Do you need a fence permit?
By Mario Bailey Last checked
It depends entirely on where you live, and the differences are larger than most national guides admit. We read the code, ordinance, or fee schedule published by each of 148 US counties and cities and recorded what it actually says.
Where are you building?
The rule is set locally and the spread is wide, so start with your own jurisdiction. We have read the published rule in 148 of them.
The short answer
Of the 143 jurisdictions where we have confirmed the rule, 36 require a permit outright, 92 require one only in certain conditions, 15 require no permit at all.
The most common published threshold is 7 feet, used by 27 of the 68 jurisdictions that state a threshold in feet. That leaves 41 of them on a different number, which is why a national rule of thumb is not a safe answer for your own address.
5 of the 148 jurisdictions publish nothing we could verify for this permit type. We record those as unconfirmed rather than guessing.
Where no fence permit is required at all
Jefferson County, Colorado, Escambia County, Florida, Jacksonville, Florida, Santa Rosa County, Florida, Indianapolis, Indiana, Kansas City, Missouri, Nashville, Tennessee, Chesterfield County, Virginia, Fairfax County, Virginia, Fauquier County, Virginia, Loudoun County, Virginia, Orange County, Virginia, Spotsylvania County, Virginia, Stafford County, Virginia, Madison, Wisconsin.
The size thresholds, and how much they disagree
76 of the 148 jurisdictions publish a specific number. They do not all measure the same thing: 3 incompatible units are in use for fence permits (feet, inches, percent), and they cannot be averaged into a single figure.
Measured in feet (68 jurisdictions)
| Threshold | Jurisdictions | Where |
|---|---|---|
| 1 feet | 1 | Maricopa County |
| 2 feet | 1 | Rochester |
| 3 feet | 4 | Gilbert, Peoria, Phoenix, Scottsdale |
| 4 feet | 4 | Denver, Overland Park, Prince George's County, Town of Brookhaven |
| 5 feet | 1 | Chicago |
| 6 feet | 20 | Mesa, Los Angeles, Los Angeles County, Orange County, San Bernardino County, San Diego County, Lake County, Hawaii County, Honolulu, Boston, Clark County, Jersey City, Newark, New York City, Columbus, Philadelphia, Dallas, San Antonio, King County, Pierce County |
| 7 feet | 27 | Chandler, Pima County, Alameda County, Contra Costa County, Fresno County, Riverside County, Sacramento, Sacramento County, San Diego, San Jose, Santa Clara County, Aurora, Boise, Louisville, New Orleans, Howard County, Worcester, Detroit, Minneapolis, Lincoln, Portland, Austin, Corpus Christi, Fort Worth, Henrico County, Clark County, Tacoma |
| 8 feet | 9 | Polk County, DeKalb County, Gwinnett County, Wichita, Houston, Bellevue, Seattle, Snohomish County, Thurston County |
| 9 feet | 1 | Eugene |
Measured in inches (3 jurisdictions)
| Threshold | Jurisdictions | Where |
|---|---|---|
| 24 inches | 1 | Lexington |
| 42 inches | 2 | Baltimore County, El Paso |
Measured in percent (3 jurisdictions)
Measured in feet from right-of-way (1 jurisdiction)
| Threshold | Jurisdictions | Where |
|---|---|---|
| 30 feet from right-of-way | 1 | Virginia Beach |
Measured in USD (1 jurisdiction)
| Threshold | Jurisdictions | Where |
|---|---|---|
| 7500 USD | 1 | Clay County |
Thresholds are recorded as the jurisdiction states them. Which side of the number triggers the permit varies, so read your own locality's page before relying on one.
