Building permits in Wake County, North Carolina
Of the 9 common home projects we have verified in Wake County, 3 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 9of 10 we cover in Wake County
Look up a permit in Wake County
Wake County runs an online permit portal. We have not confirmed what its record search covers.
How to get a building permit in Wake County
Wake County Permits and Inspections issues building permits for all unincorporated areas of Wake County. It also inspects for Knightdale, Rolesville, Wendell and Zebulon, but if you live inside one of those towns you apply through the town. Look up your parcel on the county’s iMaps: “WC” as the planning jurisdiction means you file in the county’s 24-hour Permit Portal.
Where the office is and when it is open
The office is on the First Floor of the Waverly F. Akins Wake County Office Building, 336 Fayetteville St., Raleigh (mail to P.O. Box 550, Raleigh, NC 27602). Call 919-856-6222 or email Wake.Permitting@wake.gov. Office hours are 8:15 a.m. to 5 p.m., Monday to Friday; field inspectors work 7:15 a.m. to 4 p.m.
Applying online in Wake County
- On the Permit Portal log-in page, choose “Create a New Account”, enter your email, click the link in the confirmation email and set a password.
- Start the application. It is issued a permit number on the spot, and the county’s Permit Technicians then review it; while they do, it sits on the “Pending” tab of your dashboard.
- Upload a site plan: the whole lot to scale, every existing and proposed structure with distances to fixed points, driveways and patios, any well or septic field, water features and easements, and all impervious surfaces in square feet and as a percentage of the lot. The county suggests starting from the survey from a recent mortgage or refinance closing.
- Upload building plans, and a workers’ compensation certificate or exemption affidavit if a contractor is involved. If you own the property and are acting as general contractor on a project costing $40,000 or more, add the notarized owner-contractor affidavit. You may be your own general contractor if you own the property and will live in it for 12 months after completion.
- Pools: add the Residential Swimming Pool Installation and Inspection Affidavit; a deck carrying a hot tub needs an engineer letter or stamped plans.
- Pay the invoices in the portal. When the permit is issued you get an email; print the stamped plans from the “Attachment” tab.
A septic-served lot needs the location checked against the drain field and repair area, which may mean a field consultation fee and a staff visit.
What five common projects cost here
From the county’s Permits & Inspections Fee Schedule. Wake issues a single permit for each project, and the residential fee includes all trades and a temporary electrical pole. Watershed Management adds a $50 review where there are flood hazard areas or too much impervious surface, and a licensed general contractor building or altering a single-family home pays a $10 Homeowner Recovery Fee.
- Shed: a shed with any dimension over 12 feet needs the building permit, $75 plus $0.25 per square foot of gross floor area. A smaller one needs no building permit but may need a Land Use Permit from Planning & Zoning, whose fee list (as of 1/1/22) prices a Zoning Permit at $50. Read 18 Nov 2026.
- Plumbing: $75, one trade permit fee covering electrical, mechanical and plumbing however many trades are involved. Read 17 Nov 2026.
- Deck: decks are named in the additions and accessory structures line: $75 plus $0.25 per square foot of gross floor area. Read 17 Nov 2026.
- Electrical: the same $75 residential trade permit fee. Read 17 Nov 2026.
- Pool: $75 for an above-ground pool, hot tub or spa; $300 for an in-ground pool, both including all trades and 2 electrical grounding inspections. Read 17 Nov 2026.
Amending a permit or revising the site plan costs $60.
How long review takes
The county posts no review time for residential permits. Your application stays on the portal’s “Pending” tab while the Permit Technicians review it, and an automated email tells you when the permit is issued.
Inspections, in order
Schedule, cancel and see results in the Permit Portal. Request by 3:00 p.m. the business day before for a next-day inspection. The county’s inspection guidance lists them in this order: temporary pole, footing (setbacks met, trenches dug, steel tied; a 10’ x 30’ x 6” sand or gravel construction driveway and erosion devices must already be in), foundation, under-slab, electrical, plumbing and mechanical rough-ins, framing once every rough-in is approved, insulation, the trade finals, then the final building inspection. Deck footings can be requested on their own.
The county lists what fails inspections most: footings poured, insulation installed, drywall hung or trade work covered before the earlier inspection passes; no permit box or permit number posted; standing water or debris in footing trenches. Re-inspections cost $100, $200, $300, then $400 for the fourth and later, and must be paid before the next one is scheduled; 15 or more failed items on a second or later re-inspection add $150.
