Solar Permit in Charlotte, North Carolina

Permit required

Yes, a permit is required

Before installing a ground-mounted, pole-mounted or roof-mounted photovoltaic array.

Quick answer

Solar always needs a Mecklenburg County permit in Charlotte, because a photovoltaic array is an addition to the electrical system and the county's $40,000 residential exemption expressly does not reach the addition, replacement or change in the design of an electrical system. The county runs a dedicated Residential Solar/PV permit record type in AccelaMeck covering ground-, pole- and roof-mounted panels, and its own application guide notes that a Solar/PV permit requires an electrical contractor. Inspection is handled by the county's Residential Multi-Trade Inspections team, which explicitly covers residential photovoltaic (PV) systems. The City of Charlotte adds a Land Development Individual Residential Lot review for a detached solar panel, and Unified Development Ordinance Section 17.2.M's screening rules for ground-mounted panels do not apply to single-family, duplex, triplex or quadraplex dwellings on individual lots.

Issued by
Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center.
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your North Carolina Licensing Board for General Contractors (NCLBGC) license active, and under which business name? Verify it on portal.nclbgc.org.

North Carolina's owner-builder rule (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Charlotte

Fee schedule in force
Official scheduleRead .
  • Solar has no dedicated line item.
  • The county permit is charged off total construction permit value under the LUESA Fee Ordinance (revised July 1, 2026), where $3,001 to $50,000 is $59.70 plus $12.19 per $1,000 or part over $3,000 and $50,001 to $100,000 is $632.57 plus $5.49 per $1,000 or part over $50,000.
  • A ground-mounted or pole-mounted array that needs the City of Charlotte LDIRL pays $155 Residential Zoning under the FY 2027 Individual Residential Lot Fee Schedule, plus any Urban Forestry tree preservation tier of $180, $350 or $405.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Charlotte compares in North Carolina

No North Carolina jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Charlottethis pagePermit requiredSee schedule
DurhamPermit requiredSee schedule
GreensboroPermit requiredBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Mecklenburg CountyPermit requiredPermits are priced off total construction permit value: $59.70 for $1 to $3,000 on projects not requiring plan review; the schedule has the rest
RaleighPermit requiredSee schedule
Wake CountyPermit requiredSee schedule

How to apply in Charlotte

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center.

  • Mecklenburg County Code Enforcement, LUESA Business Office, 2145 Suttle Ave., Charlotte, NC 28208, open Monday to Friday 8 a.m. to 5 p.m. City of Charlotte zoning permitting and the CLT Development Center are at the Charlotte Mecklenburg Government Center, 600 East Fourth Street, Charlotte, NC 28202.
  • Phone: 980-314-2633
  • Email: Code@MeckNC.gov

What else needs a permit in Charlotte

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsAny time permanent wiring, devices or equipment in or attached to the house or an...See schedule
Fence PermitIt dependsBefore building a fence or wall along the border of, or bounding on, a city street or...See schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitPermit requiredAny sizeSee schedule
Plumbing PermitIt dependsBefore adding to or changing the design of the plumbing system, moving or adding...See schedule
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependsBefore a reroof that changes the material type, adds roofing rather than replacing it...See schedule
Shed PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a solar permit in Charlotte?
Yes, before installing a ground-mounted, pole-mounted or roof-mounted photovoltaic array. If you are unsure how that applies to your project, call the permit office at 980-314-2633 before you start.
How much does a solar permit cost in Charlotte?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 980-314-2633.
Where do you apply for a solar permit in Charlotte?
You can apply through the Charlotte permit portal or contact the Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center. directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Charlotte?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Charlotte applies this before you apply.

From the Library

Solar Permit in other North Carolina localities

Everything above, sourced

How this solar permit page for Charlotte was verified. 1 official source: code.mecknc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Mecklenburg County Land Use and Environmental Services Agency (LUESA), Code Enforcement Division, which issues the building, electrical, mechanical and plumbing permits inside the City of Charlotte. Zoning review, the Unified Development Ordinance, the Land Development Individual Residential Lot (LDIRL) permit and zoning use permits come from City of Charlotte Planning, Design and Development through the CLT Development Center. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project