Nashville, Fort Worth
8 inches 1 Anne Arundel County
12 inches 1 Boise
18 inches 1 Indianapolis
30 inches 8 Aurora, Stamford, New Castle County, Chicago, Arlington, El Paso, King County, Thurston County

Measured in USD (2 jurisdictions)

Threshold Jurisdictions Where
$5,000 1 Little Rock
$40,000 1 Mecklenburg County

Thresholds are recorded as the jurisdiction states them. Which side of the number triggers the permit varies, so read your own locality's page before relying on one.

What a patio permit costs

112 of our patio permit rows carry a fee answer taken from the jurisdiction's own published schedule, across 112 localities. There is no single number to quote, and not because we did not look: jurisdictions price this permit in genuinely different ways. Some charge a flat fee, some a percentage of the job's assessed valuation, some a rate per square foot, and some do not price it at all because the work is permitted by a state agency or a utility instead. Each row below is that jurisdiction's own wording.

Locality Pricing model What each patio permit schedule says Verified
Chandler Arizona By valuation No patio-cover-specific fee line, patio covers are billed as a standard building permit by valuation with a $50... schedule 11 Nov 2026
Gilbert Arizona By valuation Valuation-based building permit fee, minimum $50 schedule 11 Nov 2026
Maricopa County Arizona By valuation No flat patio fee schedule 11 Nov 2026
Mesa Arizona By valuation Patio covers and enclosures are valuation based via the Residential Rate Table, $220 minimum for the $0 to $8,333... schedule 11 Nov 2026
Peoria Arizona Per unit Valuation-based building permit fee, minimum 87 dollars schedule 11 Nov 2026
Phoenix Arizona By valuation Patio permits have no dedicated fee line schedule 11 Nov 2026
Pima County Arizona By valuation No patio-specific line schedule 11 Nov 2026
Scottsdale Arizona Per unit Patio covers are permitted as a covered non-A/C addition, $237 base fee plus $0.54 per square foot of covered area... schedule 11 Nov 2026
Tucson Arizona By valuation Large-area paving is filed as a Development Package schedule 23 Oct 2026
Little Rock Arkansas By valuation Building permit valued on the cost of the work ("Proper documentation, i.e., copy of contract or letter of affidavit... schedule 30 Oct 2026
Alameda County California By valuation No patio cover line item appears in the Building Inspection Department Service Fee Schedule (Schedule A, effective... schedule 15 Aug 2026
Contra Costa County California Per unit The Building Valuation Data Supplement values a "Patio cover (includes pre-fab types, usually with ICBO research... schedule 15 Aug 2026
Fresno County California Per unit No flat patio permit fee is published schedule 15 Aug 2026
Los Angeles California Per unit Valuation-based building permit per LAMC 91.113 Table 1-A ($65.00 for total valuation of $100.01 to $2,000, rising by... schedule 11 Nov 2026
Los Angeles County California By valuation No patio line item is published schedule 15 Aug 2026
Orange County California By valuation Patio, Standard: Covers, Decks, Balconies, Enclosures: $768 for FY 2024-25, $803 for FY 2025-26, $819 for FY 2026-27 schedule 15 Aug 2026
Riverside County California Flat fee Lattice Patio Cover County Standard (BPT-LPAT): $411.90 fixed fee schedule 15 Aug 2026
Sacramento California Per unit Patio covers are valued at $34.50 per square foot per CDD-0245's construction valuation table (rev 07-12-2026), then... schedule 11 Nov 2026
Sacramento County California By valuation No patio cover line item is published schedule 15 Aug 2026
San Bernardino County California Flat fee Patio covers are priced off the FY 2026/27 Construction Fee Schedule adopted under County Code 16.0204(a)(1), which... schedule 15 Aug 2026
San Diego California Flat fee Per IB-501 Table 501C (August 2026): Patio Cover, pre-approved, $1,501.42 plan check plus $353.13 inspection each schedule 11 Nov 2026
