Solar Permit in Wake County, North Carolina
Permit required
Yes, a permit is required
Before installing a roof-mounted, building-integrated or ground-mounted solar photovoltaic system.
Quick answer
Solar panels are permitted work in unincorporated Wake County; the county's fee schedule lists them among the projects covered by the single residential permit, and its Solar Panels planning checklist assigns a permit type to every residential case. On an existing home, a roof-mounted system is permitted as a Residential alteration and a ground-mounted system as a Residential non-building structure; on a new build, solar is incorporated into the plans as an accessory structure under Unified Development Ordinance Section 4-70-1 H. The checklist adds an aviation notice step only for commercial arrays larger than half an acre within five miles of a public airport.
- Issued by
- Wake County Permits and Inspections (Planning and Development Services)
- Phone
- 919-856-6222
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your North Carolina Licensing Board for General Contractors (NCLBGC) license active, and under which business name? Verify it on portal.nclbgc.org.
North Carolina's owner-builder rule (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Wake County
- Fee schedule in force
- Official scheduleRead .
Solar panels are named in the Residential Additions, Alterations, Accessory Building & Structures line: 'This fee includes permits for additions, alterations, repairs, sheds, attached/detached garages, retaining walls, porches, decks, solar panels, closed crawlspaces, etc.' The fee is 'Residential Permit Fee $75 plus $0.25 per square foot of gross floor area.'
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Wake County compares in North Carolina
No North Carolina jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Charlotte | Permit required | See schedule |
| Durham | Permit required | See schedule |
| Greensboro | Permit required | Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' |
| Mecklenburg County | Permit required | Permits are priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest |
| Raleigh | Permit required | See schedule |
| Wake Countythis page | Permit required | See schedule |
How to apply in Wake County
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Wake County Permits and Inspections (Planning and Development Services)
- Waverly F. Akins Wake County Office Building, First Floor, 336 Fayetteville St., Raleigh, NC 27602
- Phone: 919-856-6222
- Email: Wake.Permitting@wake.gov
Your Solar Permit checklist for Wake County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: wake.gov: permits and inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Wake County permit portal.
- Keep the office details handy. Wake County Permits and Inspections (Planning and Development Services). Phone: 919-856-6222. Email: Wake.Permitting@wake.gov. Address: Waverly F. Akins Wake County Office Building, First Floor, 336 Fayetteville St., Raleigh, NC 27602.
Compiled from the official sources on this page. Last checked .
Permitting activity in Wake County
In 2025, Wake County authorized permits for 13,806 new residential housing units (8,392 single-family, 5,414 in multi-family buildings), valued at $3.5B, down from 15,248 the year before. That works out to about 11 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,257,235.
What else needs a permit in Wake County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Before building a new deck or porch, or rebuilding deck structure such as framing... | See schedule |
| Electrical Permit | It depends | Before installing, extending, altering or generally repairing electrical wiring... | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | Permit required | Any size | See schedule |
| Plumbing Permit | It depends | Before installing, extending, relocating, replacing or generally repairing any plumbing... | See schedule |
| Pool Permit | It depends | water the pool, hot tub or spa is able to hold | See schedule |
| Roof Replacement Permit | It depends | When the re-roof is not purely nonstructural, when load-bearing roof structure is... | See schedule |
| Shed Permit | It depends | any dimension of the detached accessory building | See schedule |
Frequently asked questions
- Do you need a solar permit in Wake County?
- Yes, before installing a roof-mounted, building-integrated or ground-mounted solar photovoltaic system. If you are unsure how that applies to your project, call the permit office at 919-856-6222 before you start.
- How much does a solar permit cost in Wake County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at 919-856-6222.
- Where do you apply for a solar permit in Wake County?
- You can apply through the Wake County permit portal or contact the Wake County Permits and Inspections (Planning and Development Services) directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Wake County?
- Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Wake County applies this before you apply.
From the Library
Solar Permit in other North Carolina localities
Everything above, sourced
How this solar permit page for Wake County was verified. 2 official sources: wake.gov, wake.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Wake County Permits and Inspections (Planning and Development Services). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page