Florida / Broward County

Patio Permit in Broward County, Florida

Permit required

Yes, a permit is required

Before pouring any concrete patio slab

Quick answer

A building permit is required for patio slabs in unincorporated Broward County. Driveways and patio slabs are listed as a permit category on the official Building Code and Permits forms page. Minimum slab thickness and reinforcement standards apply under the Florida Building Code. This requirement applies in the Broward Municipal Services District (BMSD).

Issued by
Broward County Building Code Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare patio contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What your patio permit must meet in Florida

Florida covered patios and screened patios or lanais are built under the Florida Building Code, Residential, 8th Edition (2023), which uses its own patio-cover appendix with wind load as the governing design criterion, while aluminum-frame screen enclosures are engineered under the wind-load provisions of the Florida Building Code, Building.

  • Patio covers are governed by the FBC Residential patio-cover appendix; in the 8th Edition its design-loads section was revised to remove the snow-load reference, leaving wind load as the governing design criterion statewide (FBC-R Appendix H, AH105.1).
  • Wind loads for screen enclosures are not calculated under the normal building wind-load method; they must be determined under Florida Building Code, Building, Section 2002.4 instead, per an express exception in Section 1609.1.1 of the current code (FBC-B 1609.1.1, 2002.4).

Based on Florida Building Code, Residential, 8th Edition (2023), Appendix H (AH105.1); Florida Building Code, Building, 8th Edition (2023), Sections 1609.1.1 and 2002.4. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a patio permit costs in Broward County

Fee schedule in force
Official scheduleRead .

No separate patio fee line;

patios fall under the Structural permit schedule, the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.29 (Ord. 2025-038, eff. 5-1-25)

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Broward County compares in Florida

JurisdictionPermit needed?Threshold
Broward Countythis pagePermit requiredAny size
Hernando CountyIt dependsSand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by name
Lee CountyIt dependsA permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit.
Leon CountyIt dependsPatio covers, sunrooms, and screen or pool enclosures are handled as aluminum structures requiring a permit; a plain open, unroofed, at-grade patio slab is not separately addressed in any published county page found.
Martin CountyPermit requiredAny size
Miami-Dade CountyIt dependsopen patio slabs, walkways and pavers outside the building do not require a building permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; slabs for screened patios and pool slabs are not covered by that exemption; patio covers need a building permit
Orange CountyPermit requiredAny size

How to apply in Broward County

General guide, not specific to this office

What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Broward County Building Code Division

  • 2307 W Broward Blvd Suite 300, Fort Lauderdale, FL 33312
  • Phone: (954) 765-4400
  • Email: building@broward.org

Permitting activity in Broward County

In 2025, Broward County authorized permits for 2,690 new residential housing units (712 single-family, 1,978 in multi-family buildings), valued at $715M, up from 1,655 the year before. That works out to about 1.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 2,013,317.

About Broward County

Broward County has about 863,128 housing units. The median home is valued at $380,400, against a median household income of $74,534. About 63% of homes are owner-occupied, and the typical home was built around 1980.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

What else needs a permit in Broward County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeDecks fall under the Structural permit schedule, the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical permit is the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest
Fence PermitPermit requiredAny sizeFences fall under the Structural permit schedule, the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.29 (Ord. 2025-038, eff. 5-1-25)
HVAC PermitPermit requiredAny sizeMechanical (air conditioning and ventilation) permit is the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest
Plumbing PermitPermit requiredAny sizePlumbing permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.32 (Ord. 2025-038, eff. 5-1-25)
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependsA roofing permit is required for reroofing. Florida law exempts work valued at less than $7,500 on a single-family dwelling on written request, but not structural, electrical, plumbing, mechanical or gas work and not property in a flood hazard area; no Broward County page says whether a reroof can use that exemption, so confirm with the Building Code Division.Structural permit with a roofing-specific minimum: the greater of a $250 minimum base roofing permit fee or 3.0% of job value; the schedule has the rest
Shed PermitPermit requiredAny sizeSheds fall under the Structural permit schedule, the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.29 (Ord. 2025-038, eff. 5-1-25)
Solar PermitPermit requiredAny sizeNot published

Frequently asked questions

Do you need a patio permit in Broward County?
Yes, before pouring any concrete patio slab. If you are unsure how that applies to your project, call the Broward County Building Code Division at (954) 765-4400 before you start.
How much does a patio permit cost in Broward County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Broward County Building Code Division at (954) 765-4400.
Where do you apply for a patio permit in Broward County?
You can apply through the Broward County permit portal or contact the Broward County Building Code Division directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Broward County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Broward County applies this before you apply.

From the Library

Patio Permit in other Florida localities

Everything above, sourced

How this patio permit page for Broward County was verified. 2 official sources: broward.org, broward.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Broward County Building Code Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project