What you can build without a permit in North Carolina
Quick answer
Across the 6 North Carolina jurisdictions we have verified, none of the 62 project rules is a flat "no permit", 35 turn on a size or scope condition the jurisdiction publishes, and 27 require a permit regardless. Plumbing work is where the answer most often comes with a published condition rather than a flat yes: 6 of the 6 jurisdictions that answer publish one.
- Jurisdictions read
- 6
- Rules with an answer
- 62
- No permit needed
- 0
- Depends on size or scope
- 35
- Permit always required
- 27
How to read this page
"No permit" means the jurisdiction publishes that the work needs no building permit. "Depends" means it publishes a size, height, depth, cost or scope condition that decides the answer, quoted in its own words in the last column; the number beside it is the figure that condition turns on, and which side of the number is exempt is stated by the condition, not by us. Exempt from a building permit is not exempt from zoning, setbacks, height limits, flood rules, an HOA, or a separate electrical, plumbing or mechanical permit, and several of the conditions below say exactly that.
Plumbing
All 6 make the plumbing answer turn on a size or scope condition the jurisdiction publishes.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Charlotte | Depends | Mecklenburg County requires a plumbing permit for any addition to or change in the design of a plumbing system in Charlotte, at any cost, since plumbing is carved out of the $40,000 residential exemption. | |
| Durham | Depends | State law, which Durham City-County Building & Safety enforces, requires a permit before the installation, extension or general repair of any plumbing system. | |
| Greensboro | Depends | Greensboro requires a separate plumbing permit for each trade on a job. | |
| Mecklenburg County | Depends | $40,000 | work costing $40,000 or less may not need a permit unless it involves the addition or change in the design of a plumbing system. |
| Raleigh | Depends | Raleigh issues its own plumbing permits, and its How to Get a Residential Permit chart lists existing water and sewer line replacement and water heater replacement among projects that need a permit but no plans. | |
| Wake County | Depends | Wake County requires a plumbing permit for the installation, extension, relocation, replacement or general repair of any plumbing system, and publishes one exemption: minor repairs or replacements of plumbing fixtures that do not disrupt the original water supply, waste or ventilation system. |
Roof Replacement
All 6 make the roof replacement answer turn on a size or scope condition the jurisdiction publishes, and the 4 that state a number all publish $40,000.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Charlotte | Depends | Mecklenburg County treats a straight like-for-like reroof as exempt and everything else as permitted. | |
| Durham | Depends | $40,000 | cost of the roof replacement work on a single-family residence. |
| Greensboro | Depends | $40,000 | cost of the construction, installation, repair, replacement or alteration. |
| Mecklenburg County | Depends | $40,000 | no permit for like-for-like roof covering replacement costing $40,000 or less on a single-family home; a permit is required above that cost, for structural changes, or when the roof classification changes. |
| Raleigh | Depends | $40,000 | cost of the roof replacement work in a single-family residence. |
| Wake County | Depends | Wake County applies North Carolina's cost exemption to re-roofing: nonstructural work in a single-family residence costing less than $40,000.00 does not require a permit unless it involves new or altered plumbing, mechanical or electrical systems, so a straightforward shingle replacement usually needs no permit. |
Electrical
5 of 6 make the electrical answer turn on a size or scope condition the jurisdiction publishes. Mecklenburg County requires a permit for electrical work regardless of size.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Charlotte | Depends | Mecklenburg County requires an electrical permit for essentially any change to permanent wiring in Charlotte, and the $40,000 residential exemption does not reach electrical work. | |
| Durham | Depends | Durham City-County Building & Safety requires an electrical permit to install, extend, alter or generally repair any electrical wiring, devices, appliances or equipment. | |
| Greensboro | Depends | Greensboro requires a separate electrical permit for each trade on a job, and says so plainly: all electrical, plumbing and mechanical work needs a separate permit for each trade. | |
| Raleigh | Depends | Raleigh issues its own electrical permits; there is no state electrical-permit handoff in North Carolina. | |
| Wake County | Depends | An electrical permit is required in unincorporated Wake County for the installation, extension, alteration or general repair of any electrical wiring, devices, appliances or equipment. | |
| Mecklenburg County | Permit required | An electrical permit is required in Mecklenburg County for the installation, alteration, or extension of residential electrical systems. |
Deck
4 of 6 make the deck answer turn on a size or scope condition the jurisdiction publishes. Charlotte and Mecklenburg County require a permit for deck work regardless of size.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Durham | Depends | Building a new deck needs a building permit, because North Carolina law requires a permit for any work that adds, repairs or replaces load-bearing structures whatever it costs. | |
| Greensboro | Depends | A new deck in Greensboro needs a building permit. | |
| Raleigh | Depends | A new deck in Raleigh always needs a building permit: the city says "A building permit is required when installing a screened porch, deck, balcony, sunroom, or similar structure." The application needs a residential permit form, site plan and, for anything roofed, elevations. | |
| Wake County | Depends | A new deck or porch in unincorporated Wake County requires a building permit, applied for in the Permit Portal with a site plan and deck plans. | |
| Charlotte | Permit required | Mecklenburg County requires a building permit for every deck in Charlotte regardless of size, and Charlotte requires its own Land Development Individual Residential Lot review on top of it. | |
| Mecklenburg County | Permit required | Mecklenburg County lists adding, replacing or upgrading a deck among home projects that typically require a permit, and work on load bearing structures needs a permit whatever it costs. |
Fence
