Florida / Hernando County

Shed Permit in Hernando County, Florida

It depends

Sometimes, depending on the project

Before installing a shed with more than 120 square feet of impervious roof coverage, or if electrical, plumbing, or a concrete slab is included, in unincorporated Hernando County

Quick answer

Under Ordinance 26-38 (approved April 7, 2026), sheds with impervious roof coverings of 120 square feet or less no longer require a Zoning permit in Hernando County, and the maximum wall height for these structures was raised from 5 feet to 8 feet. The shed must still meet zoning setbacks, stay off easements and rights-of-way, comply with floodplain rules where applicable, and not be used as a dwelling; if electrical, plumbing, or concrete is installed, a Building Division permit is still required regardless of size. This describes unincorporated Hernando County; the City of Brooksville operates its own building department.

Diagram of the 120 sq ft footprint area threshold for a shed permit in Hernando County, Florida
Threshold illustrated: 120 sq ft. Whether Hernando County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-13.
Typical threshold
Sheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met
Issued by
Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Shed size, height and setback rules in Hernando County

Setback
In the R-1A, R-1B and R-1C residential districts, an accessory building must be at least 5 feet from the side and rear lot lines, and one in a secondary front yard (the second street side of a corner lot) must meet the district's front yard requirement for the house. library.municode.com: code of ordinances
Placement
An accessory building is allowed only in the side yard, the rear yard, or the secondary front yard of a corner lot, never in the front yard. library.municode.com: code of ordinances
Size limit
In the R-1B and R-1C districts, only one detached accessory building is allowed per parcel (plus one site-built detached garage), and a detached accessory building larger than 200 square feet must meet the flood regulations and may be no more than 400 square feet. library.municode.com: code of ordinances
Setback
In the R-1B and R-1C districts, a detached accessory structure with a roof (pervious or impervious) is allowed in the side and rear yard and must be at least 5 feet from the side and rear property lines; in a secondary front yard it must meet the district's front yard requirement for the house. library.municode.com: code of ordinances
Placement
In the R-2.5 district, a detached accessory building is not allowed in the rear yard of a lot that backs onto a golf course. library.municode.com: code of ordinances

What your shed permit must meet in Florida

Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.

  • As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
  • Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
  • Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).

Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a shed permit costs in Hernando County

Fee schedule in force
Official scheduleRead .

Storage Building 200 s.f. or less (Non-Commercial, Site Built or 1 Piece/Pre-Fab) - Building: $140.00, per Resolution No. 2026-037 (effective March 3, 2026).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Hernando County compares in Florida

Across the Florida jurisdictions we have verified, the same threshold runs from 68 to 150, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
Alachua CountyIt dependsarea of a single storage shed, exemption available once per property
Brevard CountyIt dependsA permit is required for an accessory structure (shed) over 100 square feet.
Charlotte CountyIt dependsA building permit is not required for plastic or rubber manufactured type sheds 68 square feet or less in area, though they must comply with zoning setbacks and be moved and secured if there is the threat of a tropical storm.
Escambia CountyIt dependsA portable, skid-mounted utility shed under 120 square feet does not require a permit; any utility shed with a poured slab or a post installed into the earth requires a permit regardless of size.
Hernando Countythis pageIt dependsSheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met
Hillsborough CountyIt dependssheds less than 150 sq ft are exempt; sheds over 150 sq ft require a building permit; the county pages do not clearly place a shed of exactly 150 sq ft
Lake CountyIt dependsA shed built by the property owner on the owner's own personal residence, with no electrical, HVAC, fuel gas, or plumbing, is exempt from a building permit up to a 120-square-foot footprint

How to apply in Hernando County

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Building Division

Permitting activity in Hernando County

In 2025, Hernando County authorized permits for 1,975 new residential housing units (1,734 single-family, 241 in multi-family buildings), valued at $528M, down from 2,505 the year before. That works out to about 8.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 221,701.

What else needs a permit in Hernando County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeDeck: $140.00, per the Building Division fee schedule (Resolution No. 2026-037, effective March 3, 2026)
Electrical PermitPermit requiredAny sizeElectric, Other: $165.00
Fence PermitPermit requiredFence permits are required in all commercial, industrial, and residential zoning districts; agricultural zoning districts (AG, AR, AR1, AR2, PDP(RUR)) are exempt from the Fence OrdinanceSee schedule
HVAC PermitIt dependsA window air conditioning unit using an existing electrical outlet, and repair of existing mechanical equipment, do not require a building permit; installing a new central/ducted system or changing out equipment doesMechanical A/C Changeout Only: $140.00
Patio PermitIt dependsSand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by nameA concrete patio slab appears to fall under the schedule's Slab permit ($180.00); the schedule has the rest
Plumbing PermitPermit requiredAny sizePlumbing, Other (Res): $115.00, per Resolution No. 2026-037 (effective March 3, 2026)
Pool PermitIt dependsManufactured pools less than 24 inches deep are exempt from a building permitSwimming Pool, Above Ground: $140.00
Roof Replacement PermitPermit requiredRoof repairs covering less than 100 square feet of existing roof are exempt from a building permit; this exemption does not extend to a full roof replacementRoofing, Residential: $190.00, per Resolution No. 2026-037 (effective March 3, 2026)
Solar PermitPermit requiredAny sizePhotovoltaic System (Res): $180.00

Frequently asked questions

Do you need a shed permit in Hernando County?
It depends on the project. Sheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met. If you are unsure how that applies to your project, call the Building Division at (352) 754-4050 before you start.
How much does a shed permit cost in Hernando County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the Building Division at (352) 754-4050.
Where do you apply for a shed permit in Hernando County?
You can apply through the Hernando County permit portal or contact the Building Division directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Hernando County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Hernando County applies this before you apply.

From the Library

Shed Permit in other Florida localities

Everything above, sourced

How this shed permit page for Hernando County was verified. 2 official sources: hernandocounty.us, hernandocounty.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project