Only a Few Project Types Have Any Permit Exemption at All

Of the residential permit types we track, only a few have any place that requires no permit at all, and sheds, decks and pools have none. Here is what the exemptions actually cover and where they apply.

By PermitNotebook Research Published Last checked 6 official sources

“What can I build without a permit” is the most reasonable question a homeowner can ask and the one the internet answers worst. The standard answer is a list copied from the International Residential Code: a shed under 200 square feet, a deck under 30 inches, a fence under 7 feet. Those numbers are real. They are also not binding anywhere until a local jurisdiction adopts them, and we have now read the adopted rule in 169 jurisdictions across 41 states.

The short version is that the exemption you are hoping for is rarer than the list suggests, and it almost never means what “no permit” sounds like.

Only a few project types have any unconditional exemption

We track 13 residential permit types. Across all 169 jurisdictions, only 31 rows in the entire dataset record a flat “no permit required,” and they fall into just 3 types:

  • Fence permits: 15 jurisdictions
  • Patio permits: 9 jurisdictions
  • Roof replacement permits: 7 jurisdictions

For the other 10 types, including the ones people ask about most, there is no jurisdiction in our coverage where the answer is an unconditional no:

  • Sheds: 38 jurisdictions require a permit outright, 129 make it conditional, 2 we could not resolve. None exempt a shed entirely.
  • Decks: 86 outright, 81 conditional, 2 unresolved. None exempt a deck entirely.
  • Pools: 66 outright, 102 conditional, 1 unresolved. None exempt a pool entirely.
  • Solar: 159 of 169 require a permit outright.

So if you are searching for permission to skip the permit on a shed, a deck or a pool, the honest answer from our official sources is that no jurisdiction we have read gives it to you. What they give you instead is a threshold.

“Conditional” is the real answer, and it is a number

The 129 conditional shed verdicts are not vagueness. They mean the jurisdiction publishes a size below which no building permit is needed, and the spread is the finding.

The range runs from 25 sq ft in Wichita, Kansas to600 sq ft in Santa Rosa County, Florida.

The most common value is 200 square feet, used by 51 jurisdictions, which is where the internet’s answer comes from. But 200 is a plurality, not a majority: 75 of the jurisdictions publishing a shed area use something else. The second most common value is 120 square feet, used by 34. If you assume 200 and you are in one of those 34, a shed between 120 and 200 square feet needs a permit you did not pull. The full breakdown is on do you need a permit to build a shed.

Decks are harder, because the stored number is rarely the whole rule. 80 of the 169 deck rules state a height condition and 47 state an area condition, and 55 raise attachment to the dwelling, which under the model code ends the exemption on its own regardless of size or height. Fort Worth, Texas triggers at 6 inches above grade, the lowest we have found. We treat the deck exemption at length in the deck permit exemption is a four part test.

Where the exemptions actually are

The 15 fence exemptions cluster heavily in one state. 7 of them are in Virginia: Chesterfield County, Fairfax County, Fauquier County, Loudoun County, Orange County, Spotsylvania County, Stafford County. That is not a coincidence. Virginia’s Uniform Statewide Building Code exempts fences from the building permit unless the fence is a pool barrier, and it governs every jurisdiction in the state. The other 8 are Jefferson County, Colorado, Escambia County, Florida, Jacksonville, Florida, Santa Rosa County, Florida, Indianapolis, Indiana, Kansas City, Missouri, Nashville, Tennessee and Madison, Wisconsin.

Patios are the next most exempted type. The 9 patio exemptions are Louisville, Kentucky, Howard County, Maryland, Montgomery County, Maryland, Columbus, Ohio, Fairfax County, Virginia, Bellevue, Washington, Seattle, Washington, Madison, Wisconsin and Milwaukee, Wisconsin. Patios sit at grade and carry no structural or life-safety load, which is why they are waved through more often. They are still permit-triggering in 33 jurisdictions outright and conditional in 90, usually the moment the patio gets a roof, a footing, or a grade change that affects drainage.

Roof replacement is the most surprising. 7 jurisdictions require no permit for a re-roof: Little Rock, Arkansas, Montgomery County, Maryland, Jersey City, New Jersey, Nashville, Tennessee, Williamson County, Tennessee, King County, Washington and Seattle, Washington. See do you need a permit to replace a roof.

The conditions that quietly reinstate the permit

Where a jurisdiction says “conditional,” the condition is usually one of four things, and each one catches projects people assume are exempt.

A dollar threshold. Roofing triggers on work value in several places: $500 in Sarasota County, Florida and Dallas, Texas; $1,500 in Collier County, Florida; $7,500 in Broward County, Florida, Lee County, Florida, Miami-Dade County, Florida and 5 more; $10,000 in Anchorage, Alaska; $40,000 in Durham, North Carolina, Greensboro, North Carolina, Mecklenburg County, North Carolina and 1 more. The same re-roof can be exempt in one county and permit-triggering in another purely on price.

A percentage of the existing structure. 14 jurisdictions gate roofing on how much of the roof or its sheathing you touch. 25 percent is the most common, used by 9. The full spread runs from 10 percent to 50 percent.

A layer count. Chandler, Arizona, Cincinnati, Ohio and Snohomish County, Washington gate on roofing layers.

Whether the work is like-for-like. This is the most common unwritten condition across many types. A replacement that changes nothing about size, location, or load frequently escapes a permit, while the same component in a new location does not.

What this means before you start

Three practical conclusions follow from the counts above.

First, treat any national number as a hypothesis about your jurisdiction, not an answer. 200 square feet is the shed rule in 51 places we have read and a different number in 75.

Second, if your project is a shed, a deck, or a pool, stop looking for the exemption from every permit. It does not exist anywhere in our coverage. Look for your jurisdiction’s threshold instead, and check which unit it is written in, because decks alone are governed by inches in some places and square feet in others.

Third, the exemptions that do exist are narrow and local, and 8 of the 31 sit in Virginia because of one state code rather than separate local decisions. Knowing which level of government wrote your rule tells you where to go read it.

You can look up the verified rule for your own jurisdiction on the relevant permit page, or start from the permit type index if you want to see how a single project type varies nationally. Every figure in this piece is computed when the site is built from the same verified rows those pages are built from, and each row carries its own official source and the date we last read it.

Sources

Get rule-change alerts

We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.

We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.

Look up your locality