What a fence permit costs
129 of our fence permit rows carry a fee answer taken from the jurisdiction's own published schedule, across 129 localities. There is no single number to quote, and not because we did not look: jurisdictions price this permit in genuinely different ways. Some charge a flat fee, some a percentage of the job's assessed valuation, some a rate per square foot, and some do not price it at all because the work is permitted by a state agency or a utility instead. Each row below is that jurisdiction's own wording.
| Locality | Pricing model | What each fence permit schedule says | Verified |
|---|---|---|---|
| Chandler Arizona | By valuation | No fence-specific fee line, a permit is only required for retaining walls over 4 feet or fences over 7 feet per the... schedule | 6 Jul 2026 |
| Gilbert Arizona | Flat fee | Walls/Fences fee $180 as a separate single-family permit, or $120 when combined with a single-family permit (fee... schedule | 19 Jul 2026 |
| Maricopa County Arizona | By valuation | Valuation-based: fence material valued per lineal foot from $3 (barbed wire) to $18 (iron and wood) depending on... schedule | 18 Jun 2026 |
| Mesa Arizona | By valuation | No general fence fee line (the only named fence line is a $120 per-inspection Desert Uplands temporary fence permit) schedule | 17 Jun 2026 |
| Peoria Arizona | Per unit | Fence valuation for permit fees is 1.50 dollars per linear foot under 3 feet, 4 dollars per linear foot for 3 to 7... schedule | 19 Jul 2026 |
| Phoenix Arizona | By valuation | Residential fences carry a $98 minimum permit fee for project valuations of $1 to $1,000, covering up to two... schedule | 18 Jun 2026 |
| Pima County Arizona | Flat fee | Fee is $0.25 per lineal foot plus the standard $69 base permit fee, per the Development Services Fee Schedule... schedule | 6 Jul 2026 |
| Scottsdale Arizona | Per unit | Fence walls are a $237 base fee plus $0.27 per linear foot, per the FY26/27 Permit Fee Schedule - Residential (Res... schedule | 18 Jun 2026 |
| Alameda County California | By valuation | No fence line item appears in the Building Inspection Department Service Fee Schedule (Schedule A, effective July 1... schedule | 15 Aug 2026 |
| Contra Costa County California | Flat fee | Land Development Fee Schedule item 13, "Fences Greater than 7ft": Building Permit / Inspection, chain-link or wood... schedule | 15 Aug 2026 |
| Fresno County California | By valuation | The Master Schedule of Fees publishes no flat fence permit fee schedule | 15 Aug 2026 |
| Los Angeles California | Per unit | Valuation-based building permit per LAMC 91.113 Table 1-A schedule | 18 Jun 2026 |
| Los Angeles County California | By valuation | No fence line item is published schedule | 15 Aug 2026 |
| Orange County California | By valuation | Fences (over 6'): valuation-based, per the OC Development Services Fee Schedule 2024-2027 (Board of Supervisors... schedule | 15 Aug 2026 |
| Riverside County California | Flat fee | Fences Over 7' (BXX-FENC): $635.40 fixed fee, per Appendix A to Ordinance No. 457 as amended by Ordinance No. 457.108... schedule | 15 Aug 2026 |
| Sacramento California | By valuation | Valuation-based building permit per CDD-0245 (rev 07-12-2026), printed minimum $75 permit plus $32 plan review schedule | 18 Jun 2026 |
| Sacramento County California | By valuation | No fence line item is published schedule | 15 Aug 2026 |
| San Bernardino County California | Flat fee | San Bernardino County Code section 16.0204(g)(3) prices fencing as a flat fee: "Chain link, wood and/or wrought iron... schedule | 15 Aug 2026 |
| San Diego California | Flat fee | Fence or wall over 7 feet high is billed per 100 linear feet under IB-501 Table 501C effective May 2026: custom plans... schedule | 17 Jun 2026 |
