Patio Permit in Hernando County, Florida
It depends
Sometimes, depending on the project
Before installing a patio in unincorporated Hernando County, except sand-set pavers that are not part of a pool or spa deck
Quick answer
Hernando County's Items Not Requiring a Building Permit document exempts sand-set pavers that are not part of a pool or spa deck. The county publishes no dedicated Patio Permit page or fee line item; a poured-concrete patio slab appears to fall under the general Slab fee, and a covered or screened patio under the Porch or Screen Room fee categories. This describes unincorporated Hernando County; the City of Brooksville operates its own building department.
- Typical threshold
- Sand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by name
- Issued by
- Building Division
- Phone
- (352) 754-4050
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare patio contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What your patio permit must meet in Florida
Florida covered patios and screened patios or lanais are built under the Florida Building Code, Residential, 8th Edition (2023), which uses its own patio-cover appendix with wind load as the governing design criterion, while aluminum-frame screen enclosures are engineered under the wind-load provisions of the Florida Building Code, Building.
- Patio covers are governed by the FBC Residential patio-cover appendix; in the 8th Edition its design-loads section was revised to remove the snow-load reference, leaving wind load as the governing design criterion statewide (FBC-R Appendix H, AH105.1).
- Wind loads for screen enclosures are not calculated under the normal building wind-load method; they must be determined under Florida Building Code, Building, Section 2002.4 instead, per an express exception in Section 1609.1.1 of the current code (FBC-B 1609.1.1, 2002.4).
Based on Florida Building Code, Residential, 8th Edition (2023), Appendix H (AH105.1); Florida Building Code, Building, 8th Edition (2023), Sections 1609.1.1 and 2002.4. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a patio permit costs in Hernando County
- Fee schedule in force
- Official scheduleRead .
No dedicated Patio line item is published on the Building Division fee schedule;
a concrete patio slab appears to fall under the schedule's Slab permit ($180.00), and a covered or screened patio under Porch ($180.00) or Screen Room, New ($140.00), per Resolution No. 2026-037 (effective March 3, 2026).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Hernando County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Broward County | Permit required | Any size |
| Hernando Countythis page | It depends | Sand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by name |
| Lee County | It depends | A permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit. |
| Leon County | It depends | Patio covers, sunrooms, and screen or pool enclosures are handled as aluminum structures requiring a permit; a plain open, unroofed, at-grade patio slab is not separately addressed in any published county page found. |
| Martin County | Permit required | Any size |
| Miami-Dade County | It depends | open patio slabs, walkways and pavers outside the building do not require a building permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; slabs for screened patios and pool slabs are not covered by that exemption; patio covers need a building permit |
| Orange County | Permit required | Any size |
How to apply in Hernando County
General guide, not specific to this office
What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Building Division
- 789 Providence Boulevard, Brooksville, FL 34601
- Phone: (352) 754-4050
- Email: bldg@hernandocounty.us
Your Patio Permit checklist for Hernando County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: Sand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by name. Read the rule where we read it: hernandocounty.us: building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Hernando County permit portal.
- Keep the office details handy. Building Division. Phone: (352) 754-4050. Email: bldg@hernandocounty.us. Address: 789 Providence Boulevard, Brooksville, FL 34601.
Compiled from the official sources on this page. Last checked .
Permitting activity in Hernando County
In 2025, Hernando County authorized permits for 1,975 new residential housing units (1,734 single-family, 241 in multi-family buildings), valued at $528M, down from 2,505 the year before. That works out to about 8.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 221,701.
What else needs a permit in Hernando County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Deck: $140.00, per the Building Division fee schedule (Resolution No. 2026-037, effective March 3, 2026) |
| Electrical Permit | Permit required | Any size | Electric, Other: $165.00 |
| Fence Permit | Permit required | Fence permits are required in all commercial, industrial, and residential zoning districts; agricultural zoning districts (AG, AR, AR1, AR2, PDP(RUR)) are exempt from the Fence Ordinance | See schedule |
| HVAC Permit | It depends | A window air conditioning unit using an existing electrical outlet, and repair of existing mechanical equipment, do not require a building permit; installing a new central/ducted system or changing out equipment does | Mechanical A/C Changeout Only: $140.00 |
| Plumbing Permit | Permit required | Any size | Plumbing, Other (Res): $115.00, per Resolution No. 2026-037 (effective March 3, 2026) |
| Pool Permit | It depends | Manufactured pools less than 24 inches deep are exempt from a building permit | Swimming Pool, Above Ground: $140.00 |
| Roof Replacement Permit | Permit required | Roof repairs covering less than 100 square feet of existing roof are exempt from a building permit; this exemption does not extend to a full roof replacement | Roofing, Residential: $190.00, per Resolution No. 2026-037 (effective March 3, 2026) |
| Shed Permit | It depends | Sheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met | Or less (Non-Commercial, Site Built or 1 Piece/Pre-Fab) - Building: $140.00, per Resolution No. 2026-037 (effective March 3, 2026) |
| Solar Permit | Permit required | Any size | Photovoltaic System (Res): $180.00 |
Frequently asked questions
- Do you need a patio permit in Hernando County?
- It depends on the project. Sand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by name. If you are unsure how that applies to your project, call the Building Division at (352) 754-4050 before you start.
- How much does a patio permit cost in Hernando County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the Building Division at (352) 754-4050.
- Where do you apply for a patio permit in Hernando County?
- You can apply through the Hernando County permit portal or contact the Building Division directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Hernando County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Hernando County applies this before you apply.
From the Library
Patio Permit in other Florida localities
Everything above, sourced
How this patio permit page for Hernando County was verified. 2 official sources: hernandocounty.us, hernandocounty.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page