North Carolina / Greensboro

Pool Permit in Greensboro, North Carolina

Permit required

Yes, a permit is required

Before installing a residential swimming pool, and separately before the pool wiring and bonding are run.

Quick answer

A residential swimming pool in Greensboro needs a building permit. The city's rule is that a permit is required any time you cover new ground and pool is one of the five examples it names, and the Residential Plan Review page then puts pools on the full-plans track alongside in-law units, pool houses, studios and sunroom additions. A separate electrical permit is required for the pool, priced as its own line item on the electrical fee schedule. Zoning adds limits under Land Development Ordinance 30-8-11.9: on a single-family or two-family lot under one acre the pool must sit behind the principal structure, no closer than 5 feet to any property line measured from the edge of water, and at least 5 feet from any other structure or pool, with barrier fencing referred out to the North Carolina State Building Code.

Issued by
City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections)
From an official source Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a pool permit costs in Greensboro

Fee schedule in force
Official scheduleRead .
Published in
Building Permit Fee Schedule, Document #1005 dated 12/19/24:

'Minimum permit fee - $85'. The residential Alt/Add column charges the $85.00 minimum on construction values up to $11,000 and rises above that ($88.00 at $12,000, $127.00 at $25,000, $302.00 at $100,000, then '$100,000 - 500,000 = $302.00 PLUS $2.00 PER $1,000'). 'STATE LICENSED CONTRACTORS: Add $10.00 to all Residential Permits'. 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. The department page adds that 'The minimum permit fee for building, electrical, mechanical, and plumbing permits has increased from $75 to $85.'

Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Residential Swimming Pool 65.00 ea.', with 'Minimum Permit Fee 85.00' and 'Extra Inspection Fee, First Follow-up 45.00'.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Greensboro compares in North Carolina

JurisdictionPermit needed?Threshold
CharlottePermit requiredAny size
DurhamPermit requiredAny size
Greensborothis pagePermit requiredAny size
Mecklenburg CountyPermit requiredAny size
RaleighIt dependswater a pool, spa or hot tub can hold
Wake CountyIt dependswater the pool, hot tub or spa is able to hold

How to apply in Greensboro

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections)

  • Development Services, Melvin Municipal Office Building, Upper Ground Level, Room UG10, 300 W. Washington St., Greensboro, NC 27401
  • Phone: 336-373-2155
  • Email: DevelopmentServices2@greensboro-nc.gov

Permitting activity in Greensboro

In 2025, Greensboro authorized permits for 1,972 new residential housing units (906 single-family, 1,066 in multi-family buildings), valued at $411M, up from 1,954 the year before. That works out to about 6.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,878.

What else needs a permit in Greensboro

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsBefore building a new deck or porch, and before any work on an existing deck beyond...Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Electrical PermitIt dependsBefore adding, replacing or redesigning electrical wiring, devices, appliances or...Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00'
HVAC PermitPermit requiredAny sizeMechanical Permit Fee Schedule, Document #4200 dated 7/16/24: 'Minimum Inspection Fee $ 85.00'
Patio PermitIt dependsBefore building an elevated patio that needs retaining walls or foundation walls, and...Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Plumbing PermitIt dependsBefore adding to or altering the drainage, waste, vent, water service or water...Plumbing Permit Fee Schedule, Document #4300 dated 7/16/24: 'Minimum Permit/Inspection Fee $ 85.00'
Roof Replacement PermitIt dependscost of the construction, installation, repair, replacement or alterationBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Shed PermitIt dependslength, width or height of the accessory buildingBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'
Solar PermitPermit requiredAny sizeBuilding Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85'

Frequently asked questions

Do you need a pool permit in Greensboro?
Yes, before installing a residential swimming pool, and separately before the pool wiring and bonding are run. If you are unsure how that applies to your project, call the permit office at 336-373-2155 before you start.
How much does a pool permit cost in Greensboro?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 336-373-2155.
How long does a pool permit take in Greensboro?
Ten to 14 business days for the full residential plan review track, depending on Planning Department approval of the site plan. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a pool permit in Greensboro?
You can apply through the Greensboro permit portal or contact the City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections) directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Greensboro?
Under North Carolina law (N.C. Gen. Stat. 87-1(a), 87-1(b)(2), 87-14(a)(1), 160D-1113, 160D-1115): A North Carolina homeowner may pull the permit and do the work. G.S. 87-1(a) reaches general contracting only where the cost of the undertaking is $40,000 or more, and G.S. 87-1(b)(2) then exempts a person who constructs or alters a building on land that person owns, provided the building is intended solely for occupancy by that person and his family after completion and the person complies with G.S. 87-14. There is no outright ban on selling, but there is a look-back that works like one: if the building is not occupied solely by the person and his family for at least 12 months following completion, the statute presumes the person did not intend the building solely for that occupancy, which defeats the exemption. G.S. 87-14(a)(1) requires an owner claiming the exemption to execute a verified affidavit attesting that they own the property, that they will personally superintend and manage all aspects of the construction and will not delegate that duty to anyone unlicensed, and that they will be personally present for all inspections required by the State Building Code unless a licensed architect sealed the plans. The inspector transmits that affidavit to the Licensing Board, and if the Board determines the exemption was not available the building permit is revoked under G.S. 160D-1115. The exemption removes the general contractor license requirement only. It does not exempt the work from permits or inspections, and G.S. 160D-1113 provides that when a permit is held by an owner exempt under 87-1(b)(2), no inspection may be conducted without the owner present unless an architect sealed the plans. Confirm how Greensboro applies this before you apply.

From the Library

Pool Permit in other North Carolina localities

Everything above, sourced

How this pool permit page for Greensboro was verified. 2 official sources: greensboro-nc.gov, greensboro-nc.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections). Rules change; confirm before you build. How we verify.