What needs no permit in Wake County
The county’s FAQ lists:
- Nonstructural work under $40,000 in a single-family home, unless it changes plumbing, mechanical or electrical systems.
- Accessory buildings where no dimension exceeds 12 feet.
- Replacing windows, doors and exterior siding.
- Replacing pickets, railings, stair treads and decking on porches and decks.
- Replacing a water heater in a one- or two-family home with one of no greater input, same fuel and same venting, installed by a licensed plumbing contractor.
If the work already started
Wake’s fee schedule, FAQ and permit guidance publish no after-the-fact procedure or fee. Call Permits and Inspections at 919-856-6222 before applying for work that is already built or covered. What North Carolina law says about building without a permit.
Checklist before you apply
- “WC” as your planning jurisdiction on iMaps.
- A Permit Portal account with a verified email.
- A site plan to scale with impervious surface in square feet and as a percentage.
- Building plans, and the workers’ compensation certificate or exemption affidavit.
- The notarized owner-contractor affidavit for $40,000 or more.
- Your shed’s longest dimension: over 12 feet means a building permit.
- A permit box with the address and permit number at the site before the footing inspection.
Wake County documents read for this guide
- Office page: Permits and Inspections, read
- Permit portal: Permit Portal Guide & Tutorials, read
- Fee schedule: Permits & Inspections Fee Schedule, read
- Fee schedule: Planning and Development Fees (As of 1/1/22), read
- Inspections: Inspection Guidance, read
- Inspections: Common Building Inspection Turndown Reasons, read
- Office page: Build an Accessory Building, read
- Office page: Permits and Inspections FAQ, read
What needs a permit in Wake County
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Before building a new deck or porch, or rebuilding deck structure such as framing... | See schedule |
| Electrical Permit | It depends | Before installing, extending, altering or generally repairing electrical wiring... | See schedule |
| Fence Permit | Not confirmed | Not confirmed | Not published |
| HVAC Permit | Permit required | Any size | See schedule |
| Patio Permit | Permit required | Any size | See schedule |
| Plumbing Permit | It depends | Before installing, extending, relocating, replacing or generally repairing any plumbing... | See schedule |
| Pool Permit | It depends | water the pool, hot tub or spa is able to hold | See schedule |
| Roof Replacement Permit | It depends | When the re-roof is not purely nonstructural, when load-bearing roof structure is... | See schedule |
| Shed Permit | It depends | any dimension of the detached accessory building | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Planning a project in Wake County?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Wake County permit fees compared with nearby North Carolina localities
| North Carolina locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Wake County | See schedule | See schedule | See schedule |
| Charlotte | See schedule | See schedule | See schedule |
| Durham | See schedule | See schedule | Electrical Permit Fee Schedule (Effective 7/1/18, Includes Technology Surcharge): "Minimum electrical permit fee" $65.00 |
| Greensboro | Building Permit Fee Schedule, Document #1005 dated 12/19/24: 'Minimum permit fee - $85' | Mechanical Permit Fee Schedule, Document #4200 dated 7/16/24: 'Minimum Inspection Fee $ 85.00' | Electrical Permit Fee Schedule, Document #4100 dated 7/16/24: 'Minimum Permit Fee 85.00' |
Each cell is taken from that North Carolina jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Wake County permit questions, answered from the data
- Do you need a permit in Wake County?
- It depends on the project. Of the 10 permit types we cover in Wake County, 3 always require a permit (for example an HVAC permit) and 6 depend on size or scope (a deck permit, for instance), and 1 is not confirmed. Each Wake County permit type's page states the exact rule and its source.
- How much does a permit cost in Wake County?
- Wake County publishes a fee for 9 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Wake County Permits and Inspections (Planning and Development Services); we do not estimate or mark them up.
- Where do you apply for a permit in Wake County?
- Wake County Permits and Inspections (Planning and Development Services) issues permits in Wake County and has an online permit portal, and takes questions at 919-856-6222. The Wake County official page and portal are linked in the office section above.
How the Wake County pages were verified. 10 permit types, 6 distinct official sources, most recently checked . Every rule is read from Wake County Permits and Inspections (Planning and Development Services) or the applicable code and cited on its page; anything we could not confirm for Wake County is marked rather than estimated. How we verify.
Permitting activity in Wake County
In 2025, Wake County authorized permits for 13,806 new residential housing units (8,392 single-family, 5,414 in multi-family buildings), valued at $3.5B , down from 15,248 the year before. That works out to about 11 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,257,235.