North Dakota / Fargo

Plumbing Permit in Fargo, North Dakota

Permit required

Yes, a permit is required

Before installing, altering, repairing or extending any plumbing or connecting to the city sewer or water system.

Quick answer

Fargo issues its own plumbing permits and enforces the North Dakota State Plumbing Code as adopted in FMC Chapter 22. Every licensed plumber must apply to the city for a permit before installing, altering, repairing or extending plumbing; work is inspected and tested before it is covered, and a final inspection follows once fixtures are set. A licensed contractor must bring sewer and water from the street to within 5 feet of the building.

Issued by
City of Fargo Inspections Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a plumbing permit costs in Fargo

Fee schedule in force
Official scheduleRead .
Published in
Schedule for Plumbing & Sanitary or Storm Sewer Permits, effective January 1, 2025:
  • Inside Plumbing Permits, minimum fee $50.00 (includes up to 5 fixtures or traps), each fixture or trap over 5 is $10.00;
  • Water Heating Permits $35.00;
  • Repair or Replacement of Sanitary or Storm Sewer $75.00.
  • Double fees for all work commenced without a permit.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Fargo

General guide, not specific to this office

What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Fargo Inspections Department

  • 225 4th Street North, Fargo, ND 58102
  • Phone: (701) 241-1561

What else needs a permit in Fargo

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsScope of work: finish work such as cabinets and painting versus remodeling, Sheetrock, plumbing or electrical work.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Deck PermitIt dependsDeck area, for a deck that is also no more than 7 inches above grade at any point, not attached to the dwelling and not serving the required exit door.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsFence height, in any zoning district.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
HVAC PermitPermit requiredAny sizeHVAC Permit Fees, effective January 1, 2025: Residential Heating Appliance, initial 200,000 BTU input $45.00; the schedule has the rest
Patio PermitNo permit neededExemptNot published
Pool PermitIt dependsPool depth.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Roof Replacement PermitNo permit neededExemptNot published
Shed PermitIt dependsFloor area of a one-story detached accessory building outside the floodplain; in the floodplain the size does not matter.Residential Building Permit Fees (one- and two-family dwellings), effective January 1, 2026, by total valuation: up to and including $1,000.00, $50.00
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeSchedule for Plumbing & Sanitary or Storm Sewer Permits, effective January 1, 2025: Water Heating Permits $35.00

Frequently asked questions

Do you need a plumbing permit in Fargo?
Yes, before installing, altering, repairing or extending any plumbing or connecting to the city sewer or water system. If you are unsure how that applies to your project, call the City of Fargo Inspections Department at (701) 241-1561 before you start.
How much does a plumbing permit cost in Fargo?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Fargo Inspections Department at (701) 241-1561.
Where do you apply for a plumbing permit in Fargo?
You can apply through the Fargo permit portal or contact the City of Fargo Inspections Department directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Fargo?
Under North Dakota law (N.D.C.C. 43-07-01(1); 43-07-02(1); 43-07-24; 43-18-11; N.D. Admin. Code 24.1-05-01-01(6)): North Dakota's contractor license is required only for a person in the business of contracting on a job over $4,000, and the statute expressly contemplates a person doing general contractor work on their own property while exempt from licensing; that owner must give the permit office the license number of each subcontractor on the job. Building property for sale or rent counts as contracting, so the owner exemption does not cover spec building. A homeowner may do their own plumbing on premises they own and actually occupy as a residence, if it meets the state plumbing code and no local ordinance forbids it. A property owner may do their own electrical work only on a residence or farmstead they own and occupy, after applying to the State Electrical Board, reviewing plans with the local electrical inspector, and paying for inspection. Confirm how Fargo applies this before you apply.

From the Library

Everything above, sourced

How this plumbing permit page for Fargo was verified. 2 official sources: fargond.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Fargo Inspections Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required