| San Diego County California | Flat fee | PDS 613 Schedule of Building Construction Permit Fees (effective 07/10/2026, FY 25/26 column, PDS 613 REV.:... schedule | 15 Aug 2026 |
| Santa Clara County California | By valuation | No fence-specific permit fee is published | 15 Aug 2026 |
| Aurora Colorado | Flat fee | There is no fence line item on the 2026 flat-rate schedule (Form #A175, footer "Flat-Rate Fee (Revised 08/2026)")... schedule | 16 Aug 2026 |
| Denver Colorado | Flat fee | Zoning construction permit fee with a $10 minimum for fences valued at $500 or less schedule | 18 Jun 2026 |
| Jefferson County Colorado | Flat fee | No permit for fences in unincorporated Jefferson County schedule | 6 Jul 2026 |
| Sussex County Delaware | Per unit | Sussex County Building Permit Fee Guide: construction value (table rates such as $128.10/sq ft residential, $52.23/sq... schedule | 3 Oct 2026 |
| Alachua County Florida | By valuation | No fence-specific flat fee is published schedule | 13 Aug 2026 |
| Brevard County Florida | Flat fee | Brevard's Residential Fence Permit Application fee table lists a $25.00 Application Processing Fee, a $34.00 flat... | 8 Aug 2026 |
| Broward County Florida | By valuation | No separate fence fee line | 18 Jun 2026 |
| Charlotte County Florida | By valuation | Charlotte County's Residential Fence page lists fees due at issuance: Zoning Review $30, plus a building fee of 0.004... | 8 Aug 2026 |
| Clay County Florida | By valuation | The FY 2024/2025 Building Fee Schedule (Resolution No. 2023/2024-97, adopted September 24, 2024, effective October 1... schedule | 13 Aug 2026 |
| Collier County Florida | Flat fee | Fee Schedule (Resolution 2025-231, BCC approved October 28, 2025, effective January 1, 2026), Section V... schedule | 8 Aug 2026 |
| Escambia County Florida | Flat fee | The separate Land Use Certificate for Fence Installation form (Development Services Department, revised 10/2021) lists... | 13 Aug 2026 |
| Hernando County Florida | Flat fee | No separate flat fee for the Zoning Fence Permit itself is published on the Building Division fee schedule schedule | 13 Aug 2026 |
| Hillsborough County Florida | By valuation | No fence line item in the fee schedule schedule | 18 Jun 2026 |
| Lake County Florida | Flat fee | Residential Walls and Fences (includes gates & seawalls schedule | 13 Aug 2026 |
| Lee County Florida | Flat fee | Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational... schedule | 19 Jul 2026 |
| Leon County Florida | By valuation | The Fee Schedule (Development Support & Environmental Management Department Fee Schedule, revised June 1, 2022 schedule | 13 Aug 2026 |
| Manatee County Florida | Flat fee | Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Fence... schedule | 8 Aug 2026 |
| Marion County Florida | Flat fee | Fence/Wall/Entrance-way (Res or Com): $125.00, per the county's construction permit fee schedule (Resolution 25-R-295... schedule | 8 Aug 2026 |
| Miami-Dade County Florida | By valuation | Fence type determines permit type: wood and masonry fences require a Building Permit (Category 18) schedule | 18 Jun 2026 |
| Orange County Florida | Flat fee | Residential Fence Permit fee is $38 flat per the FY2025-26 Fee Directory's Zoning Permit Fees table schedule | 18 Jun 2026 |
| Osceola County Florida | Flat fee | Appendix A lists 'Fences (Wood, Chain Link or Vinyl/Plastic)' at $60.00, with no plan review fee required schedule | 13 Aug 2026 |
| Palm Beach County Florida | Flat fee | Flat $125 fee for a residential fence permit, per the PZB Building Division fee schedule schedule | 6 Jul 2026 |
| Pasco County Florida | Flat fee | Base permit fee $45 for all permits per posted fee Resolution 18-17 schedule | 19 Jul 2026 |
| Pinellas County Florida | Flat fee | Fences of chain link, vinyl or wood 6 feet or less need no building permit schedule | 6 Jul 2026 |
