North Carolina / Mecklenburg County

Solar Permit in Mecklenburg County, North Carolina

Permit required

Yes, a permit is required

Before installing a residential solar photovoltaic system in Mecklenburg County

Quick answer

Mecklenburg County requires a permit for the addition, replacement or change in the design of an electrical system whatever the project costs, and its online portal has a Residential Solar Photovoltaic application. Confirm the exact permit types for your system with Code Enforcement.

Issued by
Mecklenburg County Land Use and Environmental Services Agency Code Enforcement
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your North Carolina Licensing Board for General Contractors (NCLBGC) license active, and under which business name? Verify it on portal.nclbgc.org.

North Carolina's owner-builder rule (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Mecklenburg County

Fee schedule in force
Official scheduleRead .
  • No solar-specific line in the fee ordinance;
  • permits are priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review, then $59.70 plus $12.19 per $1,000 or part over $3,000 up to $50,000.
  • The fee is the greater of that schedule or Note a, which charges projects under $100,000 and all renovation/alteration projects $79.61 per trade plus $.12 per square foot for the building trade and $.08 per square foot for each electrical, mechanical or plumbing trade involved.
  • A $3.00 technology charge is added to every permit, per the LUESA Fee Ordinance revised July 1, 2026.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Mecklenburg County compares in North Carolina

No North Carolina jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CharlottePermit requiredSee schedule
DurhamPermit requiredSee schedule
GreensboroPermit requiredBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Mecklenburg Countythis pagePermit requiredPermits are priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
RaleighPermit requiredSee schedule
Wake CountyPermit requiredSee schedule

How to apply in Mecklenburg County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Mecklenburg County Land Use and Environmental Services Agency Code Enforcement

  • 2145 Suttle Ave., Charlotte, NC 28208
  • Phone: 980-314-2633
  • Email: Code@MeckNC.gov

Permitting activity in Mecklenburg County

In 2025, Mecklenburg County authorized permits for 7,496 new residential housing units (3,747 single-family, 3,749 in multi-family buildings), valued at $1.5B, down from 11,969 the year before. That works out to about 6.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,233,383.

About Mecklenburg County

Mecklenburg County has about 491,721 housing units. The median home is valued at $371,200, against a median household income of $83,765. About 56% of homes are owner-occupied, and the typical home was built around 1996.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

What else needs a permit in Mecklenburg County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeBuilding permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical trade permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
Fence PermitIt dependsthe county does not name fences; its general rule is that permits may not be required for residential projects with work costing $40,000 or less unless the work involves load bearing structures or the other items it listsNot published
HVAC PermitPermit requiredAny sizeMechanical trade permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
Patio PermitNot confirmedNot confirmedBuilding permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
Plumbing PermitIt dependswork costing $40,000 or less may not need a permit unless it involves the addition or change in the design of a plumbing systemPlumbing trade permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
Pool PermitPermit requiredAny sizeBuilding permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
Roof Replacement PermitIt dependsno permit for like-for-like roof covering replacement costing $40,000 or less on a single-family home; a permit is required above that cost, for structural changes, or when the roof classification changesBuilding permit priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
Shed PermitIt dependsa storage shed or accessory building with any dimension greater than 12 feet needs a building permit; smaller ones need a zoning permit onlySee schedule

Frequently asked questions

Do you need a solar permit in Mecklenburg County?
Yes, before installing a residential solar photovoltaic system in Mecklenburg County. If you are unsure how that applies to your project, call the Mecklenburg County Land Use and Environmental Services Agency Code Enforcement at 980-314-2633 before you start.
How much does a solar permit cost in Mecklenburg County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Mecklenburg County Land Use and Environmental Services Agency Code Enforcement at 980-314-2633.
Where do you apply for a solar permit in Mecklenburg County?
You can apply through the Mecklenburg County permit portal or contact the Mecklenburg County Land Use and Environmental Services Agency Code Enforcement directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Mecklenburg County?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Mecklenburg County applies this before you apply.

From the Library

Solar Permit in other North Carolina localities

Everything above, sourced

code.mecknc.gov: acaread

How this solar permit page for Mecklenburg County was verified. 2 official sources: code.mecknc.gov, code.mecknc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Mecklenburg County Land Use and Environmental Services Agency Code Enforcement. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project