North Carolina / Greensboro

Fence Permit in Greensboro, North Carolina

Not confirmed

We could not confirm this

Quick answer

Permits inside Greensboro come from the City, not from Guilford County. The City of Greensboro Engineering and Inspections Department's Development Services Division issues the building, electrical, mechanical and plumbing permits for work inside the city limits, and Guilford County lists the City of Greensboro among the jurisdictions its own Planning and Development Department does not serve, so the Charlotte pattern of county-issued city permits does not repeat here. On fences specifically Greensboro publishes no permit answer. The Land Development Ordinance regulates fences in detail at 30-9-4, but the Residential Construction page, the Building Permits FAQs, the Permits, Fees and Procedures list of applications and the Planning Department fee schedule all go by without mentioning a fence permit or a fence fee, and the one source that could not be read at all was the separate Code of Ordinances on Municode. Call Development Services at 336-373-2155 rather than assuming a fence is exempt.

Issued by
City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections)
Not confirmed Checked

Applying yourself? Start with the office.

What a fence permit costs in Greensboro

Permit fee
Not published
Fee schedule in force
Official scheduleRead .

Greensboro publishes no fee for this permit type in a schedule we can verify. Ask City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections) how the fee is calculated for your project.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Greensboro compares in North Carolina

JurisdictionPermit needed?Threshold
CharlotteIt dependsBefore building a fence or wall along the border of, or bounding on, a city street or...
DurhamIt dependsOnly when the fence or wall is on a property in a designated flood plain, is used as a...
Greensborothis pageNot confirmedNot confirmed
Mecklenburg CountyIt dependsthe county does not name fences; its general rule is that permits may not be required for residential projects with work costing $40,000 or less unless the work involves load bearing structures or the other items it lists
RaleighIt dependsshare of an existing residential fence being replaced with no change of material, height or location

Where to ask in Greensboro

We could not confirm the rule, so start with the office's own pages or call the number below.

City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections)

  • Development Services, Melvin Municipal Office Building, Upper Ground Level, Room UG10, 300 W. Washington St., Greensboro, NC 27401
  • Phone: 336-373-2155
  • Email: DevelopmentServices2@greensboro-nc.gov

Permitting activity in Greensboro

In 2025, Greensboro authorized permits for 1,972 new residential housing units (906 single-family, 1,066 in multi-family buildings), valued at $411M, up from 1,954 the year before. That works out to about 6.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,878.

What else needs a permit in Greensboro

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsBefore building a new deck or porch, and before any work on an existing deck beyond...Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Electrical PermitIt dependsBefore adding, replacing or redesigning electrical wiring, devices, appliances or...Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00'
HVAC PermitPermit requiredAny sizeMechanical Permit Fee Schedule, Document #4200 dated 7/16/24: 'Minimum Inspection Fee $ 85.00'
Patio PermitIt dependsBefore building an elevated patio that needs retaining walls or foundation walls, and...Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Plumbing PermitIt dependsBefore adding to or altering the drainage, waste, vent, water service or water...Plumbing Permit Fee Schedule, Document #4300 dated 7/16/24: 'Minimum Permit/Inspection Fee $ 85.00'
Pool PermitPermit requiredAny sizeIts value table starts at $85.00 in the residential Alt/Add column and $86.25 in the new construction column for a $1,000 value; the schedule has the rest
Roof Replacement PermitIt dependscost of the construction, installation, repair, replacement or alterationBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Shed PermitIt dependslength, width or height of the accessory buildingIt lists 'Residential - New Homes and Detached Garages' with new construction, whose column starts at $86.25 for a $1,000 value; the schedule has the rest
Solar PermitPermit requiredAny sizeBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'

Frequently asked questions

Do you need a fence permit in Greensboro?
We could not confirm the fence permit rule on an official Greensboro page, so this page gives no yes or no. Call the permit office at 336-373-2155 before you start.
How much does a fence permit cost in Greensboro?
We found no published fee for a fence permit in Greensboro. To learn how it is calculated for your project, call the permit office at 336-373-2155.
Where do you apply for a fence permit in Greensboro?
You can apply through the Greensboro permit portal or contact the City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections) directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in Greensboro?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Greensboro applies this before you apply.

From the Library

Fence Permit in other North Carolina localities

Everything above, sourced

What was checked for this fence permit page for Greensboro. The rule itself is not confirmed. 1 official source: greensboro-nc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Not confirmed
Check my project