San Diego County California Flat fee PDS 613 (effective 07/10/2026, FY 25/26) names patios in its over-the-counter miscellaneous line: "Misc Permit OTC schedule 15 Aug 2026
San Jose California Flat fee Not separately itemized for residential work schedule 11 Nov 2026
Santa Clara County California Per unit No patio-specific flat fee is published 15 Aug 2026
Aurora Colorado Not priced On the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)") the line item "Single Family... schedule 16 Aug 2026
Denver Colorado By valuation Valuation-based building permit fee per CPD Table 1 with a $20 minimum schedule 11 Nov 2026
Sussex County Delaware Per unit Sussex County Building Permit Fee Guide: construction value (table rates such as $128.10/sq ft residential, $52.23/sq... schedule 3 Oct 2026
Broward County Florida By valuation No separate patio fee line schedule 11 Nov 2026
Hernando County Florida Flat fee No dedicated Patio line item is published on the Building Division fee schedule schedule 13 Aug 2026
Lee County Florida Flat fee Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational... schedule 11 Nov 2026
Leon County Florida Flat fee The Fee Schedule has no line item named "Patio" or "Aluminum Structure" schedule 13 Aug 2026
Martin County Florida By valuation Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee... schedule 23 Oct 2026
Miami-Dade County Florida Flat fee No dedicated patio line schedule 11 Nov 2026
Orange County Florida Per unit A concrete patio slab is valued at $5 per sq ft then charged under the Accessory Structures and Uses to One and Two... schedule 11 Nov 2026
Palm Beach County Florida By valuation Charged by value of construction with a $75 minimum for a single family, duplex or townhouse patio or porch enclosure... schedule 11 Nov 2026
Pasco County Florida Per unit Base permit fee $45 schedule 11 Nov 2026
Pinellas County Florida By valuation An aluminum structure such as a screen room, pool cage, porch or carport is $250.00 plus $1.00 per $1000.00 of value... schedule 11 Nov 2026
Polk County Florida By valuation Building permit fee by valuation per Construction Fees Resolution 17-025 schedule 11 Nov 2026
St. Johns County Florida By valuation No patio-specific fee line item is published schedule 13 Aug 2026
Cobb County Georgia By valuation Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or... schedule 11 Nov 2026
DeKalb County Georgia Flat fee DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule: "Minimum Permit Fee:... schedule 11 Nov 2026
Honolulu Hawaii By valuation Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials, plus a plan review fee of 20%... schedule 3 Oct 2026
Boise Idaho By valuation Building permit fee from Table No. 1-A by valuation (e.g schedule 3 Oct 2026
Meridian Idaho Per unit "Covered patios / Storage Sheds - Valuation": $50.00 base fee plus $5.50 add'l for each $1,000 of project value or... schedule 23 Oct 2026
Cook County Illinois By valuation Cook County Code of Ordinances Sec. 32-1, Building Permit Fee Schedule, item 3-B ALTERATIONS, REMODELING AND... schedule 15 Aug 2026
Fort Wayne Indiana Not priced A patio that needs a permit is priced as an accessory structure on the Department of Planning Services Fee Schedule... schedule 15 Aug 2026
Indianapolis Indiana Flat fee DBNS Fee Schedule (Permits, as of 1.5.2026): Improvement Location Permit - Residential (ILP), "Other improvements... schedule 15 Aug 2026
Overland Park Kansas By valuation Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less... schedule 3 Oct 2026
Baton Rouge Louisiana Per unit The Permit & Inspection Fees page publishes no patio line item schedule 16 Aug 2026
New Orleans Louisiana By valuation Where a permit is required, the building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x... schedule 16 Aug 2026
Anne Arundel County Maryland By valuation No building permit fee for an exempt patio schedule 30 Oct 2026
