Building permits in St. Louis, Missouri
Of the 10 common home projects we have verified in St. Louis, 1 needs a permit outright and 9 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 10in St. Louis
Look up a permit in St. Louis
St. Louis runs an online permit portal. We have not confirmed what its record search covers.
How to get a building permit in St. Louis
The City of St. Louis Building Division’s Permit Section, in City Hall, issues building permits for property inside St. Louis City, with plumbing, electrical and mechanical permits from its trade sections in the same room. The fastest route for a homeowner’s deck, porch or small addition is the Hot Spot Desk, where a plan reviewer can often approve the plans while you wait.
Where the office is and when it is open
The Permit Section is in Room 425 of City Hall, 1200 Market, open Monday - Friday, 8:00 AM - 4:30 PM. The Hot Spot Desk, staffed by a plan reviewer for immediate homeowner review, runs 9:00 AM - 3:00 PM. Call (314) 622-3313 or email stlcitypermits@stlouis-mo.gov. In person, the office takes only check or cash, and you bring 5 copies of the plans.
Applying online in St. Louis
- On STL City Permits, click “Register” in the upper right corner and pick Resident/Homeowner as the contractor type. The portal’s help sheet (undated, written for licensed contractors) says staff review the request and email a username and password.
- Log in first, then open Public Permits, “Apply for a Building Permit.” Enter the address and your estimated project cost; the Permit Cost Estimator sits next to the Start Application button.
- Upload plans as .pdf, .doc, .docx or image files. If you are not the owner of record, add a letter of authorization from the owner. Add any plumbing, electrical or mechanical permit the job needs on the same application.
- Pay the $25 application fee now; the permit fee comes due once every city agency has approved. Cards add a 2.55% processing fee ($1.55 minimum); e-checks add $1.50.
- Print the permit and display it on site for the whole job.
What five common projects cost here
Building permits are priced on estimated construction cost, from the table on the city’s Apply for a Building Permit page: $0 - $1,000.00 is $25.00 application plus $19.00 permit ($44.00 total); $1,001- $2,000.00 is $48.00 total; $2,001 - $3,000.00 is $55.00 total; over $3,000.00, the $25.00 application plus $10.00 per thousand of estimated cost or fraction thereof. All building permit fees are non-refundable.
- Electrical: $25 application fee, plus inspection fees under Ordinance 70802: residential repair or modify, $60 for the first unit and $60 each additional; repair or modify with service, $100. A new service alone is $60 in the table but $100.00 in the schedule’s own note; confirm at (314) 622-3313. Read 18 Nov 2026.
- Plumbing: $30 application fee under Ordinance 71644, then $10 per fixture (water heaters, floor drains, sumps), $25 per sewer extension or repair, and $25 each for the rough and the finish inspection. Read 18 Nov 2026.
- Shed: a shed over 50 square feet takes a building permit priced on the cost table above. Read 18 Nov 2026.
- Deck: every deck takes a building permit on the same cost table. Read 18 Nov 2026.
- Roof replacement: only a new roof of different material, or one replacing more than 25% of the sheathing, needs a permit, priced on the same cost table. Read 18 Nov 2026.
How long review takes
Every building application goes to a licensed engineer or architect. The office says 70 percent of permits are issued on a same-day basis, many over the counter at the Hot Spot Desk; larger residential projects get more extensive review, with feedback from each city agency assigned. For plumbing and electrical permits the city’s target is an approval or feedback by email within 10 business days, and most are approved within 1 to 3 business days.
Inspections, in order
Once the permit is approved, log in to your STL City Permits dashboard, open the job’s permit tab and click “Request Inspection,” then pick the inspection type. The same contractor help sheet says the earliest online date is the following weekday, and a same-day visit means calling the inspector assigned to your permit. Plumbing fees include a rough and a finish inspection. A failed electrical inspection for faulty or incomplete work costs $50 to reinspect, doubled for each occurrence; a plumbing re-inspection is $30.
Why applications get sent back
- Plumbing permits are issued only to licensed plumbing contractors certified by the city.
- Homeowner electrical permits require passing a short code test from the Electrical Section, an owner-occupied single-family home, and no service change or new construction.
- A deck plan set, per the city’s sun-deck guidelines (Effective Date January 1, 2001), needs a site plan showing the distance to each property line, a pier plan, framing plan, elevations and a section. Photos are required in a Historic District or within 300 feet of a park, Historic District or landmark.
- A project in a Chapter 99 or 100 Redevelopment Area waits for an approval letter from the St. Louis Development Corporation.
- Major structural changes usually need sealed drawings; small improvements may pass on a hand-drawn sketch.
What needs no permit in St. Louis
- Accessory buildings of 50 square feet or less that meet zoning setbacks.
- Roof replacement with like material and 25% or less of the sheathing.
- Replacing existing fencing at the same height, material and location in a rear or side yard.
- Retaining walls 18” or less in height.
- Painting, flooring, tile, carpeting, wall paper and cabinets.
- Replacing windows without changing the opening.
