North Carolina / Durham

Bathroom Remodel Permit in Durham, North Carolina

It depends

Sometimes, depending on the project

When the remodel costs more than $40,000, or touches load-bearing walls, adds or redesigns plumbing, or adds or replaces wiring, devices or equipment beyond like-kind device and fixture swaps.

Confirmed on official page Verified

Issued byDurham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County

By Mario Bailey, verified against official sources

Quick answer

Durham publishes no bathroom-specific page, so the answer comes from the state exemption the department enforces: work costing $40,000 or less on a single-family residence needs no building permit unless it adds, repairs or replaces load-bearing structures, adds or changes the design of plumbing, or adds, replaces or redesigns electrical wiring, devices or equipment beyond like-kind device and fixture replacement. Finishes such as tile, paint and cabinets on a small job therefore need no building permit, while moving a drain, adding a circuit or removing a wall does. Durham still prices plumbing permits for fixture replacements, so a fixture swap should be checked with the department.

Typical threshold: cost of the remodel work on a single-family residence.

Who is pulling this permit?

Hire it out

Sponsored

Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.

Compare bathroom remodel quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

When the remodel costs more than $40,000, or touches load-bearing walls, adds or redesigns plumbing, or adds or replaces wiring, devices or equipment beyond like-kind device and fixture swaps.

What a bathroom remodel permit costs in Durham

Line item
bathroom remodel permitBy formulaPlumbing Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule E "Fixture Replacement; No Change to Rough-in": 1-4 fixtures $65.00; Schedule D additions: 1-7 fixtures $94.00. Building Permit Fee Schedule, Schedule D "Interior renovations": 0 to $10,000.00 $125.00 building permit fee plus $125.00 plan review fee; $10,001.00 and over $250.00 plus $125.00.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Durham

In Durham, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.

What most bathroom remodel permit applications include:

  • Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
  • For Durham, the permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
  • Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
  • For Durham, a bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
  • New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
  • Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
  • Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County sets the exact checklist for Durham.

Where to apply in Durham:

Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County

Bathroom Remodel Permit in Durham compared with nearby North Carolina localities

LocalityPermit needed?ThresholdWhat each North Carolina schedule saysVerified
DurhamIt dependscost of the remodel work on a single-family residenceNo Change to Rough-in": 1-4 fixtures $65.00
RaleighIt dependscost of the remodel in a single-family residence, where no load-bearing, plumbing-design, HVAC or electrical work is involvedFY27 Development Fee Guide (applications submitted July 1, 2026 through June 30, 2027)...

Inspections and closing out your permit

In Durham, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.

  1. In Durham: any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
  2. In Durham: the plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
  3. In Durham: work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
  4. Scheduling is on the permit holder in Durham: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
  5. In Durham: a final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Durham permit portal or by phone at 919-560-4144.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Durham

In 2025, Durham authorized permits for 4,483 new residential housing units (2,518 single-family, 1,965 in multi-family buildings), valued at $1.3B, up from 2,793 the year before. That works out to about 15.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 285,809.

Frequently asked questions

Do you need a bathroom remodel permit in Durham?
Durham publishes no bathroom-specific page, so the answer comes from the state exemption the department enforces: work costing $40,000 or less on a single-family residence needs no building permit unless it adds, repairs or replaces load-bearing structures, adds or changes the design of plumbing, or adds, replaces or redesigns electrical wiring, devices or equipment beyond like-kind device and fixture replacement. Finishes such as tile, paint and cabinets on a small job therefore need no building permit, while moving a drain, adding a circuit or removing a wall does. Durham still prices plumbing permits for fixture replacements, so a fixture swap should be checked with the department. Cost of the remodel work on a single-family residence. Always confirm with the office before starting.
How much does a bathroom remodel permit cost in Durham?
Plumbing Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule E "Fixture Replacement; No Change to Rough-in": 1-4 fixtures $65.00; Schedule D additions: 1-7 fixtures $94.00. Building Permit Fee Schedule, Schedule D "Interior renovations": 0 to $10,000.00 $125.00 building permit fee plus $125.00 plan review fee; $10,001.00 and over $250.00 plus $125.00. See the official fee schedule for current amounts.
Where do you apply for a bathroom remodel permit in Durham?
You can apply through the Durham permit portal or contact the Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Durham?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Durham applies this before you apply.

From the Library

What else needs a permit in Durham

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsBefore building a new deck or altering its load-bearing structure...Schedule F "Miscellaneous": "Residential decks (single and two-family)"...
Electrical PermitIt dependsBefore installing, extending, altering or generally repairing any electrical wiring......7/1/18, Includes Technology Surcharge): "Minimum electrical permit fee"...
EV Charger PermitPermit requiredAny size...on individual branch circuits and not covered in other schedules, each" $10.90...
Fence PermitIt dependsOnly when the fence or wall is on a property in a designated flood plain, is used as a...See schedule
HVAC PermitPermit requiredAny size...of a heating/cooling system with any concealed ductwork or component"...
Plumbing PermitIt dependsBefore installing, extending or generally repairing any plumbing systemNo Change to Rough-in": 1-4 fixtures $65.00
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependscost of the roof replacement work on a single-family residence...Surcharge), Schedule F "Miscellaneous": "Residential Reroofing (addition)"...
Shed PermitPermit requiredAny size...Technology Surcharge), Schedule C "Accessory Buildings": "No footing" $50.00...
Solar PermitPermit requiredAny size...Schedule G "Miscellaneous": "Solar panel inspections" "Residential"...
Water Heater PermitIt dependsBefore installing a new water heater, or replacing one with a change in fuel, location......Technology Surcharge), Schedule E: "Electric water heater (permit required)"...

Bathroom Remodel Permit in other North Carolina localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Durham documents; the office above sets the local rules.

How this bathroom remodel permit page for Durham was verified. 2 official sources: durhamnc.gov, ncleg.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Bathroom Remodel Permit requirements across North Carolina localities

Bathroom remodel permit rules nationwide

Look up an existing Durham permit record

It depends
Get quotes