North Carolina / Charlotte

Fence Permit in Charlotte, North Carolina

It depends

Sometimes, depending on the project

Before building a fence or wall along the border of, or bounding on, a city street or sidewalk. A fence entirely within a back or side yard on private property needs no city certificate.

Quick answer

Building permits inside Charlotte come from the county, not the city: Mecklenburg County Code Enforcement issues the building, electrical, mechanical and plumbing permits for Charlotte and for the towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill and Pineville under a single consolidated county-wide code authority, while the City of Charlotte keeps zoning and administers the Unified Development Ordinance. A fence shows that split at its cleanest. The county issues no building permit for a fence, and Charlotte requires only a no-cost Fence and Wall Certificate from the Charlotte Department of Transportation, and only where the fence or wall is built along a city street or sidewalk rather than entirely inside a back or side yard. Unified Development Ordinance Section 17.2.D still caps residential fence height at five feet in the established front setback, six feet in the side setback and eight feet in the rear setback whether or not a certificate is needed.

Issued by
Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center.
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in Charlotte

Fee schedule in force
Official scheduleRead .
  • The Charlotte Department of Transportation fence and wall certificate is free: the city's Fence and Wall Certificates page calls it 'a no-cost certificate from the Charlotte Department of Transportation in lieu of a permit.'
  • Mecklenburg County charges nothing because it issues no building permit for a fence.
  • If a fence has to be carried on a City of Charlotte zoning use permit, the FY25 Residential Zoning Fee Schedule, effective for projects submitted July 1, 2024 to June 30, 2025, prices a Zoning Use Permit at $330 and a Residential Single-Family Review at $70.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Charlotte compares in North Carolina

JurisdictionPermit needed?Threshold
Charlottethis pageIt dependsBefore building a fence or wall along the border of, or bounding on, a city street or...
DurhamIt dependsOnly when the fence or wall is on a property in a designated flood plain, is used as a...
Mecklenburg CountyIt dependsthe county does not name fences; its general rule is that permits may not be required for residential projects with work costing $40,000 or less unless the work involves load bearing structures or the other items it lists
RaleighIt dependsshare of an existing residential fence being replaced with no change of material, height or location

How to apply in Charlotte

General guide, not specific to this office

What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center.

  • Mecklenburg County Code Enforcement, LUESA Business Office, 2145 Suttle Ave., Charlotte, NC 28208, open Monday to Friday 8 a.m. to 5 p.m. City of Charlotte zoning permitting and the CLT Development Center are at the Charlotte Mecklenburg Government Center, 600 East Fourth Street, Charlotte, NC 28202.
  • Phone: 980-314-2633
  • Email: Code@MeckNC.gov

What else needs a permit in Charlotte

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsAny time permanent wiring, devices or equipment in or attached to the house or an...See schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitPermit requiredAny sizeSee schedule
Plumbing PermitIt dependsBefore adding to or changing the design of the plumbing system, moving or adding...See schedule
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependsBefore a reroof that changes the material type, adds roofing rather than replacing it...See schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a fence permit in Charlotte?
Sometimes: before building a fence or wall along the border of, or bounding on, a city street or sidewalk. A fence entirely within a back or side yard on private property needs no city certificate. If you are unsure how that applies to your project, call the permit office at 980-314-2633 before you start.
How much does a fence permit cost in Charlotte?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 980-314-2633.
Where do you apply for a fence permit in Charlotte?
You can apply through the Charlotte permit portal or contact the Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center. directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in Charlotte?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Charlotte applies this before you apply.

From the Library

Fence Permit in other North Carolina localities

Everything above, sourced

How this fence permit page for Charlotte was verified. 2 official sources: code.mecknc.gov, charlottenc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project