Howard County Maryland Not priced Howard County's Building Permit Fee Schedule effective July 1, 2026 has no fee line for a patio schedule 11 Nov 2026
Montgomery County Maryland Not priced No fee for a ground-level concrete or paver patio since no permit is required schedule 11 Nov 2026
Prince George's County Maryland Flat fee DPIE Fee Schedule, effective March 2, 2025, line item "Patio - Residential > 500 Sq Ft", minimum permit fee $151:... schedule 16 Aug 2026
Ann Arbor Michigan By valuation No patio specific line item is published schedule 15 Aug 2026
Sterling Heights Michigan Flat fee Where a concrete permit is required, Building Permit Application 26-27 fee chart: 'Concrete' $78.00, plus the... schedule 15 Aug 2026
Minneapolis Minnesota By valuation No permit fee schedule 11 Nov 2026
Saint Paul Minnesota By valuation There is no patio line item in the fee schedule schedule 15 Aug 2026
Kansas City Missouri By valuation A flat patio on existing grade is exempt and costs nothing schedule 16 Aug 2026
St. Louis Missouri By valuation A patio cover is charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for... schedule 16 Aug 2026
Clark County Nevada By valuation Patio covers bill as a valuation-based building permit under Table 3-A starting at $54 for the first $500 of value... schedule 11 Nov 2026
Henderson Nevada Flat fee $298 $298 for the first 200 sq ft of a standard-plan residential patio plus $14 per additional 100 sq ft, custom patios and... schedule 11 Nov 2026
Las Vegas Nevada Flat fee Table 3-E OTHER CONSTRUCTION FEES: "Carports, Canopies, Patio Covers, Shade Structures (each) - Pre-Fabricated" plan... schedule 30 Oct 2026
Jersey City New Jersey By valuation No dedicated patio line 6 Jul 2026
Newark New Jersey By valuation No patio line in Newark municipal code Chapter 7:2-3.1 schedule 15 Aug 2026
Albuquerque New Mexico By valuation Building permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to $500.00": $23.50 schedule 23 Oct 2026
Bernalillo County New Mexico By valuation Building permit fees are valuation-based under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A:... schedule 23 Oct 2026
Buffalo New York By valuation The residential building permit fee schedule has no patio line schedule 15 Aug 2026
Rochester New York Flat fee Exterior Paved Area Fees, published on the city's building permit fees page: "Exterior paved area or parking lot"... schedule 15 Aug 2026
Town of Brookhaven New York Flat fee Town of Brookhaven Building Division Fee Schedule 2026, Construction table: the schedule has no line naming patios, so... schedule 11 Nov 2026
Charlotte North Carolina Flat fee No patio-specific line item is published on either side schedule 15 Aug 2026
Greensboro North Carolina By valuation Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' schedule 16 Aug 2026
Mecklenburg County North Carolina Per unit Building permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan... schedule 11 Nov 2026
Raleigh North Carolina Flat fee No patio line item in the FY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027) schedule 23 Oct 2026
Wake County North Carolina Per unit Planning and Development Fees, as of 1/1/22: 'Zoning Permit (Land use, Home Occupation & Zoning Letter) | Land Use... schedule 15 Aug 2026
Cincinnati Ohio Flat fee Fee Schedule effective July 1, 2026 lists "Zoning Certificate of Compliance" and "Certificate of Appropriateness" at... schedule 16 Aug 2026
Franklin County Ohio Flat fee Franklin County EDP Fee Schedule, 'Effective Jan schedule 16 Aug 2026
Oklahoma City Oklahoma Per unit Oklahoma City Municipal Code Chapter 60, General Schedule of Fees, Section 60-12-7 Alterations, removal, repair: "(a)... schedule 16 Aug 2026
Tulsa Oklahoma By valuation A carport permit fee is $98.00 under Title 49, Chapter 3, Section 304 schedule 16 Aug 2026
Eugene Oregon By valuation No flat patio fee schedule 16 Aug 2026
