Deck Permit in St. Louis, Missouri
It depends
Sometimes, depending on the project
Before building a raised deck or a porch, before any deck attached to the house or set on a permanent foundation, and before any deck that will be roofed or canopied.
Quick answer
Title 25 exempts only a ground-hugging deck: uncovered, resting directly on the ground or a rock base, on no permanent foundation, and no more than twelve inches above adjacent grade. Anything raised above that, attached to the house, or covered needs a building permit, and the Building Division's own summary of residential work lists "porches, decks, and retaining walls" flatly as requiring one. Ordinary repairs are separately exempt, meaning patching treads, risers and platform surfaces or swapping handrails and balusters like for like, as long as the structural components are untouched. The Division's Sun-Deck guideline expects five sets of plans covering site, foundation or pier, floor and framing, elevations and a typical deck section.
- Typical threshold
- inches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundation
- Issued by
- City of St. Louis Building Division, Permit Section (Department of Public Safety)
- Phone
- (314) 622-3313
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a deck permit costs in St. Louis
- Fee schedule in force
- Official scheduleRead .
Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00), $23.00 for $1,001 to $2,000.00, $30.00 for $2,001 to $3,000.00, and "$10.00 per thousand estimated construction cost or fraction thereof" above $3,000.00.
Fees are non-refundable.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in St. Louis
General guide, not specific to this office
What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of St. Louis Building Division, Permit Section (Department of Public Safety)
- Building Division Permit Section, City Hall, 1200 Market Street, Room 425, St. Louis, MO 63103
- Phone: (314) 622-3313
- Email: stlcitypermits@stlouis-mo.gov
Deck Permit in St. Louis compared with nearby Missouri localities
| Locality | Permit needed? | Threshold | What each Missouri schedule says | Verified |
|---|---|---|---|---|
| St. Louis | It depends | inches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundation | Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest | |
| Kansas City | It depends | height of a platform or deck above grade at any point, where it is also not located over any basement or story below | See schedule |
Your Deck Permit checklist for St. Louis
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: inches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundation. Read the rule where we read it: stlouis-mo.gov: permits.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the St. Louis permit portal.
- Keep the office details handy. City of St. Louis Building Division, Permit Section (Department of Public Safety). Phone: (314) 622-3313. Email: stlcitypermits@stlouis-mo.gov. Address: Building Division Permit Section, City Hall, 1200 Market Street, Room 425, St. Louis, MO 63103.
Compiled from the official sources on this page. Last checked .
Permitting activity in St. Louis
In 2025, St. Louis authorized permits for 272 new residential housing units (57 single-family, 215 in multi-family buildings), valued at $51M, down from 294 the year before. That works out to about 0.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,645.
What else needs a permit in St. Louis
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Electrical Permit | It depends | Before starting any electrical work other than the code's listed minor repairs, and... | The application fee for all electrical permits is $25.00 |
| Fence Permit | It depends | Before building any new fence | See schedule |
| HVAC Permit | It depends | Before installing or replacing a furnace, condensing unit, combination system, boiler... | There is a $25.00 application fee for each permit |
| Patio Permit | It depends | Not needed for a flat, open, at-grade paved patio on the same lot as the house | See schedule |
| Plumbing Permit | It depends | Before any plumbing, drainlaying or process drainage work, any connection to a sewer... | The application fee for all plumbing permits is $30.00 |
| Pool Permit | It depends | inches of water depth, applied together with a 250 square foot surface area test | Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest |
| Roof Replacement Permit | It depends | percent of roof sheathing removed and replaced during a like-material roof covering replacement | See schedule |
| Shed Permit | It depends | square feet of floor area for a detached accessory building, which must also keep the setbacks required by the Zoning Ordinance | See schedule |
| Solar Permit | Permit required | Any size | Charged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00; the schedule has the rest |
Frequently asked questions
- Do you need a deck permit in St. Louis?
- It depends on the project. Inches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundation. If you are unsure how that applies to your project, call the permit office at (314) 622-3313 before you start.
- How much does a deck permit cost in St. Louis?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at (314) 622-3313.
- Where do you apply for a deck permit in St. Louis?
- You can apply through the St. Louis permit portal or contact the City of St. Louis Building Division, Permit Section (Department of Public Safety) directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in St. Louis?
- Under Missouri law (RSMo 701.055.1 and 701.055.2; RSMo 327.101.2(5)(a); RSMo 327.191.2(5)(a); RSMo 700.656.5): Missouri does not license general contractors at the state level and has no statewide owner-builder permit statute, disclosure affidavit, or resale restriction comparable to Florida's one year rule. Whether a homeowner may pull the permit and do the work is decided by the city or county that issues the permit. Where state law does speak, it is permissive: RSMo 327.101.2(5)(a) and RSMo 327.191.2(5)(a) let an unlicensed person render architectural and engineering services for the construction, remodeling or repair of a privately owned dwelling house, provided the drawings say the person is not licensed, so plans for a house do not have to be sealed by an architect or engineer. RSMo 701.055.1 expressly preserves a property owner's right to install, modify or repair their own on-site sewage disposal system as long as the state standard is met, and RSMo 701.055.2 adds that no permit or contractor registration is required simply to clean it. RSMo 700.656.5 exempts a person who installs a manufactured home on his or her own property for his or her own occupancy from the otherwise mandatory state installer license. None of these exemptions excuses a local permit where the local jurisdiction requires one. Confirm how St. Louis applies this before you apply.
From the Library
Deck Permit in other Missouri localities
Everything above, sourced
How this deck permit page for St. Louis was verified. 2 official sources: stlouis-mo.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of St. Louis Building Division, Permit Section (Department of Public Safety). Rules change; confirm before you build. How we verify.