Do you need a fence permit in Missouri?
Of the 2 Missouri counties and cities we checked, 1 requires a fence permit only past a size or scope limit and 1 exempts the work from a fence permit entirely.
- Always required
- 0
- among 2 jurisdictions
- Conditional
- 1
- by size or scope
- Not required
- 1
- exempt outright
What a fence permit application usually includes, and which inspections usually follow, is explained once, in a general guide that is not specific to any state: how a fence permit works, from application to final inspection. Below is what differs from one jurisdiction to the next: who requires a permit, what they charge, and which office you file with.
Swipe sideways to see thresholds and confidence.
| Locality | Permit required? | Typical threshold | Confidence |
|---|---|---|---|
| Kansas City | No | Exempt | Confirmed on official page |
| St. Louis | Conditional | Before building any new fence | Confirmed on official page |
| No localities match your filter. | |||
What a fence permit costs in Missouri
Both Missouri jurisdictions we cover publish a fee figure for this work. Each is quoted from the office's own schedule and linked to its citation. That is too few to stand for Missouri as a whole, so read them as what those offices charge, not a statewide rate.
There is no fence permit and no fence permit fee. The only fence related fee the city publishes is the Board of Zoning Adjustment filing fee for a special exception to the height and location limits: Sec. 27-11(e), "The filing fee for requesting of a special exception shall be $174.00." Sec. 27-11 was last amended by Ord. No. 250575, Sec. 5, 7-24-25, and the editor's note records that the figure reflects fees effective as of April 2013. If the fence is part of a larger permitted project, its cost is folded into that project's valuation and priced from the one- and two-family table in Sec. 18-20(b)(2).
last checked
A fence is permitted as a Miscellaneous Structures Permit under Section 109.2.3 of the City Building Code. The Building Division's published building permit schedule charges a $25.00 application fee plus a permit fee based on estimated construction cost: $19.00 for $0 to $1,000.00 (total $44.00), $23.00 for $1,001 to $2,000.00 (total $48.00), $30.00 for $2,001 to $3,000.00 (total $55.00), and above $3,000.00 the permit fee is "$10.00 per thousand estimated construction cost or fraction thereof". Only the application fee is due at filing; the permit fee is collected when the permit is ready to issue. All building permit fees are non-refundable.
last checked
Jurisdictions not listed publish no dollar figure we could quote. Absence does not mean a permit is free.
Common questions about fence permits in Missouri
- Do I need a fence permit in Missouri?
- In Missouri it depends on the size of the job. Of the 2 Missouri jurisdictions we have verified for fence work, 1 depends on the size or scope of the job and 1 requires none.
- Is there a fence permit exemption in Missouri?
- 1 of the 2 Missouri jurisdictions we cover sets a threshold rather than a flat rule, so the same job can be exempt in one Missouri county and permitted in the next. The table above lists each Missouri jurisdiction's published threshold in its own words, with the source and the date we verified it.
Ready to move on your fence permit?
Hire it out
Sponsored
Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare fence installer quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.