North Dakota / Fargo

Electrical Permit in Fargo, North Dakota

Permit required

Yes, a permit is required

Before any electrical work other than minor repairs.

Quick answer

Fargo issues and inspects electrical permits itself (FMC Chapter 23): a permit is required for all electrical work, whether done by the owner or a contractor, except minor repairs and utility work. A homeowner may self-wire only a single-family home they own and live in (not rentals, day-care or home-business homes, or mobile homes), using the city's Electrical Self-Wire application with a schematic; everyone else must use a licensed electrical contractor, who obtains the permit from the city. Fees for self-wire work are billed by the North Dakota State Electrical Board on the value the city inspector records.

Issued by
City of Fargo Inspections Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Fargo

Fee schedule in force
Official scheduleRead .

The city publishes no electrical fee schedule.

Its Electrical Self-Wire page says the inspector determines the value of the work at the rough-in inspection, the North Dakota State Electrical Board (NDSEB) is notified of that value, and NDSEB bills the applicable fees to the homeowner.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Fargo

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Fargo Inspections Department

  • 225 4th Street North, Fargo, ND 58102
  • Phone: (701) 241-1561

What else needs a permit in Fargo

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsScope of work: finish work such as cabinets and painting versus remodeling, Sheetrock, plumbing or electrical work.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Deck PermitIt dependsDeck area, for a deck that is also no more than 7 inches above grade at any point, not attached to the dwelling and not serving the required exit door.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsFence height, in any zoning district.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
HVAC PermitPermit requiredAny sizeHVAC Permit Fees, effective January 1, 2025: Residential Heating Appliance, initial 200,000 BTU input $45.00; the schedule has the rest
Patio PermitNo permit neededExemptNot published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsPool depth.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Roof Replacement PermitNo permit neededExemptNot published
Shed PermitIt dependsFloor area of a one-story detached accessory building outside the floodplain; in the floodplain the size does not matter.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeSchedule for Plumbing & Sanitary or Storm Sewer Permits, effective January 1, 2025: Water Heating Permits $35.00

Frequently asked questions

Do you need an electrical permit in Fargo?
Yes, before any electrical work other than minor repairs. If you are unsure how that applies to your project, call the City of Fargo Inspections Department at (701) 241-1561 before you start.
How much does an electrical permit cost in Fargo?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Fargo Inspections Department at (701) 241-1561.
Where do you apply for an electrical permit in Fargo?
You can apply through the Fargo permit portal or contact the City of Fargo Inspections Department directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Fargo?
Under North Dakota law (N.D.C.C. 43-07-01(1); 43-07-02(1); 43-07-24; 43-18-11; N.D. Admin. Code 24.1-05-01-01(6)): North Dakota's contractor license is required only for a person in the business of contracting on a job over $4,000, and the statute expressly contemplates a person doing general contractor work on their own property while exempt from licensing; that owner must give the permit office the license number of each subcontractor on the job. Building property for sale or rent counts as contracting, so the owner exemption does not cover spec building. A homeowner may do their own plumbing on premises they own and actually occupy as a residence, if it meets the state plumbing code and no local ordinance forbids it. A property owner may do their own electrical work only on a residence or farmstead they own and occupy, after applying to the State Electrical Board, reviewing plans with the local electrical inspector, and paying for inspection. Confirm how Fargo applies this before you apply.

From the Library

Everything above, sourced

How this electrical permit page for Fargo was verified. 2 official sources: fargond.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Fargo Inspections Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project