Historic district and landmark properties are different: the Cultural Resources Office, (314) 657-3865, usually requires a permit for exterior work the Building Code exempts. A Floodway Development Permit is required in a flood area even without a building permit.
If the work already started
The plumbing fee schedule adds a surcharge for commencing work before receiving a permit, scaled to the permit fee: $35 on a permit of $0 to $50, up to $1005 on one over $10,000. The building permit page publishes no such surcharge. Missouri penalties for building without a permit.
Checklist before you apply
- An STL City Permits account registered as Resident/Homeowner.
- Your estimated construction cost, which sets the building permit fee.
- Plans with a site plan showing distances to property lines; 5 copies if you apply in person.
- A letter of authorization if you are not the owner of record.
- A licensed plumber for any plumbing, and the Electrical Section’s test if you will do your own wiring.
- Cultural Resources approval first in a historic district, plus photos.
St. Louis documents read for this guide
- Office page: Apply for a Building Permit, read
- Office page: When a Residential Building Permit is Needed, read
- Permit portal: STL City Permits: Request A Building Permit, read
- Fee schedule: Plumbing Permit Fees (City Ordinance 71644), read
- Fee schedule: Electrical Permit Fees (City Ordinance 70802), read
- Inspections: City of St. Louis Permits On the Web (site documentation), read
- Application: Guidelines for Drawing Residential Sun-Deck Plans, read
What needs a permit in St. Louis
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | inches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundation | Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest |
| Electrical Permit | It depends | Before starting any electrical work other than the code's listed minor repairs, and... | The application fee for all electrical permits is $25.00 |
| Fence Permit | It depends | Before building any new fence | See schedule |
| HVAC Permit | It depends | Before installing or replacing a furnace, condensing unit, combination system, boiler... | There is a $25.00 application fee for each permit |
| Patio Permit | It depends | Not needed for a flat, open, at-grade paved patio on the same lot as the house | See schedule |
| Plumbing Permit | It depends | Before any plumbing, drainlaying or process drainage work, any connection to a sewer... | The application fee for all plumbing permits is $30.00 |
| Pool Permit | It depends | inches of water depth, applied together with a 250 square foot surface area test | Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest |
| Roof Replacement Permit | It depends | percent of roof sheathing removed and replaced during a like-material roof covering replacement | See schedule |
| Shed Permit | It depends | square feet of floor area for a detached accessory building, which must also keep the setbacks required by the Zoning Ordinance | See schedule |
| Solar Permit | Permit required | Any size | Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00; the schedule has the rest |
Planning a project in St. Louis?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
St. Louis permit fees compared with nearby Missouri localities
| Missouri locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| St. Louis | See schedule | There is a $25.00 application fee for each permit | The application fee for all electrical permits is $25.00 |
| Kansas City | See schedule | See schedule | See schedule |
Each cell is taken from that Missouri jurisdiction's own fee schedule; the full wording and source sit on each permit page.
St. Louis penalty for work started without a permit
St. Louis publishes what it charges when work begins before the permit, quoted here from the schedule or permit page we verified.
-
Starting work before the permit issues triggers a surcharge that scales with the permit fee, from $35.00 on a $0 to $50.00 permit up to $1,005.00 over $10,000.00.
St. Louis plumbing permit page · last checked
The Missouri statute, the after-the-fact permit path and who may pull the permit: building without a permit in Missouri.
St. Louis permit questions, answered from the data
- Do you need a permit in St. Louis?
- It depends on the project. Of the 10 permit types we cover in St. Louis, 1 always requires a permit (for example a solar permit) and 9 depend on size or scope (a deck permit, for instance). Each St. Louis permit type's page states the exact rule and its source.
- How much does a permit cost in St. Louis?
- St. Louis publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of St. Louis Building Division, Permit Section (Department of Public Safety); we do not estimate or mark them up.
- Where do you apply for a permit in St. Louis?
- City of St. Louis Building Division, Permit Section (Department of Public Safety) issues permits in St. Louis and has an online permit portal, and takes questions at (314) 622-3313. The St. Louis official page and portal are linked in the office section above.
- What is the penalty for building without a permit in St. Louis?
- St. Louis publishes its own charge for work started before the permit: Starting work before the permit issues triggers a surcharge that scales with the permit fee, from $35.00 on a $0 to $50.00 permit up to $1,005.00 over $10,000.00. That is the local bill; the Missouri statute, the after-the-fact permit path and who may pull the permit are on the Missouri building-without-a-permit page.
How the St. Louis pages were verified. 10 permit types, 7 distinct official sources, most recently checked . Every rule is read from City of St. Louis Building Division, Permit Section (Department of Public Safety) or the applicable code and cited on its page; anything we could not confirm for St. Louis is marked rather than estimated. How we verify.
Permitting activity in St. Louis
In 2025, St. Louis authorized permits for 272 new residential housing units (57 single-family, 215 in multi-family buildings), valued at $51M , down from 294 the year before. That works out to about 0.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,645.