Fence Permit in St. Louis, Missouri

It depends

Sometimes, depending on the project

Before building any new fence. A like-for-like replacement of an existing fence at the same height, material and location does not need one, but a fence enclosing a pool, hot tub or spa always does.

Confirmed on official page Verified City of St. Louis Building Division, Permit Section (Department of Public Safety)

By Mario Bailey, verified against official sources

Quick answer

The City of St. Louis is an independent city, not part of St. Louis County, and the two run completely separate building departments, so a St. Louis County or Clayton permit page does not apply to an address inside the city and vice versa. The City Building Division requires a building permit for "all new fences of any type", with one exemption: replacing an existing fence at the same height, material and location. Title 25 of the Revised Code narrows that exemption further, withdrawing it when the fence encloses a swimming pool, hot tub or spa. In a City Historic District or at a City Landmark, all fences also need Cultural Resources Office approval even where the Building Code alone would not require a permit.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building any new fence. A like-for-like replacement of an existing fence at the same height, material and location does not need one, but a fence enclosing a pool, hot tub or spa always does.

What a fence permit costs in St. Louis

Line item
fence permitBy formulaA fence is permitted as a Miscellaneous Structures Permit under Section 109.2.3 of the City Building Code. The Building Division's published building permit schedule charges a $25.00 application fee plus a permit fee based on estimated construction cost: $19.00 for $0 to $1,000.00 (total $44.00), $23.00 for $1,001 to $2,000.00 (total $48.00), $30.00 for $2,001 to $3,000.00 (total $55.00), and above $3,000.00 the permit fee is "$10.00 per thousand estimated construction cost or fraction thereof". Only the application fee is due at filing; the permit fee is collected when the permit is ready to issue. All building permit fees are non-refundable.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in St. Louis

Most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own.

What most fence permit applications include:

  • A fence 7 feet or under is exempt from the model code's building permit, the same threshold the IRC uses for other small projects (IRC 2021 R105.2).
  • That exemption only removes the building-code permit. It does not authorize skipping a jurisdiction's own zoning approval, which is why an exempt fence can still need its own land-use or zoning permit rather than a building permit (IRC 2021 R105.2).
  • Whatever your jurisdiction calls that approval, the application centers on a basic site plan: a drawing of the property showing the fence's location, height, and material, and how it relates to the property lines (common local zoning practice).
  • The same plan is checked against required setbacks and, on corner lots or near intersections, a sight-triangle rule that caps fence height so it does not block sightlines for drivers (common local zoning practice).
  • A fence that will serve as a required swimming-pool barrier is handled as life-safety work rather than the light zoning process, and at least one state's adopted residential code requires a building permit for barrier fences regardless of the general fence exemption (Oregon Residential Specialty Code 2021, R101.2.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Section R105.2. Source. City of St. Louis Building Division, Permit Section (Department of Public Safety) sets the exact checklist for St. Louis.

Where to apply in St. Louis:

City of St. Louis Building Division, Permit Section (Department of Public Safety)

  • Building Division Permit Section, City Hall, 1200 Market Street, Room 425, St. Louis, MO 63103
  • Phone: (314) 622-3313
  • Email: stlcitypermits@stlouis-mo.gov

Inspections and closing out your permit

Inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.

