Fence Permit in St. Louis, Missouri

It depends

Sometimes, depending on the project

Before building any new fence. A like-for-like replacement of an existing fence at the same height, material and location does not need one, but a fence enclosing a pool, hot tub or spa always does.

Quick answer

The City of St. Louis is an independent city, not part of St. Louis County, and the two run completely separate building departments, so a St. Louis County or Clayton permit page does not apply to an address inside the city and vice versa. The City Building Division requires a building permit for "all new fences of any type", with one exemption: replacing an existing fence at the same height, material and location. Title 25 of the Revised Code narrows that exemption further, withdrawing it when the fence encloses a swimming pool, hot tub or spa. In a City Historic District or at a City Landmark, all fences also need Cultural Resources Office approval even where the Building Code alone would not require a permit.

Issued by
City of St. Louis Building Division, Permit Section (Department of Public Safety)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in St. Louis

Fee schedule in force
Official scheduleRead .
  • A fence is permitted as a Miscellaneous Structures Permit under Section 109.2.3 of the City Building Code. The Building Division's published building permit schedule charges a $25.00 application fee plus a permit fee based on estimated construction cost: $19.00 for $0 to $1,000.00 (total $44.00), $23.00 for $1,001 to $2,000.00 (total $48.00), $30.00 for $2,001 to $3,000.00 (total $55.00), and above $3,000.00 the permit fee is "$10.00 per thousand estimated construction cost or fraction thereof".
  • Only the application fee is due at filing;
  • the permit fee is collected when the permit is ready to issue.
  • All building permit fees are non-refundable.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in St. Louis

General guide, not specific to this office

What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of St. Louis Building Division, Permit Section (Department of Public Safety)

  • Building Division Permit Section, City Hall, 1200 Market Street, Room 425, St. Louis, MO 63103
  • Phone: (314) 622-3313
  • Email: stlcitypermits@stlouis-mo.gov

Fence Permit in St. Louis compared with nearby Missouri localities

LocalityPermit needed?ThresholdWhat each Missouri schedule saysVerified
St. LouisIt dependsBefore building any new fenceSee schedule
Kansas CityNo permit neededExemptSee schedule

Permitting activity in St. Louis

In 2025, St. Louis authorized permits for 272 new residential housing units (57 single-family, 215 in multi-family buildings), valued at $51M, down from 294 the year before. That works out to about 0.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,645.

What else needs a permit in St. Louis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsinches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundationCharged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest
Electrical PermitIt dependsBefore starting any electrical work other than the code's listed minor repairs, and...The application fee for all electrical permits is $25.00
HVAC PermitIt dependsBefore installing or replacing a furnace, condensing unit, combination system, boiler...There is a $25.00 application fee for each permit
Patio PermitIt dependsNot needed for a flat, open, at-grade paved patio on the same lot as the houseSee schedule
Plumbing PermitIt dependsBefore any plumbing, drainlaying or process drainage work, any connection to a sewer...The application fee for all plumbing permits is $30.00
Pool PermitIt dependsinches of water depth, applied together with a 250 square foot surface area testCharged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest
Roof Replacement PermitIt dependspercent of roof sheathing removed and replaced during a like-material roof covering replacementSee schedule
Shed PermitIt dependssquare feet of floor area for a detached accessory building, which must also keep the setbacks required by the Zoning OrdinanceSee schedule
Solar PermitPermit requiredAny sizeCharged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00; the schedule has the rest

Frequently asked questions

Do you need a fence permit in St. Louis?
Sometimes: before building any new fence. A like-for-like replacement of an existing fence at the same height, material and location does not need one, but a fence enclosing a pool, hot tub or spa always does. If you are unsure how that applies to your project, call the permit office at (314) 622-3313 before you start.
How much does a fence permit cost in St. Louis?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at (314) 622-3313.
Where do you apply for a fence permit in St. Louis?
You can apply through the St. Louis permit portal or contact the City of St. Louis Building Division, Permit Section (Department of Public Safety) directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in St. Louis?
Under Missouri law (RSMo 701.055.1 and 701.055.2; RSMo 327.101.2(5)(a); RSMo 327.191.2(5)(a); RSMo 700.656.5): Missouri does not license general contractors at the state level and has no statewide owner-builder permit statute, disclosure affidavit, or resale restriction comparable to Florida's one year rule. Whether a homeowner may pull the permit and do the work is decided by the city or county that issues the permit. Where state law does speak, it is permissive: RSMo 327.101.2(5)(a) and RSMo 327.191.2(5)(a) let an unlicensed person render architectural and engineering services for the construction, remodeling or repair of a privately owned dwelling house, provided the drawings say the person is not licensed, so plans for a house do not have to be sealed by an architect or engineer. RSMo 701.055.1 expressly preserves a property owner's right to install, modify or repair their own on-site sewage disposal system as long as the state standard is met, and RSMo 701.055.2 adds that no permit or contractor registration is required simply to clean it. RSMo 700.656.5 exempts a person who installs a manufactured home on his or her own property for his or her own occupancy from the otherwise mandatory state installer license. None of these exemptions excuses a local permit where the local jurisdiction requires one. Confirm how St. Louis applies this before you apply.

From the Library

Fence Permit in other Missouri localities

Everything above, sourced

How this fence permit page for St. Louis was verified. 2 official sources: stlouis-mo.gov, stlouis-mo.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of St. Louis Building Division, Permit Section (Department of Public Safety). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page