Solar Permit in Fargo, North Dakota
Permit required
Yes, a permit is required
Before installing a solar electric system.
Quick answer
Fargo publishes no solar-specific page, handout or fee. Solar photovoltaic installation is electrical work, and the city code requires a permit for all electrical work, whoever does it, except minor repairs and utility work; the wiring is inspected by the city before it is concealed and before it is energized.
- Issued by
- City of Fargo Inspections Department
- Phone
- (701) 241-1561
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your North Dakota Secretary of State (contractor licensing) license active, and under which business name? Verify it on firststop.sos.nd.gov.
North Dakota's owner-builder rule (N.D.C.C. 43-07-01(1); 43-07-02(1); 43-07-24; 43-18-11; N.D. Admin. Code 24.1-05-01-01(6)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Fargo
- Fee schedule in force
- Official scheduleRead .
The city publishes no electrical fee schedule.
Its Electrical Self-Wire page says the inspector determines the value of the work at the rough-in inspection, the North Dakota State Electrical Board (NDSEB) is notified of that value, and NDSEB bills the applicable fees to the homeowner.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Fargo
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Fargo Inspections Department
- 225 4th Street North, Fargo, ND 58102
- Phone: (701) 241-1561
Your Solar Permit checklist for Fargo
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: fargond.gov: inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Fargo permit portal.
- Keep the office details handy. City of Fargo Inspections Department. Phone: (701) 241-1561. Address: 225 4th Street North, Fargo, ND 58102.
Compiled from the official sources on this page. Last checked .
What else needs a permit in Fargo
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Scope of work: finish work such as cabinets and painting versus remodeling, Sheetrock, plumbing or electrical work. | Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00 |
| Deck Permit | It depends | Deck area, for a deck that is also no more than 7 inches above grade at any point, not attached to the dwelling and not serving the required exit door. | Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00 |
| Electrical Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | Fence height, in any zoning district. | Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00 |
| HVAC Permit | Permit required | Any size | HVAC Permit Fees, effective January 1, 2025: Residential Heating Appliance, initial 200,000 BTU input $45.00; the schedule has the rest |
| Patio Permit | No permit needed | Exempt | Not published |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | It depends | Pool depth. | Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00 |
| Roof Replacement Permit | No permit needed | Exempt | Not published |
| Shed Permit | It depends | Floor area of a one-story detached accessory building outside the floodplain; in the floodplain the size does not matter. | Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00 |
| Water Heater Permit | Permit required | Any size | Schedule for Plumbing & Sanitary or Storm Sewer Permits, effective January 1, 2025: Water Heating Permits $35.00 |
Frequently asked questions
- Do you need a solar permit in Fargo?
- Yes, before installing a solar electric system. If you are unsure how that applies to your project, call the City of Fargo Inspections Department at (701) 241-1561 before you start.
- How much does a solar permit cost in Fargo?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Fargo Inspections Department at (701) 241-1561.
- Where do you apply for a solar permit in Fargo?
- You can apply through the Fargo permit portal or contact the City of Fargo Inspections Department directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Fargo?
- Under North Dakota law (N.D.C.C. 43-07-01(1); 43-07-02(1); 43-07-24; 43-18-11; N.D. Admin. Code 24.1-05-01-01(6)): North Dakota's contractor license is required only for a person in the business of contracting on a job over $4,000, and the statute expressly contemplates a person doing general contractor work on their own property while exempt from licensing; that owner must give the permit office the license number of each subcontractor on the job. Building property for sale or rent counts as contracting, so the owner exemption does not cover spec building. A homeowner may do their own plumbing on premises they own and actually occupy as a residence, if it meets the state plumbing code and no local ordinance forbids it. A property owner may do their own electrical work only on a residence or farmstead they own and occupy, after applying to the State Electrical Board, reviewing plans with the local electrical inspector, and paying for inspection. Confirm how Fargo applies this before you apply.
From the Library
Everything above, sourced
How this solar permit page for Fargo was verified. 2 official sources: fargond.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Fargo Inspections Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page