Building permits in Greensboro, North Carolina
Of the 9 common home projects we have verified in Greensboro, 3 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 9of 10 we cover in Greensboro
Look up a permit in Greensboro
Greensboro runs an online permit portal. We have not confirmed what its record search covers.
How to get a building permit in Greensboro
In Greensboro, the Building Inspection Division of the city’s Engineering and Inspections Department issues every permit, through Development Services, the one-stop counter for residential plan review, inspections and permits. Jobs that need plan review are filed in the city’s online Plan Review & Tracking system, where you upload plans, follow the review and pay for and download the permit; interior-only alterations are applied for in person.
Where the office is and when it is open
Development Services is in the Melvin Municipal Office Building, Upper Ground (UG) Level, 300 W. Washington St., Greensboro, NC 27401: turn left after entering the building. Free parking is in the City/County lot at the corner of W. Washington and Eugene streets. Business hours are Mondays to Fridays, 8 am to 5 pm; call 336-373-2155.
Applying online in Greensboro
- Decide who pulls the permit. As a homeowner you can get a building permit for your own home if you own and live in it (bring proof), sign an affidavit of ownership, the house is not for sale or lease now or for at least one year after completion, and you oversee the work. For plumbing, mechanical or electrical work you must do it yourself.
- Check whether you need plan review. A deck, addition, accessory building, garage or pool covers new ground and needs a building permit and a site plan review; every trade needs its own separate permit.
- Draw a site plan to scale. With the Plans Examiner’s approval, decks, porches, unheated storage rooms and sheds may need only limited building plans, though field inspectors may ask for more plans or engineering at inspection.
- For a shed or other accessory building, fill in the Residential Accessory Building Permit Application: its size, cost and use. If any dimension is over 12 feet the building must meet the full North Carolina Residential Code, and concrete or masonry foundations are required only above 400 square feet or one story. The form opens with a “Pre-Inspection Meeting Required” box for a plan examiner’s name and date.
- Upload the application and plans in Plan Review & Tracking, follow the review there, then pay for and download the permit.
- For interior alterations only, bring a completed Residential Building Permit Application and photo ID (a North Carolina driver’s license or ID) to the counter and pay by check, cash or credit card.
What five common projects cost here
From the city’s three fee schedules: building (Document #1005 12/19/24), plumbing and electrical (both 7/16/24). The minimum permit fee is $85. State licensed contractors add $10.00 to every residential building permit.
- Shed: the building schedule does not name sheds. Its column headed “Residential - New Homes and Detached Garages” names garages, not sheds, and starts at $86.25 for a $1,000 value, while the residential Alt/Add column starts at $85.00; ask Development Services which column it will use. Read 17 Nov 2026.
- Plumbing: $85.00 minimum permit and inspection fee. Fixtures are priced per unit, such as $7.00 for a water heater or sewer; a backflow preventer is $15.00 and a gas connection for a replacement water heater $10.00. The fees apply to old work as well as new. Read 17 Nov 2026.
- Electrical: $85.00 minimum. A service change is $74.00 at 100 amps, $99.00 at 200 and $131.00 at 400; outlets are $0.30 each, a panel $10.00, a water heater $10.00 and a residential swimming pool $65.00. Read 17 Nov 2026.
- Deck: the residential Alt/Add column charges the $85.00 minimum on values up to $11,000, then $88.00 at $12,000, $127.00 at $25,000 and $302.00 at $100,000. Read 17 Nov 2026.
- Patio: the same Alt/Add column, from the $85.00 minimum up to $11,000. An elevated patio that needs retaining or foundation walls counts as an addition and needs site plan review; the city does not say whether a flat, on-grade patio needs a permit. Read 17 Nov 2026.
A first follow-up inspection costs $45.00 on the plumbing and electrical schedules.
How long review takes
The city publishes a time for each path. Limited review (decks, porches, unheated garages, sheds): five or more business days, depending on Planning approval of the site plan; with no site plan, the permit is issued immediately. Full review (habitable or heated space, pools, pool houses): ten to 14 business days. The page lists accessory buildings under both, so ask which yours gets. Check status on the Development Activity tab.
Inspections, in order
Schedule building, electrical, mechanical and plumbing inspections by phone through APRIL at 336-373-2400, a 24-hour automated line, or online from the city’s scheduling page. You need the seven-digit permit number from the permit card. Requests must be in by 8 pm the business day before. Keep the permit card at the job and make sure inspectors sign it: their laptops update only morning and late afternoon, so the card is how the next inspector knows what passed. Each trade is inspected under its own permit.
What needs no permit in Greensboro
The city’s residential construction page says work costing $40,000 or less needs no building permit unless it adds, repairs or replaces load-bearing structure, adds or changes the design of plumbing, or adds, replaces or changes the design of heating, air conditioning or electrical work. No permit is needed to replace:
- Windows, doors or exterior siding.
- Pickets, railings, stair treads and decking on porches and exterior decks.
- Plumbing that does not change size or capacity.