Portland Oregon By valuation Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is... schedule 16 Aug 2026
Philadelphia Pennsylvania Not priced No fee schedule 11 Nov 2026
Providence Rhode Island Flat fee Zoning certificate for compliance: $25.00 (Zoning Ordinance: "The fee for a zoning certificate and for a zoning... schedule 30 Oct 2026
Columbia South Carolina By valuation Residential building permit under Code of Ordinances Sec. 5-204(a)(2): 'Value $1.00 to $5,000, Fee $20.00' and 'Over... schedule 16 Aug 2026
Nashville Tennessee By valuation Uses the same residential building permit rate as decks, $5 per $1,000 of valuation plus a $25 zoning examination fee... schedule 11 Nov 2026
Williamson County Tennessee By valuation No patio-specific line schedule 11 Nov 2026
Arlington Texas Flat fee Planning and Development Services Fee Schedule, Effective June 1, 2026, Resolution No. 26 - 151, Residential... schedule 15 Aug 2026
Corpus Christi Texas Per unit FY 2026 Development Fee Schedule, Residential Construction - New, Remodels, and Additions: Building Permit $0.461 per... schedule 15 Aug 2026
Dallas Texas Flat fee No patio cover line in the Permit Fee Schedule effective July 1, 2025 schedule 11 Nov 2026
El Paso Texas Flat fee FY 2026 Schedule C has no line item named "patio" or "patio cover." The closest published Planning & Inspections... schedule 15 Aug 2026
Fort Worth Texas Flat fee No patio-specific line item is published schedule 15 Aug 2026
Harris County Texas Flat fee OCE Permits Fee Schedule (effective 10/01/2025), Residential Development, "Accessory Structures - All Other Structures... schedule 30 Oct 2026
Houston Texas Flat fee No dedicated patio fee schedule 11 Nov 2026
Lubbock Texas Per unit Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September 30, 2026: "Residential Building... schedule 15 Aug 2026
Plano Texas Per unit The Jan schedule 15 Aug 2026
Burlington Vermont By valuation Zoning permit, FY2027 Fee Schedule (effective July 1, 2026): "Basic Zoning Permit (non-design control RL)", "Fence... schedule 8 Nov 2026
Arlington County Virginia By valuation LDA/SWM fees per FY27 DES fee schedule schedule 11 Nov 2026
Fauquier County Virginia Not priced No fee schedule 11 Nov 2026
Henrico County Virginia By valuation No permit fee schedule 11 Nov 2026
Prince William County Virginia By valuation A building permit is not required for patios which are not designed to support a future structure and that are not... schedule 11 Nov 2026
Virginia Beach Virginia By valuation If a permit applies, residential fees start at $50 plus area or valuation based charges, plus a 2% state levy and a... schedule 11 Nov 2026
Bellevue Washington By valuation No separate patio line item schedule 11 Nov 2026
Clark County Washington By valuation Clark County Code Table 6.140.030-1 lists a simple garage, carport, patio cover or deck at $350.50, which includes... schedule 11 Nov 2026
King County Washington Per unit No separate patio line schedule 11 Nov 2026
Pierce County Washington By valuation Attached patio covers use the same valuation based building permit fee as other building permits (PCC Table... schedule 11 Nov 2026
Seattle Washington Flat fee No standalone patio permit schedule 11 Nov 2026
Snohomish County Washington By valuation Priced from the PDS valuation table starting at a $45.00 permit fee plus $29.25 plan check fee at the lowest valuation... schedule 11 Nov 2026
Tacoma Washington By valuation Additions to single-family and duplex homes are charged 2.81% of ICC Building Valuation under Table 8-4 of the PDS Fee... schedule 11 Nov 2026
Thurston County Washington By valuation Building permit and plan review fees are valuation based schedule 11 Nov 2026
Madison Wisconsin By valuation No patio permit is issued, so there is no permit fee schedule 16 Aug 2026
Milwaukee Wisconsin By valuation No permit and therefore no DNS permit fee schedule 16 Aug 2026
Cheyenne Wyoming By valuation No building permit fee schedule 8 Nov 2026