| Polk County Florida | Per unit | Building permit fee by valuation per Construction Fees Resolution 17-025 schedule | 19 Jul 2026 |
| Seminole County Florida | By valuation | Fences: $40.00 base permit fee plus $5.00 per $1,000 value of construction schedule | 13 Aug 2026 |
| St. Johns County Florida | By valuation | No fence-specific fee line item is published schedule | 13 Aug 2026 |
| Cobb County Georgia | By valuation | Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or... schedule | 6 Jul 2026 |
| DeKalb County Georgia | Flat fee | Building Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum Permit Fee | 16 Aug 2026 |
| Gwinnett County Georgia | By valuation | Planning and Development Fee Schedule, "Building Permit Fees (Effective July 1, 2024)", footer "Revised 05/23/2024" schedule | 16 Aug 2026 |
| Hawaii County Hawaii | By valuation | Hawaiสปi County Code section 5-7-3(b), "PERMIT FEES" table (Chapter 5 Construction Administrative Code, 2020, ord... schedule | 3 Oct 2026 |
| Honolulu Hawaii | By valuation | No fence line item is published schedule | 3 Oct 2026 |
| Boise Idaho | By valuation | Building permit fee from Table No. 1-A by valuation (e.g schedule | 3 Oct 2026 |
| Chicago Illinois | Flat fee | Flat $150 for a nonmasonry fence up to 6 ft high per Table 14A-12-1204.2 schedule | 17 Jun 2026 |
| Cook County Illinois | Flat fee | Cook County Code of Ordinances Sec. 32-1, Building Permit Fee Schedule, item 10-B FENCES: "Minimum Fee 100.00 Plus... schedule | 15 Aug 2026 |
| Fort Wayne Indiana | Flat fee | Allen County and Fort Wayne Department of Planning Services Fee Schedule, effective January 1, 2026, under FEN: Fence:... schedule | 15 Aug 2026 |
| Indianapolis Indiana | By valuation | No permit and therefore no permit fee is published for a residential fence schedule | 15 Aug 2026 |
| Overland Park Kansas | By valuation | The fence handout says "a permit fee will be charged based on the estimated cost of the fence construction" schedule | 3 Oct 2026 |
| Lexington Kentucky | Flat fee | LFUCG Division of Building Inspection Schedule of Fees, EFFECTIVE JULY 1, 2019 (document revised 10/27/21) schedule | 3 Oct 2026 |
| Louisville Kentucky | By valuation | LMCO 150.096 promulgated fees (revised 2/6/2024): partial alterations and structures other than buildings are $50 plus... schedule | 3 Oct 2026 |
| Baton Rouge Louisiana | Flat fee | Permit & Inspection Fees page: "Residential Fence $250.00", plus "Technology Fee $25.00" charged on all permits schedule | 16 Aug 2026 |
| New Orleans Louisiana | By valuation | Building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005 + $60) schedule | 16 Aug 2026 |
| Baltimore County Maryland | Flat fee | Building Permit Fee Schedule effective 07/01/26 lists Fences, Residential: $35.00 + $0.05 / linear ft, Over 250 linear... schedule | 16 Aug 2026 |
| Howard County Maryland | Flat fee | $50 $50 per structure for fences over 7 feet high or enclosing a pool (Miscellaneous Structures Accessory permit, FY2027... schedule | 6 Jul 2026 |
| Montgomery County Maryland | Flat fee | $89.54 $89.54 flat Fence Permit fee per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01 schedule | 18 Jun 2026 |
| Prince George's County Maryland | Flat fee | DPIE Fee Schedule, effective March 2, 2025, line item "Fence - Residential", minimum permit fee $145: "Total Fee =... schedule | 16 Aug 2026 |
| Worcester Massachusetts | By valuation | The Schedule of Fees has no fence line item schedule | 15 Aug 2026 |
| Ann Arbor Michigan | By valuation | The Planning Services Fence Guidelines handout (revised 3/3/2025) states a flat Fence Permit Fee of $75.00 schedule | 15 Aug 2026 |
| Detroit Michigan | Flat fee | Fence work is priced as a building permit on project cost under the BSEED Fee Schedule effective January 1, 2024... schedule | 15 Aug 2026 |
