Permit required

Yes, a permit is required

Before installing any rooftop or ground-mounted solar PV system; a building permit is added when the roof's condition or structural integrity calls for one.

From an official source Verified

Issued byDurham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County

By Mario Bailey, verified against official sources

Quick answer

Solar PV on a house in Durham always needs an electrical permit, because the department requires one to install any electrical wiring, devices, appliances or equipment and charges a $100.00 residential solar panel inspection fee. Its solar handout says a building permit is required for all commercial arrays and for arrays on one- and two-family dwellings "depending on the condition and/or the structural integrity of the roof". Applications go through Dplans with engineer-stamped plans, and residential PV is one of the project types handled by Small Project Review.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your North Carolina Licensing Board for General Contractors (NCLBGC) license active, and under which business name? Verify it on portal.nclbgc.org.

North Carolina's owner-builder rule (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115) sets what you may do on your own home without hiring anyone. Read the statute.

When a permit is usually needed

Before installing any rooftop or ground-mounted solar PV system; a building permit is added when the roof's condition or structural integrity calls for one.

What a solar permit costs in Durham

Line item
solar permitBy formulaElectrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule G "Miscellaneous": "Solar panel inspections" "Residential" $100.00. The solar handout also points to Building Permit Fee Schedule G, whose "Solar Photovoltaic Power Systems Permit" line is $65.00 with a $70.00 review fee, listed under Fire Prevention Construction Permits.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Durham compares in North Carolina

No North Carolina jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CharlottePermit required...value under the LUESA Fee Ordinance (revised July 1, 2026), where $3,001...
Durhamthis pagePermit required...G "Miscellaneous": "Solar panel inspections" "Residential"...
GreensboroPermit required...Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee -...
Mecklenburg CountyPermit required...electrical trade permit priced off total construction value with a $59.70...
RaleighPermit required...June 30, 2027) lists only "Photovoltaic (Solar) - Commercial" at $543.00...
Wake CountyPermit required...panels, closed crawlspaces, etc.' The fee is 'Residential Permit Fee $75...

How to apply in Durham

In Durham, a rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.

What most solar permit applications include:

  • Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
  • For Durham, the plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
  • Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
  • For Durham, the site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
  • For Durham, the one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
  • Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
  • Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).

General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County sets the exact checklist for Durham.

Where to apply in Durham:

Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County

Solar Permit in Durham compared with nearby North Carolina localities

LocalityPermit needed?ThresholdWhat each North Carolina schedule saysVerified
DurhamPermit requiredAny size...Schedule G "Miscellaneous": "Solar panel inspections" "Residential"...
CharlottePermit requiredAny size...permit value under the LUESA Fee Ordinance (revised July 1, 2026), where $3,001 to...
GreensboroPermit requiredAny sizeBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Mecklenburg CountyPermit requiredAny size...as an electrical trade permit priced off total construction value with a $59.70...
RaleighPermit requiredAny size...through June 30, 2027) lists only "Photovoltaic (Solar) - Commercial" at $543.00...

Inspections and closing out your permit

In Durham, inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.

  1. In Durham: where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
  2. In Durham: the inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
  3. In Durham: pV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
  4. In Durham: bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
  5. In Durham: at the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
  6. In Durham: utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Durham permit portal or by phone at 919-560-4144.

Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Durham

In 2025, Durham authorized permits for 4,483 new residential housing units (2,518 single-family, 1,965 in multi-family buildings), valued at $1.3B, up from 2,793 the year before. That works out to about 15.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 285,809.

Frequently asked questions

Do you need a solar permit in Durham?
Solar PV on a house in Durham always needs an electrical permit, because the department requires one to install any electrical wiring, devices, appliances or equipment and charges a $100.00 residential solar panel inspection fee. Its solar handout says a building permit is required for all commercial arrays and for arrays on one- and two-family dwellings "depending on the condition and/or the structural integrity of the roof". Applications go through Dplans with engineer-stamped plans, and residential PV is one of the project types handled by Small Project Review. Always confirm with the Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County before starting.
How much does a solar permit cost in Durham?
Electrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule G "Miscellaneous": "Solar panel inspections" "Residential" $100.00. The solar handout also points to Building Permit Fee Schedule G, whose "Solar Photovoltaic Power Systems Permit" line is $65.00 with a $70.00 review fee, listed under Fire Prevention Construction Permits. See the official fee schedule for current amounts.
Where do you apply for a solar permit in Durham?
You can apply through the Durham permit portal or contact the Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Durham?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Durham applies this before you apply.

From the Library

What else needs a permit in Durham

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependscost of the remodel work on a single-family residenceNo Change to Rough-in": 1-4 fixtures $65.00
Deck PermitIt dependsBefore building a new deck or altering its load-bearing structure...Schedule F "Miscellaneous": "Residential decks (single and two-family)"...
Electrical PermitIt dependsBefore installing, extending, altering or generally repairing any electrical wiring......7/1/18, Includes Technology Surcharge): "Minimum electrical permit fee"...
EV Charger PermitPermit requiredAny size...on individual branch circuits and not covered in other schedules, each" $10.90...
Fence PermitIt dependsOnly when the fence or wall is on a property in a designated flood plain, is used as a...See schedule
HVAC PermitPermit requiredAny size...of a heating/cooling system with any concealed ductwork or component"...
Plumbing PermitIt dependsBefore installing, extending or generally repairing any plumbing systemNo Change to Rough-in": 1-4 fixtures $65.00
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependscost of the roof replacement work on a single-family residence...Surcharge), Schedule F "Miscellaneous": "Residential Reroofing (addition)"...
Shed PermitPermit requiredAny size...Technology Surcharge), Schedule C "Accessory Buildings": "No footing" $50.00...
Water Heater PermitIt dependsBefore installing a new water heater, or replacing one with a change in fuel, location......Technology Surcharge), Schedule E: "Electric water heater (permit required)"...

Solar Permit in other North Carolina localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Durham documents; the office above sets the local rules.

How this solar permit page for Durham was verified. 2 official sources: durhamnc.gov, web.archive.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Solar Permit requirements across North Carolina localities

Solar permit rules nationwide

Look up an existing Durham permit record

Permit required
Get quotes