Every rule read from the city’s own code, not a directory

Find permit requirements for any local project

Search 137 local permit offices across 27 states. Get the verdict, the fee and the realistic timeline, each one cited to the ordinance or fee schedule it came from.

1,418
Verified permit rules
137
Localities covered
27
States
128,021
Permit records

Start with your project

Each type mapped to the exemption threshold your jurisdiction actually publishes.

All 13 project types

What it costs, and how long it takes

Fees come from each jurisdiction’s published schedule and timings from its own issued-permit records. Across the cities that publish dates, a residential permit runs from a median of 19 to 57 days, so a national average would not tell you anything about yours.

Get the fee and the timeline for your project

Pick the project and your jurisdiction. You get the verdict, the published fee, and the measured timeline where the city publishes one.

Residential floor plans with imperial dimensions spread on a table

Three steps to a decision you can act on

  1. 1

    Tell us the project and the place

    No account, no phone number, no quote request standing between you and the answer.

  2. 2

    Get the verdict, fee and timeline

    Required, exempt or conditional, with the threshold that decides it and a link to the ordinance we read.

  3. 3

    Take the checklist to the counter

    Documents, inspections and the office's direct number. Printable, or handed straight to the contractor pulling it.

Find your permit office

All 27 states

Rules we caught changing

All tracked changes

Statute-cited changes to permit rules and fees, caught in our verification passes.

Check my project