Missouri / St. Louis

Electrical Permit in St. Louis, Missouri

It depends

Sometimes, depending on the project

Before starting any electrical work other than the code's listed minor repairs, and before energizing a service that has been disconnected for six months or more.

Quick answer

The City Electrical Code requires a permit before any electrical work begins, with a narrow minor-repairs exemption: swapping a convenience outlet of the same current rating (unless an ungrounded outlet is being replaced with a grounding type that needs new wiring), a like-rated light switch, a light socket and holder, a single light fixture on the same outlet box, and, inside a dwelling unit, a like-for-like fractional horsepower fan, blower or pump motor limited to 240 volts. Permits are issued to electrical contractors certified by the City of St. Louis, and to owners of single-family homes who pass a written Building Division test. That homeowner permit is limited to a room addition, repairs, modifications of existing systems or burglar alarm systems, and expressly does not cover service changes, rehab or new construction.

Issued by
City of St. Louis Building Division, Permit Section (Department of Public Safety)
From an official source Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in St. Louis

Fee schedule in force
Official scheduleRead .
  • Electrical permit fees are established by City Ordinance 70802.
  • The application fee for all electrical permits is $25.00.
  • Residential inspection fees are $60.00 for the first unit and $60.00 for each additional unit to repair or modify, $60.00 for service only, $100.00 for repair or modify with service, and $120.00 for residential new construction including rehab of 50% or more.
  • Re-inspection for faulty or incomplete work is $50.00 and "The re-inspection fee shall be doubled for each occurrence."
  • Re-inspection of a service disconnected six months or more is $30.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in St. Louis

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of St. Louis Building Division, Permit Section (Department of Public Safety)

  • Building Division Permit Section, City Hall, 1200 Market Street, Room 425, St. Louis, MO 63103
  • Phone: (314) 622-3313
  • Email: stlcitypermits@stlouis-mo.gov

Electrical Permit in St. Louis compared with nearby Missouri localities

LocalityPermit needed?ThresholdWhat each Missouri schedule saysVerified
St. LouisIt dependsBefore starting any electrical work other than the code's listed minor repairs, and...The application fee for all electrical permits is $25.00
Kansas CityIt dependsBefore any electrical installation, alteration, repair or replacement, including new...Electrical permits for one- and two-family detached dwellings are priced from the same valuation table as every other trade; the schedule has the rest

Permitting activity in St. Louis

In 2025, St. Louis authorized permits for 272 new residential housing units (57 single-family, 215 in multi-family buildings), valued at $51M, down from 294 the year before. That works out to about 0.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 297,645.

What else needs a permit in St. Louis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsinches above adjacent grade for an uncovered wood deck or patio resting directly on the ground or a rock base with no permanent foundationCharged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest
Fence PermitIt dependsBefore building any new fenceSee schedule
HVAC PermitIt dependsBefore installing or replacing a furnace, condensing unit, combination system, boiler...There is a $25.00 application fee for each permit
Patio PermitIt dependsNot needed for a flat, open, at-grade paved patio on the same lot as the houseSee schedule
Plumbing PermitIt dependsBefore any plumbing, drainlaying or process drainage work, any connection to a sewer...The application fee for all plumbing permits is $30.00
Pool PermitIt dependsinches of water depth, applied together with a 250 square foot surface area testCharged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00 (total $44.00); the schedule has the rest
Roof Replacement PermitIt dependspercent of roof sheathing removed and replaced during a like-material roof covering replacementSee schedule
Shed PermitIt dependssquare feet of floor area for a detached accessory building, which must also keep the setbacks required by the Zoning OrdinanceSee schedule
Solar PermitPermit requiredAny sizeCharged as a building permit on estimated construction cost: $25.00 application fee plus $19.00 for $0 to $1,000.00; the schedule has the rest

Frequently asked questions

Do you need an electrical permit in St. Louis?
Sometimes: before starting any electrical work other than the code's listed minor repairs, and before energizing a service that has been disconnected for six months or more. If you are unsure how that applies to your project, call the permit office at (314) 622-3313 before you start.
How much does an electrical permit cost in St. Louis?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at (314) 622-3313.
How long does an electrical permit take in St. Louis?
Approved permit or feedback by email within 10 business days of submission, and most applications are approved within 1 to 3 business days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an electrical permit in St. Louis?
You can apply through the St. Louis permit portal or contact the City of St. Louis Building Division, Permit Section (Department of Public Safety) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in St. Louis?
Under Missouri law (RSMo 701.055.1 and 701.055.2; RSMo 327.101.2(5)(a); RSMo 327.191.2(5)(a); RSMo 700.656.5): Missouri does not license general contractors at the state level and has no statewide owner-builder permit statute, disclosure affidavit, or resale restriction comparable to Florida's one year rule. Whether a homeowner may pull the permit and do the work is decided by the city or county that issues the permit. Where state law does speak, it is permissive: RSMo 327.101.2(5)(a) and RSMo 327.191.2(5)(a) let an unlicensed person render architectural and engineering services for the construction, remodeling or repair of a privately owned dwelling house, provided the drawings say the person is not licensed, so plans for a house do not have to be sealed by an architect or engineer. RSMo 701.055.1 expressly preserves a property owner's right to install, modify or repair their own on-site sewage disposal system as long as the state standard is met, and RSMo 701.055.2 adds that no permit or contractor registration is required simply to clean it. RSMo 700.656.5 exempts a person who installs a manufactured home on his or her own property for his or her own occupancy from the otherwise mandatory state installer license. None of these exemptions excuses a local permit where the local jurisdiction requires one. Confirm how St. Louis applies this before you apply.

From the Library

Electrical Permit in other Missouri localities

Everything above, sourced

How this electrical permit page for St. Louis was verified. 2 official sources: stlouis-mo.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of St. Louis Building Division, Permit Section (Department of Public Safety). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project