North Carolina / Wake County

Plumbing Permit in Wake County, North Carolina

It depends

Sometimes, depending on the project

Before installing, extending, relocating, replacing or generally repairing any plumbing system, other than a minor fixture repair or replacement that leaves the water supply, waste and vent systems undisturbed.

Confirmed on official page Verified Wake County Permits and Inspections (Planning and Development Services)

By Mario Bailey, verified against official sources

Quick answer

Wake County requires a plumbing permit for the installation, extension, relocation, replacement or general repair of any plumbing system, and publishes one exemption: minor repairs or replacements of plumbing fixtures that do not disrupt the original water supply, waste or ventilation system. A second exemption covers replacing a water heater in a one- or two-family dwelling when the energy use rate or thermal input is no greater than the unit being replaced, there is no change in fuel, energy source, location, routing or sizing of venting and piping, and a licensed plumbing contractor does the work to the current North Carolina State Building Code. A licensed plumbing contractor is otherwise required, except for homeowners who own the property and will personally occupy the structure.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before installing, extending, relocating, replacing or generally repairing any plumbing system, other than a minor fixture repair or replacement that leaves the water supply, waste and vent systems undisturbed.

What a plumbing permit costs in Wake County

Line item
plumbing permitBy formula'Residential Trade Permit Fee - $75. The $75 permit fee is a single permit fee for electrical, mechanical and plumbing, regardless of number of trades involved. Electrical pole fee is included in the $75 trade fee.'.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Wake County compares in North Carolina

No North Carolina jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CharlotteIt dependsPlumbing is charged as a trade permit under the LUESA Fee Ordinance (revised...
GreensboroIt dependsPlumbing Permit Fee Schedule, Document #4300 dated 7/16/24: 'Minimum...
Mecklenburg CountyPermit requiredPlumbing trade permit priced off total construction value with a $59.70...
Wake Countythis pageIt depends'Residential Trade Permit Fee - $75.

How to apply in Wake County

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Wake County Permits and Inspections (Planning and Development Services) sets the exact checklist for Wake County.

Where to apply in Wake County:

Wake County Permits and Inspections (Planning and Development Services)

  • Waverly F. Akins Wake County Office Building, First Floor, 336 Fayetteville St., Raleigh, NC 27602
  • Phone: 919-856-6222
  • Email: Wake.Permitting@wake.gov

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Wake County permit portal or by phone at 919-856-6222.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a plumbing permit in Wake County?
Wake County requires a plumbing permit for the installation, extension, relocation, replacement or general repair of any plumbing system, and publishes one exemption: minor repairs or replacements of plumbing fixtures that do not disrupt the original water supply, waste or ventilation system. A second exemption covers replacing a water heater in a one- or two-family dwelling when the energy use rate or thermal input is no greater than the unit being replaced, there is no change in fuel, energy source, location, routing or sizing of venting and piping, and a licensed plumbing contractor does the work to the current North Carolina State Building Code. A licensed plumbing contractor is otherwise required, except for homeowners who own the property and will personally occupy the structure. Always confirm with the Wake County Permits and Inspections (Planning and Development Services) before starting.
How much does a plumbing permit cost in Wake County?
'Residential Trade Permit Fee - $75. The $75 permit fee is a single permit fee for electrical, mechanical and plumbing, regardless of number of trades involved. Electrical pole fee is included in the $75 trade fee.'. See the official fee schedule for current amounts.
Where do you apply for a plumbing permit in Wake County?
You can apply through the Wake County permit portal or contact the Wake County Permits and Inspections (Planning and Development Services) directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Wake County?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Wake County applies this before you apply.

From the Library

What else needs a permit in Wake County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsNot specifiedDecks are named in the Residential Additions, Alterations, Accessory Building &...
Electrical PermitIt dependsNot specified'Residential Trade Permit Fee - $75.
HVAC PermitPermit requiredNot specified'Residential Trade Permit Fee - $75.
Patio PermitPermit requiredNot specifiedPlanning and Development Fees, as of 1/1/22: 'Zoning Permit (Land use, Home Occupation &...
Pool PermitIt dependswater the pool, hot tub or spa is able to holdResidential Swimming Pools, Hot Tubs & Spas: 'Above-Ground swimming pools hot tubs &...
Roof Replacement PermitIt dependsNot specifiedIf a permit is required the work falls under Residential Additions, Alterations...
Shed PermitIt dependsany dimension of the detached accessory buildingUnder Residential Additions, Alterations, Accessory Building & Structures: 'Residential...
Solar PermitPermit requiredNot specifiedSolar panels are named in the Residential Additions, Alterations, Accessory Building &...

Plumbing Permit in other North Carolina localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Wake County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Wake County Permits and Inspections (Planning and Development Services). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Plumbing Permit requirements across North Carolina localities

It depends
Get quotes