North Dakota / Fargo

Fence Permit in Fargo, North Dakota

It depends

Sometimes, depending on the project

Before building a fence taller than 8.5 feet.

Quick answer

Inside the City of Fargo, the city's own Inspections Department (225 4th Street North) issues building, electrical, plumbing and mechanical permits under the 2024 International Residential Code as locally amended in Fargo Municipal Code Article 21.1-01; the city also applies its codes in its extraterritorial zoning area. Electrical work is permitted and inspected by the city, not filed directly with the North Dakota State Electrical Board, and plumbing permits come from the city under the North Dakota State Plumbing Code it adopts, not from the State Plumbing Board. West Fargo, Moorhead (Minnesota) and rural Cass County are outside the city's scope. For fences, Fargo amends the IRC exemption list to exempt fences not over 8.5 feet high, and the city's Residential Fence Regulations handout says any fence exceeding 8.5 feet needs a building permit and must meet the building setbacks. Height caps in zoning still apply without a permit: 3 feet in a front yard (4 feet if at least 75% light-permeable), 6.5 feet in rear yards and in side yards behind the front-yard line, and up to 8.5 feet in a rear yard when at least 3 feet from the property line (LDC 20-0403.B.6.c).

Typical threshold
Fence height, in any zoning district.
Issued by
City of Fargo Inspections Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in Fargo

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
  • Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00;
  • $1,001.00 to $100,000.00, $50.00 for the first $1,000.00 plus $5.56 for each additional $1,000.00 or fraction thereof;
  • $100,001.00 and up, $600.44 for the first $100,000.00 plus $3.06 for each additional $1,000.00.
  • Work begun before the permit: for work valued $0 to $50,000 the permit fee is doubled (a second offence within 180 days carries a $200 minimum, plus $100 for each later violation);
  • $50,001 to $500,000, 50% of the permit fee (minimum $550);
  • over $500,000, 25% of the permit fee (minimum $2,000).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Fargo

General guide, not specific to this office

What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Fargo Inspections Department

  • 225 4th Street North, Fargo, ND 58102
  • Phone: (701) 241-1561

What else needs a permit in Fargo

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsScope of work: finish work such as cabinets and painting versus remodeling, Sheetrock, plumbing or electrical work.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Deck PermitIt dependsDeck area, for a deck that is also no more than 7 inches above grade at any point, not attached to the dwelling and not serving the required exit door.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeHVAC Permit Fees, effective January 1, 2025: Residential Heating Appliance, initial 200,000 BTU input $45.00; the schedule has the rest
Patio PermitNo permit neededExemptNot published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsPool depth.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Roof Replacement PermitNo permit neededExemptNot published
Shed PermitIt dependsFloor area of a one-story detached accessory building outside the floodplain; in the floodplain the size does not matter.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeSchedule for Plumbing & Sanitary or Storm Sewer Permits, effective January 1, 2025: Water Heating Permits $35.00

Frequently asked questions

Do you need a fence permit in Fargo?
It depends on the project. Fence height, in any zoning district. If you are unsure how that applies to your project, call the City of Fargo Inspections Department at (701) 241-1561 before you start.
How much does a fence permit cost in Fargo?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Fargo Inspections Department at (701) 241-1561.
Where do you apply for a fence permit in Fargo?
You can apply through the Fargo permit portal or contact the City of Fargo Inspections Department directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in Fargo?
Under North Dakota law (N.D.C.C. 43-07-01(1); 43-07-02(1); 43-07-24; 43-18-11; N.D. Admin. Code 24.1-05-01-01(6)): North Dakota's contractor license is required only for a person in the business of contracting on a job over $4,000, and the statute expressly contemplates a person doing general contractor work on their own property while exempt from licensing; that owner must give the permit office the license number of each subcontractor on the job. Building property for sale or rent counts as contracting, so the owner exemption does not cover spec building. A homeowner may do their own plumbing on premises they own and actually occupy as a residence, if it meets the state plumbing code and no local ordinance forbids it. A property owner may do their own electrical work only on a residence or farmstead they own and occupy, after applying to the State Electrical Board, reviewing plans with the local electrical inspector, and paying for inspection. Confirm how Fargo applies this before you apply.

From the Library

Everything above, sourced

How this fence permit page for Fargo was verified. 2 official sources: fargond.gov, download.fargond.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Fargo Inspections Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project