Electrical Permit in Wake County, North Carolina
It depends
Sometimes, depending on the project
Before installing, extending, altering or generally repairing electrical wiring, devices, appliances or equipment, other than a like-for-like fixture or device swap by a licensed electrical contractor.
Quick answer
An electrical permit is required in unincorporated Wake County for the installation, extension, alteration or general repair of any electrical wiring, devices, appliances or equipment. The published exemption is narrow and applies only to one- and two-family dwellings: repairing or replacing lighting fixtures or devices such as receptacles and lighting switches, where the replacement has the same voltage and the same or less amperage and the work is done by a contractor licensed under G.S. 87-43. A licensed electrical contractor is required for all electrical work, except that homeowners may do their own if they own the property and will personally occupy the structure.
- Issued by
- Wake County Permits and Inspections (Planning and Development Services)
- Phone
- 919-856-6222
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Wake County
- Fee schedule in force
- Official scheduleRead .
'Residential Trade Permit Fee - $75. The $75 permit fee is a single permit fee for electrical, mechanical and plumbing, regardless of number of trades involved. Electrical pole fee is included in the $75 trade fee.'
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Wake County compares in North Carolina
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Charlotte | It depends | Any time permanent wiring, devices or equipment in or attached to the house or an... |
| Durham | It depends | Before installing, extending, altering or generally repairing any electrical wiring... |
| Greensboro | It depends | Before adding, replacing or redesigning electrical wiring, devices, appliances or... |
| Mecklenburg County | Permit required | Any size |
| Raleigh | It depends | Before an electrical service upgrade, adding circuits or outlets, installing an interior... |
| Wake Countythis page | It depends | Before installing, extending, altering or generally repairing electrical wiring... |
How to apply in Wake County
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Wake County Permits and Inspections (Planning and Development Services)
- Waverly F. Akins Wake County Office Building, First Floor, 336 Fayetteville St., Raleigh, NC 27602
- Phone: 919-856-6222
- Email: Wake.Permitting@wake.gov
Your Electrical Permit checklist for Wake County
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: wake.gov: permits and inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Wake County permit portal.
- Keep the office details handy. Wake County Permits and Inspections (Planning and Development Services). Phone: 919-856-6222. Email: Wake.Permitting@wake.gov. Address: Waverly F. Akins Wake County Office Building, First Floor, 336 Fayetteville St., Raleigh, NC 27602.
Compiled from the official sources on this page. Last checked .
Permitting activity in Wake County
In 2025, Wake County authorized permits for 13,806 new residential housing units (8,392 single-family, 5,414 in multi-family buildings), valued at $3.5B, down from 15,248 the year before. That works out to about 11 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,257,235.
What else needs a permit in Wake County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Before building a new deck or porch, or rebuilding deck structure such as framing... | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | Permit required | Any size | See schedule |
| Plumbing Permit | It depends | Before installing, extending, relocating, replacing or generally repairing any plumbing... | See schedule |
| Pool Permit | It depends | water the pool, hot tub or spa is able to hold | See schedule |
| Roof Replacement Permit | It depends | When the re-roof is not purely nonstructural, when load-bearing roof structure is... | See schedule |
| Shed Permit | It depends | any dimension of the detached accessory building | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need an electrical permit in Wake County?
- Sometimes: before installing, extending, altering or generally repairing electrical wiring, devices, appliances or equipment, other than a like-for-like fixture or device swap by a licensed electrical contractor. If you are unsure how that applies to your project, call the permit office at 919-856-6222 before you start.
- How much does an electrical permit cost in Wake County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at 919-856-6222.
- Where do you apply for an electrical permit in Wake County?
- You can apply through the Wake County permit portal or contact the Wake County Permits and Inspections (Planning and Development Services) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Wake County?
- Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Wake County applies this before you apply.
From the Library
Electrical Permit in other North Carolina localities
Everything above, sourced
How this electrical permit page for Wake County was verified. 2 official sources: wake.gov, wake.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Wake County Permits and Inspections (Planning and Development Services). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page