| Grand Rapids Michigan | By valuation | FY 2027 Planning, Design and Development Fee Schedule, Planning Fees effective July 1, 2026, ZONING PERMITS: "Level I... schedule | 15 Aug 2026 |
| Sterling Heights Michigan | Flat fee | Fence Permit Application 2026-2027 (revised 8/12/2026) fee box: WOOD $46, METAL $46, WIRE $46, PVC $46, MASONRY $134... schedule | 15 Aug 2026 |
| Minneapolis Minnesota | Not priced | No fee for fences 7 feet or under since no permit is required schedule | 18 Jun 2026 |
| Saint Paul Minnesota | Flat fee | Saint Paul Legislative Code Sec. 33.04(g)(17), line item "Fences permit/plan review": "Forty-five dollars ($45.00) for... schedule | 15 Aug 2026 |
| Kansas City Missouri | By valuation | There is no fence permit and no fence permit fee schedule | 16 Aug 2026 |
| St. Louis Missouri | By valuation | A fence is permitted as a Miscellaneous Structures Permit under Section 109.2.3 of the City Building Code schedule | 16 Aug 2026 |
| Omaha Nebraska | By valuation | Valuation-based building permit fee, Omaha Municipal Code Sec. 43-91, Table 43-91: $1.00 to $2,000.00 total valuation... schedule | 3 Oct 2026 |
| Clark County Nevada | By valuation | Type A fencing 6 feet or under that is not a pool barrier needs no permit schedule | 18 Jun 2026 |
| Henderson Nevada | Flat fee | $294 $294 for the first 100 linear feet of a non-masonry fence or freestanding wall of any height plus $18 per additional... schedule | 6 Jul 2026 |
| Newark New Jersey | By valuation | Newark's building subcode fee schedule (municipal code Chapter 7:2-3.1, Ord. 6 S+FD adopted 9-5-2007, code current... schedule | 15 Aug 2026 |
| Buffalo New York | Flat fee | Residential building permit fee schedule flat fee line "Fence requiring a permit (over height, etc.)" $25.00, on top... schedule | 15 Aug 2026 |
| New York City New York | By valuation | No DOB filing fee where the fence is exempt schedule | 15 Aug 2026 |
| Rochester New York | By valuation | The Fences (Residential and Village Center Districts) packet dated Mar 2026 states "Fee-$50.00" payable to the City... schedule | 15 Aug 2026 |
| Town of Brookhaven New York | By valuation | Brookhaven publishes no Building Division fee schedule | 15 Aug 2026 |
| Town of Hempstead New York | By valuation | Charged as a building permit under Town Code 86-11C(1) as amended by Local Law No. 20-2024 (adopted 3-12-2024... schedule | 15 Aug 2026 |
| Charlotte North Carolina | Flat fee | The Charlotte Department of Transportation fence and wall certificate is free: the city's Fence and Wall Certificates... schedule | 15 Aug 2026 |
| Cincinnati Ohio | By valuation | Fee Schedule effective July 1, 2026 lists "Zoning Certificate of Compliance" and "Certificate of Appropriateness" at... schedule | 16 Aug 2026 |
| Cleveland Ohio | Flat fee | General Fee Schedule effective January 2, 2014, item C(2) "Fences, guardrails, or barriers for 1, 2 and 3 family... schedule | 15 Aug 2026 |
| Columbus Ohio | Flat fee | Flat $300 fee with 2 inspections, applying only to fences over 6 feet since shorter fences need no building permit... schedule | 18 Jun 2026 |
| Franklin County Ohio | Flat fee | Franklin County Economic Development and Planning Department Fee Schedule, 'Effective Jan schedule | 16 Aug 2026 |
| Oklahoma City Oklahoma | By valuation | Oklahoma City Municipal Code Chapter 60, General Schedule of Fees, Section 60-19-6 Fence permits: "permit, each .....$... schedule | 16 Aug 2026 |
| Tulsa Oklahoma | By valuation | Residential zoning clearance permit fee is $75.50 under Tulsa Revised Ordinances Title 49, Chapter 3, Section 303.G... schedule | 16 Aug 2026 |
| Eugene Oregon | By valuation | The Construction Permit Fees schedule effective July 1, 2026 (Exhibit A to Administrative Order No. 53-26-01-F) has no... schedule | 16 Aug 2026 |