112 rows, every one taken from the jurisdiction's published schedule for patio permits and linked to its page. Every patio permit row also sits inside the cross-type study at what building permits cost.

Cite this data

PermitNotebook (2026). Patio Permit fees and requirements in 112 US localities, verified against published fee schedules. https://permitnotebook.com/permits/patio/

Patio Permit rules by state

50 states, 178 counties and cities. Pick your state for the locality-by-locality comparison, or go straight to your county.

State Localities Required Conditional Not required Thresholds published
Florida 31 7 14 0 500 sq ft
California 15 5 9 0 120 sq ft, 200 sq ft, 300 sq ft
Virginia 12 0 10 1 2,500 sq ft
Texas 11 1 10 0 200 sq ft, 30 inches, 6 inches
Arizona 9 1 8 0 200 sq ft, 3,000 sq ft
Washington 8 0 6 2 200 sq ft, 30 inches
North Carolina 6 3 2 0 $40,000
Maryland 5 0 2 2 500 sq ft, 8 inches
New York 5 0 3 0 2,000 sq ft
Georgia 4 1 1 0 None published
Michigan 4 0 2 0 None published
Ohio 4 2 0 1 None published
Colorado uniform 3 0 3 0 30 inches
Nevada uniform 3 0 3 0 200 sq ft
South Carolina 3 1 0 0 None published
Tennessee 3 0 1 0 6 inches
Delaware 2 1 1 0 30 inches
Hawaii 2 0 1 0 None published
Idaho uniform 2 0 2 0 12 inches, 200 sq ft
Illinois 2 1 1 0 30 inches
Indiana uniform 2 0 2 0 18 inches
Kansas 2 0 1 0 None published
Kentucky 2 0 0 1 None published
Louisiana 2 1 1 0 None published
Massachusetts uniform 2 0 0 0 None published
Minnesota 2 0 1 1 None published
Missouri uniform 2 0 2 0 None published
Nebraska 2 0 1 0 200 sq ft
New Jersey uniform 2 0 2 0 None published
New Mexico 2 1 1 0 None published
Oklahoma 2 1 1 0 None published
Oregon uniform 2 0 2 0 200 sq ft
Pennsylvania 2 0 1 0 None published
Wisconsin uniform 2 0 0 2 None published
Alabama 1 0 0 0 None published
Alaska 1 0 0 0 None published
Arkansas 1 0 1 0 $5,000
Connecticut 1 0 1 0 30 inches
Iowa 1 0 0 0 None published
Maine 1 0 0 0 None published
Mississippi 1 0 0 0 None published
Montana 1 0 0 0 None published
New Hampshire 1 0 0 0 None published
North Dakota 1 0 0 1 None published
Rhode Island 1 1 0 0 None published
South Dakota 1 0 0 0 None published
Utah 1 0 0 0 None published
Vermont 1 1 0 0 None published
West Virginia 1 0 0 0 None published
Wyoming 1 0 0 1 None published

A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.

How patio permits work, start to finish

Applying

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

Inspections and close-out

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

This is common practice under the model codes, not any one office's procedure. Some places build under their own code instead, such as New York City's Construction Codes and Wisconsin's Uniform Dwelling Code. Each locality page carries that office's own permit page, fees and portal. Sources: 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions), 2021 International Residential Code (IRC), Section R109 (Inspections).

Common questions about patio permits

Do I need a patio permit?
For patio work it depends on the size of the job and where you are. A patio permit is issued by your city or county rather than the state, so the rule is local. Across the 178 jurisdictions where we have read the patio rule, 28 require a permit outright, 96 require one only in certain conditions, 12 require no permit at all.
Is there a patio permit exemption?
In 96 of the 178 jurisdictions we cover, a patio permit is not needed below a published threshold, and that threshold differs from one office to the next. The size thresholds section above lists each jurisdiction's own patio figure with its source, and the same patio job can be exempt in one county and permitted in the next.

Find the patio permit rule where you live

Hire it out

Sponsored

If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.