Florida / St. Lucie County

Fence Permit in St. Lucie County, Florida

Permit required

Yes, a permit is required

Before installing any new fence in unincorporated St. Lucie County

Quick answer

In unincorporated St. Lucie County, installing a new fence requires a building permit from the county Building Division. The county's list of items not requiring a permit names only fence repairs of less than 2 panels, and it excludes pool barrier fencing; the county still asks for an exemption application so staff can verify the exemption. A fence that serves as a pool safety barrier always requires a permit regardless of size. This applies to unincorporated areas only; the City of Port St. Lucie and City of Fort Pierce run their own building departments and permit fences separately.

Typical threshold
Fence repairs of less than 2 panels, excluding pool barriers, are on the county's list of items not requiring a permit (repairs under $2,500 that do not affect structural integrity, with an exemption application still required for verification); installing a new fence, larger repairs, or any pool barrier fence requires a permit.
Issued by
St. Lucie County Building & Permitting Division (Planning and Development Services)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in St. Lucie County

Permit fee
Not published

St. Lucie County publishes no fee for this permit type in a schedule we can verify. Ask St. Lucie County Building & Permitting Division (Planning and Development Services) how the fee is calculated for your project.

How St. Lucie County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermit not required for repair or replacement of less than 50% of an existing fence using the same size and material in the same location.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredA permit is not required for fence enclosures of garbage containers or mechanical equipment with three panels or less and one gate.
Clay CountyIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence posts
Collier CountyPermit requiredAny size
St. Lucie Countythis pagePermit requiredFence repairs of less than 2 panels, excluding pool barriers, are on the county's list of items not requiring a permit (repairs under $2,500 that do not affect structural integrity, with an exemption application still required for verification); installing a new fence, larger repairs, or any pool barrier fence requires a permit.

How to apply in St. Lucie County

General guide, not specific to this office

What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

St. Lucie County Building & Permitting Division (Planning and Development Services)

  • 2300 Virginia Avenue, Fort Pierce, FL 34982
  • Phone: (772) 462-1553

Permitting activity in St. Lucie County

In 2025, St. Lucie County authorized permits for 4,008 new residential housing units (3,468 single-family, 540 in multi-family buildings), valued at $1.2B, down from 4,869 the year before. That works out to about 10 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 402,449.

What else needs a permit in St. Lucie County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?Threshold
Deck PermitPermit requiredMinor replacement of existing decking (walking surface only) under $1,000 in value, for 1 and 2 family dwellings, does not require a permit; new deck construction, structural work, or higher-value decking replacement requires a permit.
Electrical PermitPermit requiredAny size
HVAC PermitPermit requiredAny size
Patio PermitIt dependsSand-set pavers that are not a pool or spa deck and are not within five feet of a pool do not require a permit, for 1 and 2 family dwellings; pavers used as a pool deck, pavers within five feet of a pool, or other patio construction requires a permit.
Plumbing PermitPermit requiredAny size
Pool PermitIt dependsPortable or manufactured pools or spas less than 24 inches deep do not require a permit; in-ground pools, permanent spas, and portable or manufactured pools or spas 24 inches deep or more require a permit.
Roof Replacement PermitIt dependsA permit is required for any reroof work exceeding 25% of the existing roof area within a 12-month period.
Shed PermitPermit requiredAny size
Solar PermitPermit requiredAny size

Frequently asked questions

Do you need a fence permit in St. Lucie County?
Yes, before installing any new fence in unincorporated St. Lucie County. If you are unsure how that applies to your project, call the permit office at (772) 462-1553 before you start.
How much does a fence permit cost in St. Lucie County?
We found no published fee for a fence permit in St. Lucie County. To learn how it is calculated for your project, call the permit office at (772) 462-1553.
How long does a fence permit take in St. Lucie County?
Minor permits are usually approved within 24 to 48 hours; standard building permits are targeted for issuance within 14 workdays when all required documents are provided. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a fence permit in St. Lucie County?
You can apply through the St. Lucie County permit portal or contact the St. Lucie County Building & Permitting Division (Planning and Development Services) directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in St. Lucie County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how St. Lucie County applies this before you apply.

From the Library

Fence Permit in other Florida localities

Everything above, sourced

How this fence permit page for St. Lucie County was verified. 2 official sources: stlucieco.gov, stlucieco.gov. Last checked by Mario Bailey, not confirmed with St. Lucie County Building & Permitting Division (Planning and Development Services). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project