| Portland Oregon | By valuation | Building and Other Permits Fee Schedule for the City of Portland, effective July 10, 2026: Building Permit Fee is... schedule | 16 Aug 2026 |
| Philadelphia Pennsylvania | Flat fee | Zoning permit $50-$632 by lot size schedule | 18 Jun 2026 |
| Pittsburgh Pennsylvania | By valuation | A fence reviewed by Zoning only pays the Department of City Planning fee, "Residential Zoning Review $1.00/$1000 of... schedule | 15 Aug 2026 |
| Charleston South Carolina | By valuation | No fence line item exists schedule | 16 Aug 2026 |
| Columbia South Carolina | By valuation | Unified Development Ordinance Fee Schedule (Rev schedule | 16 Aug 2026 |
| Memphis Tennessee | Per unit | RESIDENTIAL FENCE PERMIT 400 LINEAR FT OR LESS $25.00 and RESIDENTIAL FENCE PERMIT 401 LINEAR FT OR MORE at $0.07 per... schedule | 16 Aug 2026 |
| Nashville Tennessee | By valuation | No permit fee schedule | 18 Jun 2026 |
| Williamson County Tennessee | Not priced | No fence-specific line schedule | 6 Jul 2026 |
| Arlington Texas | Flat fee | Planning and Development Services Fee Schedule, Effective June 1, 2026, Resolution No. 26 - 151, Residential... schedule | 15 Aug 2026 |
| Austin Texas | Flat fee | Fences are named directly in the Small Projects Plan Review fee of $132.86, per the FY2025-26 DSD residential fee... schedule | 18 Jun 2026 |
| Corpus Christi Texas | Per unit | The FY 2026 Development Fee Schedule (Rev schedule | 15 Aug 2026 |
| Dallas Texas | By valuation | No fence-specific line schedule | 18 Jun 2026 |
| El Paso Texas | Flat fee | FY 2026 Schedule C Departmental Fee List, Planning & Inspections, Building Permits: "building /fences" is "$110 plus... schedule | 15 Aug 2026 |
| Fort Worth Texas | By valuation | The Development Fee Schedule publishes no residential fence line item schedule | 15 Aug 2026 |
| Houston Texas | Flat fee | Fences cost $73.85 for the first 100 lineal feet plus $11.41 per additional 100 lineal feet, plus the $33.56... schedule | 18 Jun 2026 |
| Lubbock Texas | Flat fee | Building Safety Fee Schedule, fiscal year effective dates October 1, 2025 to September 30, 2026, under Other Building... schedule | 15 Aug 2026 |
| Plano Texas | Flat fee | Building Inspections Fee Schedule effective Jan schedule | 15 Aug 2026 |
| San Antonio Texas | Flat fee | Flat $25 residential fence permit fee, per the FY2026 Development Fee Schedule schedule | 18 Jun 2026 |
| Arlington County Virginia | By valuation | Fees per FY27 Planning and Zoning fee schedule schedule | 19 Jul 2026 |
| Chesterfield County Virginia | Flat fee | No permit or fee for a standard residential fence schedule | 6 Jul 2026 |
| Fauquier County Virginia | Flat fee | Fences need no building permit but placing one still needs a Zoning Permit priced flat at $110 including the... schedule | 18 Jun 2026 |
| Henrico County Virginia | By valuation | Fences up to 7 feet that are not a pool barrier need no permit schedule | 6 Jul 2026 |
| Loudoun County Virginia | Not priced | Typical residential fences are exempt from the Zoning Permit requirement so no fee applies schedule | 6 Jul 2026 |
| Orange County Virginia | Flat fee | Flat $75 fee under the residential accessory structures fence and retaining wall line, plus Virginia's 2% state... schedule | 6 Jul 2026 |
| Prince William County Virginia | By valuation | No building permit or BDD fee unless the fence is required for pedestrian safety or as a swimming pool barrier schedule | 18 Jun 2026 |
| Virginia Beach Virginia | Flat fee | $61 $61 fence permit fee (city Fence and Wall Bulletin, rev Nov-2025) | 19 Jul 2026 |
| Bellevue Washington | By valuation | No separate fence line item schedule | 18 Jun 2026 |
