North Carolina / Greensboro

Solar Permit in Greensboro, North Carolina

Permit required

Yes, a permit is required

Before a contractor installs rooftop solar panels: plans go in first, then the building permit, then a separate electrical permit.

Quick answer

A rooftop solar installation in Greensboro takes two permits, and the city sets out the sequence on a dedicated Solar Panel Installations page. The contractor submits plans to Development Services, a City Building Permit follows once staff approve the plans, and the contractor must then apply separately for an Electrical Permit. The electrical inspection gates the meter release: when the inspector approves, the city notifies the utility that there is an approved solar installation at that address. A final building inspection closes the job, and throughout the work the contractor must follow the NC Department of Insurance inspection procedures for residential rooftop solar installations.

Issued by
City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections)
From an official source Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your North Carolina Licensing Board for General Contractors (NCLBGC) license active, and under which business name? Verify it on portal.nclbgc.org.

North Carolina's owner-builder rule (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Greensboro

Fee schedule in force
Official scheduleRead .
Published in
Building Permit Fee Schedule, Document #1005 dated 12/19/24:
  • 'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.'
  • The Electrical Permit Fee Schedule, Document #4100 dated 7/16/24, has no solar line item;
  • it prices the work through 'Minimum Permit Fee 85.00', 'Panel 10.00 ea.' and the amp-rated service lines ('200 Amp. Service 99.00 ea.').

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Greensboro compares in North Carolina

No North Carolina jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CharlottePermit requiredSee schedule
DurhamPermit requiredSee schedule
Greensborothis pagePermit requiredBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Mecklenburg CountyPermit requiredPermits are priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
RaleighPermit requiredSee schedule
Wake CountyPermit requiredSee schedule

How to apply in Greensboro

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections)

  • Development Services, Melvin Municipal Office Building, Upper Ground Level, Room UG10, 300 W. Washington St., Greensboro, NC 27401
  • Phone: 336-373-2155
  • Email: DevelopmentServices2@greensboro-nc.gov

Permitting activity in Greensboro

In 2025, Greensboro authorized permits for 1,972 new residential housing units (906 single-family, 1,066 in multi-family buildings), valued at $411M, up from 1,954 the year before. That works out to about 6.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,878.

What else needs a permit in Greensboro

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsBefore building a new deck or porch, and before any work on an existing deck beyond...Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Electrical PermitIt dependsBefore adding, replacing or redesigning electrical wiring, devices, appliances or...Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00'
HVAC PermitPermit requiredAny sizeMechanical Permit Fee Schedule, Document #4200 dated 7/16/24: 'Minimum Inspection Fee $ 85.00'
Patio PermitIt dependsBefore building an elevated patio that needs retaining walls or foundation walls, and...Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Plumbing PermitIt dependsBefore adding to or altering the drainage, waste, vent, water service or water...Plumbing Permit Fee Schedule, Document #4300 dated 7/16/24: 'Minimum Permit/Inspection Fee $ 85.00'
Pool PermitPermit requiredAny sizeIts value table starts at $85.00 in the residential Alt/Add column and $86.25 in the new construction column for a $1,000 value; the schedule has the rest
Roof Replacement PermitIt dependscost of the construction, installation, repair, replacement or alterationBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Shed PermitIt dependslength, width or height of the accessory buildingIt lists 'Residential - New Homes and Detached Garages' with new construction, whose column starts at $86.25 for a $1,000 value; the schedule has the rest

Frequently asked questions

Do you need a solar permit in Greensboro?
Yes, before a contractor installs rooftop solar panels: plans go in first, then the building permit, then a separate electrical permit. If you are unsure how that applies to your project, call the permit office at 336-373-2155 before you start.
How much does a solar permit cost in Greensboro?
The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at 336-373-2155.
Where do you apply for a solar permit in Greensboro?
You can apply through the Greensboro permit portal or contact the City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections) directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Greensboro?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Greensboro applies this before you apply.

From the Library

Solar Permit in other North Carolina localities

Everything above, sourced

How this solar permit page for Greensboro was verified. 2 official sources: greensboro-nc.gov, greensboro-nc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project