North Carolina / Wake County

Solar Permit in Wake County, North Carolina

Permit required

Yes, a permit is required

Before installing a roof-mounted, building-integrated or ground-mounted solar photovoltaic system.

Quick answer

Solar panels are permitted work in unincorporated Wake County; the county's fee schedule lists them among the projects covered by the single residential permit, and its Solar Panels planning checklist assigns a permit type to every residential case. On an existing home, a roof-mounted system is permitted as a Residential alteration and a ground-mounted system as a Residential non-building structure; on a new build, solar is incorporated into the plans as an accessory structure under Unified Development Ordinance Section 4-70-1 H. The checklist adds an aviation notice step only for commercial arrays larger than half an acre within five miles of a public airport.

Issued by
Wake County Permits and Inspections (Planning and Development Services)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your North Carolina Licensing Board for General Contractors (NCLBGC) license active, and under which business name? Verify it on portal.nclbgc.org.

North Carolina's owner-builder rule (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Wake County

Fee schedule in force
Official scheduleRead .

Solar panels are named in the Residential Additions, Alterations, Accessory Building & Structures line: 'This fee includes permits for additions, alterations, repairs, sheds, attached/detached garages, retaining walls, porches, decks, solar panels, closed crawlspaces, etc.' The fee is 'Residential Permit Fee $75 plus $0.25 per square foot of gross floor area.'

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Wake County compares in North Carolina

No North Carolina jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CharlottePermit requiredSee schedule
DurhamPermit requiredSee schedule
GreensboroPermit requiredBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Mecklenburg CountyPermit requiredPermits are priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
RaleighPermit requiredSee schedule
Wake Countythis pagePermit requiredSee schedule

How to apply in Wake County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Wake County Permits and Inspections (Planning and Development Services)

  • Waverly F. Akins Wake County Office Building, First Floor, 336 Fayetteville St., Raleigh, NC 27602
  • Phone: 919-856-6222
  • Email: Wake.Permitting@wake.gov

Permitting activity in Wake County

In 2025, Wake County authorized permits for 13,806 new residential housing units (8,392 single-family, 5,414 in multi-family buildings), valued at $3.5B, down from 15,248 the year before. That works out to about 11 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,257,235.

What else needs a permit in Wake County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsBefore building a new deck or porch, or rebuilding deck structure such as framing...See schedule
Electrical PermitIt dependsBefore installing, extending, altering or generally repairing electrical wiring...See schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitPermit requiredAny sizeSee schedule
Plumbing PermitIt dependsBefore installing, extending, relocating, replacing or generally repairing any plumbing...See schedule
Pool PermitIt dependswater the pool, hot tub or spa is able to holdSee schedule
Roof Replacement PermitIt dependsWhen the re-roof is not purely nonstructural, when load-bearing roof structure is...See schedule
Shed PermitIt dependsany dimension of the detached accessory buildingSee schedule

Frequently asked questions

Do you need a solar permit in Wake County?
Yes, before installing a roof-mounted, building-integrated or ground-mounted solar photovoltaic system. If you are unsure how that applies to your project, call the permit office at 919-856-6222 before you start.
How much does a solar permit cost in Wake County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at 919-856-6222.
Where do you apply for a solar permit in Wake County?
You can apply through the Wake County permit portal or contact the Wake County Permits and Inspections (Planning and Development Services) directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Wake County?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Wake County applies this before you apply.

From the Library

Solar Permit in other North Carolina localities

Everything above, sourced

How this solar permit page for Wake County was verified. 2 official sources: wake.gov, wake.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Wake County Permits and Inspections (Planning and Development Services). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project