| Clark County Washington | By valuation | Fees are established by county ordinance and calculated automatically during the application process schedule | 19 Jul 2026 |
| King County Washington | Flat fee | Most permit fees increased approximately 14% on January 1 2026 plus a $126 application screening fee schedule | 18 Jun 2026 |
| Pierce County Washington | By valuation | Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construction valued at $500 or less... schedule | 6 Jul 2026 |
| Seattle Washington | By valuation | Fences 8 feet or less with no masonry or concrete elements over 6 feet need no permit per SDCI's Fences page schedule | 18 Jun 2026 |
| Snohomish County Washington | By valuation | Base application fee $150 per application plus 3% technology surcharge and $6.50 Washington State building permit... schedule | 6 Jul 2026 |
| Tacoma Washington | By valuation | Only fences over 7 feet or masonry walls over 4 feet need a building permit, priced from $55 for the first $500 of... schedule | 18 Jun 2026 |
| Thurston County Washington | By valuation | Building permit and plan review fees are valuation based schedule | 19 Jul 2026 |
| Madison Wisconsin | By valuation | No fence permit is issued, so there is no permit fee schedule | 16 Aug 2026 |
| Milwaukee Wisconsin | By valuation | The Plan Review and Permit Fees schedule (As of January 1, 2025 schedule | 16 Aug 2026 |
129 rows, every one taken from the jurisdiction's published schedule for fence permits and linked to its page. Every fence permit row also sits inside the cross-type study at what building permits cost.
Cite this data
PermitNotebook (2026). Fence Permit fees and requirements in 129 US localities, verified against published fee schedules. https://permitnotebook.com/permits/fence/
Fence Permit rules by state
33 states, 148 counties and cities. Pick your state for the locality-by-locality comparison, or go straight to your county.
| State | Localities | Required | Conditional | Not required | Thresholds published |
|---|---|---|---|---|---|
| Florida | 28 | 14 | 11 | 3 | 6 feet, 7500 USD, 8 feet |
| California uniform | 14 | 0 | 14 | 0 | 6 feet, 7 feet |
| Virginia | 12 | 2 | 3 | 7 | 30 feet from right-of-way, 7 feet |
| Texas uniform | 10 | 0 | 10 | 0 | 25 percent, 42 inches, 50 percent, 6 feet, 7 feet, 8 feet |
| Arizona uniform | 8 | 0 | 8 | 0 | 1 feet, 3 feet, 6 feet, 7 feet |
| Washington uniform | 8 | 0 | 8 | 0 | 6 feet, 7 feet, 8 feet |
| New York | 5 | 1 | 4 | 0 | 2 feet, 4 feet, 6 feet |
| Georgia | 4 | 1 | 2 | 0 | 8 feet |
| Maryland | 4 | 1 | 3 | 0 | 4 feet, 42 inches, 7 feet |
| Michigan | 4 | 3 | 1 | 0 | 7 feet |
| North Carolina | 4 | 0 | 2 | 0 | None published |
| Ohio | 4 | 2 | 2 | 0 | 50 percent, 6 feet |
| Colorado | 3 | 0 | 2 | 1 | 4 feet, 7 feet |
| Tennessee | 3 | 1 | 0 | 1 | None published |
| Delaware | 2 | 1 | 1 | 0 | None published |
| Hawaii uniform | 2 | 0 | 2 | 0 | 6 feet |
| Illinois | 2 | 1 | 1 | 0 | 5 feet |
| Indiana | 2 | 0 | 1 | 1 | None published |
| Kansas uniform | 2 | 0 | 2 | 0 | 4 feet, 8 feet |
| Kentucky uniform | 2 | 0 | 2 | 0 | 24 inches, 7 feet |
| Louisiana | 2 | 1 | 1 | 0 | 7 feet |
| Massachusetts uniform | 2 | 0 | 2 | 0 | 6 feet, 7 feet |
| Minnesota | 2 | 1 | 1 | 0 | 7 feet |
| Missouri | 2 | 0 | 1 | 1 | None published |
| Nebraska | 2 | 1 | 1 | 0 | 7 feet |
| Nevada | 2 | 0 | 1 | 0 | 6 feet |
| New Jersey uniform | 2 | 0 | 2 | 0 | 6 feet |
| Oklahoma uniform | 2 | 2 | 0 | 0 | None published |
| Oregon uniform | 2 | 0 | 2 | 0 | 7 feet, 9 feet |
| Pennsylvania | 2 | 1 | 1 | 0 | 6 feet |
| South Carolina uniform | 2 | 2 | 0 | 0 | None published |
| Wisconsin | 2 | 1 | 0 | 1 | None published |
| Idaho | 1 | 0 | 1 | 0 | 7 feet |
A state marked uniform applies the same verdict in every locality we checked there, usually because a statewide code forbids local divergence.
