Deck Permit in Durham, North Carolina
It depends
Sometimes, depending on the project
Before building a new deck or altering its load-bearing structure; replacing only the decking, pickets, railings or stair treads is exempt when the job meets the state's $40,000 exemption.
Quick answer
Building a new deck needs a building permit, because North Carolina law requires a permit for any work that adds, repairs or replaces load-bearing structures whatever it costs. The same statute says no permit is required to replace the pickets, railings, stair treads and decking of porches and exterior decks on a job that otherwise meets its $40,000-or-less exemption. Durham handles residential decks through Small Project Review with its own Additions, Decks and/or Porches checklist, a scaled plot plan, and a $100.00 deck fee.
- Issued by
- Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County
- Phone
- 919-560-4144
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a deck permit costs in Durham
- Fee schedule in force
- Official scheduleRead .
- Published in
- Building Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule F "Miscellaneous":
"Residential decks (single and two-family)" $100.00.
A Planning Zoning fee is also assessed for any deck under Small Project Review.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Durham compares in North Carolina
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Charlotte | Permit required | Any size |
| Durhamthis page | It depends | Before building a new deck or altering its load-bearing structure |
| Greensboro | It depends | Before building a new deck or porch, and before any work on an existing deck beyond... |
| Mecklenburg County | Permit required | Any size |
| Raleigh | It depends | Before building a new deck, screened porch, balcony or covered deck, or altering a... |
| Wake County | It depends | Before building a new deck or porch, or rebuilding deck structure such as framing... |
How to apply in Durham
General guide, not specific to this office
What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County
- 101 City Hall Plaza, Ground Floor, Suite 400, Durham, NC 27701
- Phone: 919-560-4144
- Email: permittechnicians@durhamnc.gov
Your Deck Permit checklist for Durham
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: durhamnc.gov: City County Building Safety.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Durham permit portal.
- Keep the office details handy. Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County. Phone: 919-560-4144. Email: permittechnicians@durhamnc.gov. Address: 101 City Hall Plaza, Ground Floor, Suite 400, Durham, NC 27701.
Compiled from the official sources on this page. Last checked .
Permitting activity in Durham
In 2025, Durham authorized permits for 4,483 new residential housing units (2,518 single-family, 1,965 in multi-family buildings), valued at $1.3B, up from 2,793 the year before. That works out to about 15.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 285,809.
What else needs a permit in Durham
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | cost of the remodel work on a single-family residence | See schedule |
| Electrical Permit | It depends | Before installing, extending, altering or generally repairing any electrical wiring... | Electrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge): "Minimum electrical permit fee" $65.00 |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | Only when the fence or wall is on a property in a designated flood plain, is used as a... | See schedule |
| HVAC Permit | Permit required | Any size | See schedule |
| Plumbing Permit | It depends | Before installing, extending or generally repairing any plumbing system | See schedule |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | It depends | cost of the roof replacement work on a single-family residence | Building Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule F "Miscellaneous": "Residential Reroofing (addition)" $75.00 |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | Electrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule G "Miscellaneous": "Solar panel inspections" "Residential" $100.00 |
| Water Heater Permit | It depends | Before installing a new water heater, or replacing one with a change in fuel, location... | Plumbing Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge), Schedule E: "Electric water heater (permit required)" $65.00 |
Frequently asked questions
- Do you need a deck permit in Durham?
- Sometimes: before building a new deck or altering its load-bearing structure; replacing only the decking, pickets, railings or stair treads is exempt when the job meets the state's $40,000 exemption. If you are unsure how that applies to your project, call the permit office at 919-560-4144 before you start.
- How much does a deck permit cost in Durham?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 23 Oct 2026. For the figure on your own project, call the permit office at 919-560-4144.
- Where do you apply for a deck permit in Durham?
- You can apply through the Durham permit portal or contact the Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in Durham?
- Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Durham applies this before you apply.
From the Library
Deck Permit in other North Carolina localities
Everything above, sourced
How this deck permit page for Durham was verified. 2 official sources: durhamnc.gov, ncleg.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Durham City-County Building & Safety Department (formerly the Durham City-County Inspections Department), a joint City of Durham and Durham County department that issues building, electrical, mechanical and plumbing permits for both the City of Durham and unincorporated Durham County. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page