  1. Inspection duty attaches only to work for which a permit is required, so a fence that qualified for the permit exemption carries no inspection obligation under the model code (IRC 2021 R109.1).
  2. Where a fence permit was issued, the process skips the staged foundation, frame, and rough-in inspections used for buildings and goes straight to one final inspection once the fence is finished (IRC 2021 R109.1.6).
  3. That single check is typically a zoning compliance inspection rather than a structural review, confirming the fence matches the approved height and site plan (common local practice).
  4. A fence built as a swimming-pool barrier breaks that light-touch pattern: it is separately inspected for barrier compliance, commonly required before the pool itself can be signed off (ISPSC 305; local pool-barrier inspection programs).
  5. That barrier inspection checks dimensional rules from the swimming pool and spa code rather than ordinary fence rules, including the minimum 48 inch barrier height and limits on openings and gaps a young child could pass through (ISPSC 305).
  6. Gate hardware is inspected too: a self-closing, self-latching gate is part of the barrier requirement, since an unlatched gate defeats the fence's purpose as a barrier (ISPSC 305).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the St. Louis permit portal or by phone at (314) 622-3313.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109, and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a fence permit in St. Louis?
The City of St. Louis is an independent city, not part of St. Louis County, and the two run completely separate building departments, so a St. Louis County or Clayton permit page does not apply to an address inside the city and vice versa. The City Building Division requires a building permit for "all new fences of any type", with one exemption: replacing an existing fence at the same height, material and location. Title 25 of the Revised Code narrows that exemption further, withdrawing it when the fence encloses a swimming pool, hot tub or spa. In a City Historic District or at a City Landmark, all fences also need Cultural Resources Office approval even where the Building Code alone would not require a permit. Always confirm with the City of St. Louis Building Division, Permit Section (Department of Public Safety) before starting.
How much does a fence permit cost in St. Louis?
A fence is permitted as a Miscellaneous Structures Permit under Section 109.2.3 of the City Building Code. The Building Division's published building permit schedule charges a $25.00 application fee plus a permit fee based on estimated construction cost: $19.00 for $0 to $1,000.00 (total $44.00), $23.00 for $1,001 to $2,000.00 (total $48.00), $30.00 for $2,001 to $3,000.00 (total $55.00), and above $3,000.00 the permit fee is "$10.00 per thousand estimated construction cost or fraction thereof". Only the application fee is due at filing; the permit fee is collected when the permit is ready to issue. All building permit fees are non-refundable. See the official fee schedule for current amounts.
Where do you apply for a fence permit in St. Louis?
You can apply through the St. Louis permit portal or contact the City of St. Louis Building Division, Permit Section (Department of Public Safety) directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in St. Louis?
Under Missouri law (RSMo 701.055.1 and 701.055.2; RSMo 327.101.2(5)(a); RSMo 327.191.2(5)(a); RSMo 700.656.5): Missouri does not license general contractors at the state level and has no statewide owner-builder permit statute, disclosure affidavit, or resale restriction comparable to Florida's one year rule. Whether a homeowner may pull the permit and do the work is decided by the city or county that issues the permit. Where state law does speak, it is permissive: RSMo 327.101.2(5)(a) and RSMo 327.191.2(5)(a) let an unlicensed person render architectural and engineering services for the construction, remodeling or repair of a privately owned dwelling house, provided the drawings say the person is not licensed, so plans for a house do not have to be sealed by an architect or engineer. RSMo 701.055.1 expressly preserves a property owner's right to install, modify or repair their own on-site sewage disposal system as long as the state standard is met, and RSMo 701.055.2 adds that no permit or contractor registration is required simply to clean it. RSMo 700.656.5 exempts a person who installs a manufactured home on his or her own property for his or her own occupancy from the otherwise mandatory state installer license. None of these exemptions excuses a local permit where the local jurisdiction requires one. Confirm how St. Louis applies this before you apply.

From the Library

What else needs a permit in St. Louis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsinches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundationCharged as a building permit on estimated construction cost: $25.00 application fee plus...
Electrical PermitIt dependsNot specifiedElectrical permit fees are established by City Ordinance 70802.
HVAC PermitIt dependsNot specifiedMechanical permit fees are established by City Ordinance 70800.
Patio PermitIt dependsNot specifiedA patio cover is charged as a building permit on estimated construction cost: $25.00...
Plumbing PermitIt dependsNot specifiedPlumbing permit fees are established by City Ordinance 71644.
Pool PermitIt dependsinches of water depth, applied together with a 250 square foot surface area testCharged as a building permit on estimated construction cost: $25.00 application fee plus...
Roof Replacement PermitIt dependspercent of roof sheathing removed and replaced during a like-material roof covering replacementCharged as a building permit for alterations and repairs on estimated construction cost:...
Shed PermitIt dependssquare feet of floor area for a detached accessory building, which must also keep the setbacks required by the Zoning OrdinanceCharged as a building permit on estimated construction cost: $25.00 application fee plus...
Solar PermitPermit requiredNot specifiedCharged as a building permit on estimated construction cost: $25.00 application fee plus...

Fence Permit in other Missouri localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not St. Louis documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of St. Louis Building Division, Permit Section (Department of Public Safety). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page