How fence permits work, start to finish
Applying
Most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own.
- A fence 7 feet or under is exempt from the model code's building permit, the same threshold the IRC uses for other small projects (IRC 2021 R105.2).
- That exemption only removes the building-code permit. It does not authorize skipping a jurisdiction's own zoning approval, which is why an exempt fence can still need its own land-use or zoning permit rather than a building permit (IRC 2021 R105.2).
- Whatever your jurisdiction calls that approval, the application centers on a basic site plan: a drawing of the property showing the fence's location, height, and material, and how it relates to the property lines (common local zoning practice).
- The same plan is checked against required setbacks and, on corner lots or near intersections, a sight-triangle rule that caps fence height so it does not block sightlines for drivers (common local zoning practice).
- A fence that will serve as a required swimming-pool barrier is handled as life-safety work rather than the light zoning process, and at least one state's adopted residential code requires a building permit for barrier fences regardless of the general fence exemption (Oregon Residential Specialty Code 2021, R101.2.2).
Inspections and close-out
Inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.
- Inspection duty attaches only to work for which a permit is required, so a fence that qualified for the permit exemption carries no inspection obligation under the model code (IRC 2021 R109.1).
- Where a fence permit was issued, the process skips the staged foundation, frame, and rough-in inspections used for buildings and goes straight to one final inspection once the fence is finished (IRC 2021 R109.1.6).
- That single check is typically a zoning compliance inspection rather than a structural review, confirming the fence matches the approved height and site plan (common local practice).
- A fence built as a swimming-pool barrier breaks that light-touch pattern: it is separately inspected for barrier compliance, commonly required before the pool itself can be signed off (ISPSC 305; local pool-barrier inspection programs).
- That barrier inspection checks dimensional rules from the swimming pool and spa code rather than ordinary fence rules, including the minimum 48 inch barrier height and limits on openings and gaps a young child could pass through (ISPSC 305).
- Gate hardware is inspected too: a self-closing, self-latching gate is part of the barrier requirement, since an unlatched gate defeats the fence's purpose as a barrier (ISPSC 305).
General practice; your locality's page carries its own process, fees, and portal. Sources: International Residential Code (IRC), 2021 edition, Section R105.2, International Residential Code (IRC), 2021 edition, Section R109, and ISPSC 2021 Section 305 (barriers).
Common questions about fence permits
- Do I need a fence permit?
- For fence work it depends on the size of the job and where you are. A fence permit is issued by your city or county rather than the state, so the rule is local. Across the 148 jurisdictions where we have read the fence rule, 36 require a permit outright, 92 require one only in certain conditions, 15 require no permit at all.
- Is there a fence permit exemption?
- In 92 of the 148 jurisdictions we cover, a fence permit is not needed below a published threshold, and that threshold differs from one office to the next. The size thresholds section above lists each jurisdiction's own fence figure with its source, and the same fence job can be exempt in one county and permitted in the next.
Find the fence permit rule where you live
Look up your locality
Hire it out
Sponsored
Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.