All 4 make the fence answer turn on a size or scope condition the jurisdiction publishes. 2 publish no answer we could verify.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Charlotte | Depends | Building permits inside Charlotte come from the county, not the city: Mecklenburg County Code Enforcement issues the building, electrical, mechanical and plumbing permits for Charlotte and for the towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill and Pineville under a single consolidated county-wide code authority, while the City of Charlotte keeps zoning and administers the Unified Development Ordinance. | |
| Durham | Depends | Authority first: residential permits for BOTH the City of Durham and unincorporated Durham County come from one joint department, the Durham City-County Building & Safety Department (renamed from the City-County Inspections Department; many of its documents still carry the old name), housed in Durham City Hall. | |
| Mecklenburg County | Depends | $40,000 | the county does not name fences; its general rule is that permits may not be required for residential projects with work costing $40,000 or less unless the work involves load bearing structures or the other items it lists. |
| Raleigh | Depends | 50 percent | share of an existing residential fence being replaced with no change of material, height or location. |
Shed
3 of 6 make the shed answer turn on a size or scope condition the jurisdiction publishes, and the 3 that state a number all publish 12 feet in any dimension. Charlotte, Durham and Raleigh require a permit for shed work regardless of size.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Greensboro | Depends | 12 feet in any dimension | length, width or height of the accessory building. |
| Mecklenburg County | Depends | 12 feet in any dimension | a storage shed or accessory building with any dimension greater than 12 feet needs a building permit; smaller ones need a zoning permit only. |
| Wake County | Depends | 12 feet in any dimension | any dimension of the detached accessory building. |
| Charlotte | Permit required | Every shed in Charlotte needs a permit; what changes at 12 feet is which government issues it. | |
| Durham | Permit required | Durham City-County Building & Safety requires a building permit to place or build any accessory structure, naming a storage building, detached carport, garage and pool house as examples, with no size exemption published. | |
| Raleigh | Permit required | Raleigh requires a permit for every accessory structure, including storage sheds, gazebos, greenhouses, detached garages, carports and pool houses, regardless of size. |
Pool
2 of 6 make the pool answer turn on a size or scope condition the jurisdiction publishes, and the 2 that state a number all publish 24 inches. 4 require a permit for pool work regardless of size.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Raleigh | Depends | 24 inches | water a pool, spa or hot tub can hold. |
| Wake County | Depends | 24 inches | water the pool, hot tub or spa is able to hold. |
| Charlotte | Permit required | A residential pool in Charlotte runs through three separate bodies. | |
| Durham | Permit required | Durham City-County Building & Safety requires a building permit for swimming pools, and says the requirements apply to both in-ground and above-ground pools, with no size or depth exemption published. | |
| Greensboro | Permit required | A residential swimming pool in Greensboro needs a building permit. | |
| Mecklenburg County | Permit required | All permanently installed swimming pools in Mecklenburg County require permits and inspections, including an electrical permit, and zoning approval is part of the permitting process. |
Bathroom Remodel
All 2 make the bathroom remodel answer turn on a size or scope condition the jurisdiction publishes, and the 2 that state a number all publish $40,000.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Durham | Depends | $40,000 | cost of the remodel work on a single-family residence. |
| Raleigh | Depends | $40,000 | cost of the remodel in a single-family residence, where no load-bearing, plumbing-design, HVAC or electrical work is involved. |
Water Heater
All 2 make the water heater answer turn on a size or scope condition the jurisdiction publishes.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Durham | Depends | State law, which Durham City-County Building & Safety enforces, requires plumbing and electrical permits for water heater work but exempts a like-for-like replacement in a one- or two-family dwelling. | |
| Raleigh | Depends | Raleigh lists "water heater replacement" among projects that need a permit but no plans, and its residential application asks whether a replacement is the same type, the same size or smaller and in the same location. |
Patio
1 of 4 makes the patio answer turn on a size or scope condition the jurisdiction publishes. Charlotte, Raleigh and Wake County require a permit for patio work regardless of size. 2 publish no answer we could verify.
| Jurisdiction | Permit | Published figure | What the rule says |
|---|---|---|---|
| Greensboro | Depends | Greensboro publishes no stand-alone patio answer, but it does draw one line for patios. | |
| Charlotte | Permit required | A patio in Charlotte always needs a permit; the question is only which one. | |
| Raleigh | Permit required | Raleigh's How to Get a Residential Permit chart lists "Patios" under Decks + Porches among the projects that must be submitted with a Residential Permit Application and supporting plans, and the chart is the only place the city answers the patio question directly. | |
| Wake County | Permit required | Wake County routes residential patios and driveways through Planning and Zoning rather than through a building permit. |
If the work is already built
In North Carolina, building without a required permit is a state crime, not merely a local ordinance violation. G.S. 160D-1110(a) requires all permits to be secured before construction, plumbing, heating or cooling, or electrical work begins, and G.S. 160D-1110(i) states flatly that violation of that section is a Class 1 misdemeanor.
North Carolina penalties, the after-the-fact path, and what the statute actually says
4 of the 66 rules we hold for North Carolina are unresolved because the jurisdiction publishes no answer; they are counted nowhere above. The 62 answered rules come from 38 official sources, each linked from the permit page behind every jurisdiction name. See the full picture for the state on the North Carolina permit requirements page.
This page compiles what each North Carolina jurisdiction publishes, with a last checked date. It is not legal advice, and a project that is exempt from a building permit can still need zoning approval or a trade permit. Confirm with the office linked from the jurisdiction's page before you build.