Florida / Martin County

Fence Permit in Martin County, Florida

Permit required

Yes, a permit is required

Before work begins.

Quick answer

Martin County's Building Department issues permits for unincorporated Martin County. The Village of Indiantown, the Town of Sewall's Point, the Town of Jupiter Island and the Town of Ocean Breeze run their own building permitting, and the City of Stuart is a separate incorporated city, so county rules do not apply inside them. Martin County lists fences and pool barriers among the projects that require a permit. The fence checklist asks for a survey showing the fence, its setbacks, height and type; a contractor's Affidavit of Compliance waives the zoning review, except where the fence is a pool barrier.

Issued by
Martin County Building Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in Martin County

Fee schedule in force
Official scheduleRead .
Published in
Fee schedule effective July 1, 2026:

construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection;

the HB 803 permit exemption waiver for qualifying work under $7,500 is $75.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Martin County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermit not required for repair or replacement of less than 50% of an existing fence using the same size and material in the same location.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredA permit is not required for fence enclosures of garbage containers or mechanical equipment with three panels or less and one gate.
Clay CountyIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence posts
Collier CountyPermit requiredAny size
Martin Countythis pagePermit requiredAny size

How to apply in Martin County

General guide, not specific to this office

What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Martin County Building Department

  • 900 SE Ruhnke Street, Stuart, FL 34994
  • Phone: (772) 288-5916

What else needs a permit in Martin County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection, for every permit type below. The fee column shows what differs by project.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work and fixture repairs versus a remodelThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Deck PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Electrical PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
EV Charger PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
HVAC PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Patio PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Plumbing PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Pool PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Roof Replacement PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Shed PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Solar PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75
Water Heater PermitPermit requiredAny sizeThe HB 803 permit exemption waiver for qualifying work under $7,500 is $75

Frequently asked questions

Do you need a fence permit in Martin County?
Yes, before work begins. If you are unsure how that applies to your project, call the Martin County Building Department at (772) 288-5916 before you start.
How much does a fence permit cost in Martin County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 23 Oct 2026. For the figure on your own project, call the Martin County Building Department at (772) 288-5916.
Where do you apply for a fence permit in Martin County?
You can apply through the Martin County permit portal or contact the Martin County Building Department directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in Martin County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Martin County applies this before you apply.

From the Library

Fence Permit in other Florida localities

Everything above, sourced

How this fence permit page for Martin County was verified. 2 official sources: martin.fl.us, martin.fl.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Martin County Building Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project