- Electrical devices and lighting fixtures, like for like.
- Roofing, as a replacement rather than an addition.
If the work already started
The building fee schedule says building permit fees will be doubled if work is begun before securing a permit. What North Carolina law says about building without a permit.
Checklist before you apply
- Proof that you own and live in the house, if you are applying as the homeowner.
- A site plan drawn to scale for any deck, addition, shed, garage or pool.
- The Residential Accessory Building Permit Application for a shed, with its cost and dimensions.
- Your construction cost, which sets the fee.
- A Plan Review & Tracking account for uploads and payment.
- Photo ID and payment for an interior-only permit at the counter.
- Your permit number, for APRIL at 336-373-2400.
Greensboro documents read for this guide
- Office page: Development Services, read
- Office page: Residential Construction, read
- Office page: Residential Plan Review, read
- Fee schedule: City of Greensboro Building Permit Fee Schedule (Document #1005 12/19/24), read
- Fee schedule: Plumbing Permit Fee Schedule (Document #4300 7/16/24), read
- Fee schedule: Electrical Permit Fee Schedule (Document #4100 7/16/24), read
- Inspections: APRIL Automated Response System, read
- Application: Residential Accessory Building Permit Application, read
What needs a permit in Greensboro
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Before building a new deck or porch, and before any work on an existing deck beyond... | Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' |
| Electrical Permit | It depends | Before adding, replacing or redesigning electrical wiring, devices, appliances or... | Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00' |
| Fence Permit | Not confirmed | Not confirmed | Not published |
| HVAC Permit | Permit required | Any size | Mechanical Permit Fee Schedule, Document #4200 dated 7/16/24: 'Minimum Inspection Fee $ 85.00' |
| Patio Permit | It depends | Before building an elevated patio that needs retaining walls or foundation walls, and... | Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' |
| Plumbing Permit | It depends | Before adding to or altering the drainage, waste, vent, water service or water... | Plumbing Permit Fee Schedule, Document #4300 dated 7/16/24: 'Minimum Permit/Inspection Fee $ 85.00' |
| Pool Permit | Permit required | Any size | Its value table starts at $85.00 in the residential Alt/Add column and $86.25 in the new construction column for a $1,000 value; the schedule has the rest |
| Roof Replacement Permit | It depends | cost of the construction, installation, repair, replacement or alteration | Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' |
| Shed Permit | It depends | length, width or height of the accessory building | It lists 'Residential - New Homes and Detached Garages' with new construction, whose column starts at $86.25 for a $1,000 value; the schedule has the rest |
| Solar Permit | Permit required | Any size | Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' |
Planning a project in Greensboro?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Greensboro permit fees compared with nearby North Carolina localities
| North Carolina locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Greensboro | Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' | Mechanical Permit Fee Schedule, Document #4200 dated 7/16/24: 'Minimum Inspection Fee $ 85.00' | Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00' |
| Charlotte | See schedule | See schedule | See schedule |
| Durham | See schedule | See schedule | Electrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge): "Minimum electrical permit fee" $65.00 |
| Mecklenburg County | See schedule | See schedule | See schedule |
Each cell is taken from that North Carolina jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Greensboro penalty for work started without a permit
Greensboro publishes what it charges when work begins before the permit, quoted here from the schedule or permit page we verified.
-
'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'.
Greensboro deck permit page · last checked
The North Carolina statute, the after-the-fact permit path and who may pull the permit: building without a permit in North Carolina.
Greensboro permit questions, answered from the data
- Do you need a permit in Greensboro?
- It depends on the project. Of the 10 permit types we cover in Greensboro, 3 always require a permit (for example an HVAC permit) and 6 depend on size or scope (a deck permit, for instance), and 1 is not confirmed. Each Greensboro permit type's page states the exact rule and its source.
- How much does a permit cost in Greensboro?
- Greensboro publishes a fee for 9 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections); we do not estimate or mark them up.
- Where do you apply for a permit in Greensboro?
- City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections) issues permits in Greensboro and has an online permit portal, and takes questions at 336-373-2155. The Greensboro official page and portal are linked in the office section above.
- What is the penalty for building without a permit in Greensboro?
- Greensboro publishes its own charge for work started before the permit: 'DOUBLE PERMIT FEE: BUILDING PERMIT FEES WILL BE DOUBLED IF WORK IS BEGUN BEFORE SECURING A PERMIT'. That is the local bill; the North Carolina statute, the after-the-fact permit path and who may pull the permit are on the North Carolina building-without-a-permit page.
How the Greensboro pages were verified. 10 permit types, 6 distinct official sources, most recently checked . Every rule is read from City of Greensboro Engineering and Inspections Department, Development Services Division (Building Inspections) or the applicable code and cited on its page; anything we could not confirm for Greensboro is marked rather than estimated. How we verify.
Permitting activity in Greensboro
In 2025, Greensboro authorized permits for 1,972 new residential housing units (906 single-family, 1,066 in multi-family buildings), valued at $411M , up from 1,954 the year before. That works out to about 6.6 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,878.