Florida / Collier County

Shed Permit in Collier County, Florida

Permit required

Yes, a permit is required

Before installing any shed or accessory storage structure in unincorporated Collier County

From an official source Verified Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division)

By Mario Bailey, verified against official sources

Quick answer

Collier County treats a shed as an accessory structure and requires a building permit for it, filed under the Carport/Shed (PRCP) application category with construction plans and a site plan. The county's published work-exempt-from-permit list does not include a size-based exemption for sheds; the only current permit exemption for detached single-family work is a statewide, value-based exemption that explicitly excludes structural work. This applies to unincorporated Collier County; incorporated cities operate their own building departments and may set different shed rules.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before installing any shed or accessory storage structure in unincorporated Collier County

What your shed permit must meet in Florida

Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.

  • As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
  • Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
  • Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).

Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a shed permit costs in Collier County

Line item
shed permitNot publishedCollier County publishes no fee for this permit type in a schedule we can verify. Ask Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division) how the fee is calculated for your project.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Collier County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyIt dependsarea of a single storage shed, exemption available once per property
Brevard CountyIt dependsA permit is required for an accessory structure (shed) over 100 square feet.
Broward CountyPermit requiredNot specified
Charlotte CountyIt dependsA building permit is not required for plastic or rubber manufactured type sheds 68 square feet or less in area, though they must comply with zoning setbacks and be moved and secured if there is the threat of a tropical storm.
Clay CountyPermit requiredNot specified
Collier Countythis pagePermit requiredNot specified
Hernando CountyIt dependsSheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met

How to apply in Collier County

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division) sets the exact checklist for Collier County.

Where to apply in Collier County:

Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division)

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Collier County permit portal or by phone at 239-252-2400.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Collier County?
Collier County treats a shed as an accessory structure and requires a building permit for it, filed under the Carport/Shed (PRCP) application category with construction plans and a site plan. The county's published work-exempt-from-permit list does not include a size-based exemption for sheds; the only current permit exemption for detached single-family work is a statewide, value-based exemption that explicitly excludes structural work. This applies to unincorporated Collier County; incorporated cities operate their own building departments and may set different shed rules. Always confirm with the Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division) before starting.
How much does a shed permit cost in Collier County?
Fees are set by Collier County and are not published here. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Collier County?
You can apply through the Collier County permit portal or contact the Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division) directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Collier County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Collier County applies this before you apply.

From the Library

What else needs a permit in Collier County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedNot published
Electrical PermitPermit requiredPermits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices.Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review...
Fence PermitPermit requiredNot specifiedFee Schedule (Resolution 2025-231, BCC approved October 28, 2025, effective January 1...
HVAC PermitPermit requiredThis is a self-issuing permit available on the portal, unless any of the criteria listed below apply. If they do, the permit will follow the standard permitting and plan review process: Greater than 5 tons (single family); Located on the roof of a building; Adding concrete slab; Changing size of equipment; Moving location of equipment; Any changes to duct work; Adding a new mini-split; If owner-builder; In a trailer or manufactured home; If commercial building; If multi-family building.Fee Schedule (Resolution 2025-231, effective January 1, 2026), Mechanical Permit Review...
Patio PermitIt dependsPermits shall not be required for the enclosure of an existing covered patio, balcony, or porch with screening only; a permit is required to build a new patio cover, screen enclosure, or other patio structure.Not published
Plumbing PermitPermit requiredPermits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.]Fee Schedule (Resolution 2025-231, effective January 1, 2026), Plumbing and Gas Permit...
Pool PermitPermit requiredNot specifiedFee Schedule (Resolution 2025-231, effective January 1, 2026), Section U (Pool or Spa...
Roof Replacement PermitPermit requiredCollier County's locally adopted building code amendment exempts from permit only the repair of any roof covering not exceeding $1,500.00 in value of materials and labor, or repair work not exceeding two roofing squares (200 square feet) in extent; this exemption is for roof repair, not for roof replacement/reroofing (removing and replacing the covering), which requires a standard Reroof permit.No roof-specific line item is published
Solar PermitPermit requiredNot specifiedFee Schedule (Resolution 2025-231, effective January 1, 2026), Solar Permit Review Fees:...

Shed Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Collier County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across Florida localities

Look up an existing Collier County permit record

Permit required
Get quotes