Water Heater Permit in Martin County, Florida
Permit required
Yes, a permit is required
Before work begins.
Issued byMartin County Building Department
By Mario Bailey, verified against official sources
Quick answer
Martin County lists water heater installation and replacement among the projects that require a permit, and its HB 803 page names water heater replacements as work that still needs a permit even under $7,500.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbers usually pull this permit as part of the replacement. If yours failed and you are choosing a plumber under time pressure, comparing a couple of quotes still pays.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before work begins.
What a water heater permit costs in Martin County
How Martin County compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Martin Countythis page | Permit required | Fee schedule effective July 1, 2026: construction costs under $25,000 pay a... |
| Miami | Permit required | "Residential less than estimated $2,500.00": $45.00 |
| Tampa | Permit required | ...activities not addressed below or any other fee table" $120.00, City of... |
How to apply in Martin County
In Martin County, replacing a residential water heater needs a permit before work starts, because swapping the appliance counts as installing regulated plumbing and fuel gas work, not an exempt repair. The application itself stays light: it identifies the work and its location, and most offices only ask for extra fuel or capacity details when the replacement changes fuel type or input size.
What most water heater permit applications include:
- For Martin County, a permit must be obtained before an owner or contractor installs, alters, or replaces any plumbing, fuel gas, or electrical system regulated by the code, which covers putting in a new water heater (IRC R105.1).
- Water heater replacement is not on the code's short list of exempt plumbing work, and replacing defective piping with new material is expressly defined as new work that needs a permit and inspection (IRC R105.2).
- For Martin County, the application itself only has to identify and describe the work and describe the location of the building or work, which is why most offices can process a water heater permit as a short form rather than a full plan set (IRC R105.3).
- Once a complete application is on file, the building official must act on it and issue the permit as soon as practicable if the proposed work conforms to code, which is the basis for the same-day or next-business-day turnaround many permit offices offer for a straight swap (IRC R105.3.1).
- For Martin County, the permit only stays valid if the work starts within the code's default window before it lapses, so scheduling the replacement and its inspection soon after the permit issues matters (IRC R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1, Section R105 (Permits). Source. Martin County Building Department sets the exact checklist for Martin County.
Where to apply in Martin County:
Martin County Building Department
- 900 SE Ruhnke Street, Stuart, FL 34994
- Phone: (772) 288-5916
Water Heater Permit in Martin County compared with nearby Florida localities
| Locality | Permit needed? | Threshold | What each Florida schedule says | Verified |
|---|---|---|---|---|
| Martin County | Permit required | Any size | Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building... | |
| Miami | Permit required | Any size | "Residential less than estimated $2,500.00": $45.00 | |
| Tampa | Permit required | Any size | ...plumbing-related activities not addressed below or any other fee table" $120.00... |
Inspections and closing out your permit
In Martin County, a water heater swap normally draws one inspection, a final, since the work is exposed rather than buried behind new framing. That single visit confirms the relief valve and its discharge pipe, thermal expansion control and seismic strapping where the installation requires them, and, on gas units, adequate combustion air and an approved vent connection.
- In Martin County: the lifecycle has one required visit, the final inspection, made after the permitted work is complete and before the water heater goes into service; because a straight swap conceals nothing behind framing, offices typically do not schedule a separate rough-in visit for it (IRC R109.1.6).
- In Martin County: the inspector confirms the water heater is protected by either a separate pressure relief valve and temperature relief valve, or one combination valve rated for the appliance (IRC P2804.1).
- In Martin County: the relief valve's discharge pipe is checked for an unobstructed, un-trapped gravity path that ends through an air gap no more than 6 inches above the floor or pan, since a wrong discharge pipe is one of the most common reasons a water heater fails inspection (IRC P2804.6.1).
- In Martin County: where the water heater feeds a closed system, for instance behind a backflow preventer or check valve, the inspector looks for a thermal expansion control device sized to absorb the resulting pressure increase (IRC P2903.4.2).
- In Martin County: on a gas-fired unit, the inspector verifies the space provides enough combustion air, sized at 50 cubic feet per 1,000 Btu per hour of the appliance's input rating unless an engineered alternative method is used (IRC G2407.5.1).
- In Martin County: the gas unit's vent must tie into an approved venting system, which the inspector checks along with the vent's physical connections and support (IRC G2427.1, G2427.2).
- In Martin County: where site conditions call for them, the inspector also checks for a drain pan under a tank whose leakage would cause damage, and for seismic strapping in the upper and lower thirds of the tank in the seismic design categories and townhouse conditions where the code requires it (IRC P2801.6; P2801.8).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Martin County permit portal or by phone at (772) 288-5916.
Inspection sequence from 2021 International Residential Code (IRC), Chapters 24, 28, and 29 (Fuel Gas; Water Heaters; Water Supply and Distribution). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Water Heater Permit checklist for Martin County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before work begins.
- Budget the fee. Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection; the HB 803 permit exemption waiver for qualifying work under $7,500 is $75. Official fee schedule.
- Apply. In Martin County, replacing a residential water heater needs a permit before work starts, because swapping the appliance counts as installing regulated plumbing and fuel gas work, not an exempt repair. The application itself stays light: it identifies the work and its location, and most offices only ask for extra fuel or capacity details when the replacement changes fuel type or input size. Start at the Martin County permit portal.
- Keep the office details handy. Martin County Building Department. Phone: (772) 288-5916. Address: 900 SE Ruhnke Street, Stuart, FL 34994.
- Plan for inspections. In Martin County, a water heater swap normally draws one inspection, a final, since the work is exposed rather than buried behind new framing. That single visit confirms the relief valve and its discharge pipe, thermal expansion control and seismic strapping where the installation requires them, and, on gas units, adequate combustion air and an approved vent connection.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a water heater permit in Martin County?
- Martin County lists water heater installation and replacement among the projects that require a permit, and its HB 803 page names water heater replacements as work that still needs a permit even under $7,500. Always confirm with the Martin County Building Department before starting.
- How much does a water heater permit cost in Martin County?
- Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection; the HB 803 permit exemption waiver for qualifying work under $7,500 is $75. See the official fee schedule for current amounts.
- Where do you apply for a water heater permit in Martin County?
- You can apply through the Martin County permit portal or contact the Martin County Building Department directly. The links are listed on this page.
- Can a homeowner pull a water heater permit themselves in Martin County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Martin County applies this before you apply.
From the Library
What else needs a permit in Martin County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection, for every permit type below. The fee column shows what differs by project.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Finish work and fixture repairs versus a remodel | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Deck Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Electrical Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| EV Charger Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Fence Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| HVAC Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Patio Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Plumbing Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Pool Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Roof Replacement Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Shed Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Solar Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
Water Heater Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Martin County documents; the office above sets the local rules.
How this water heater permit page for Martin County was verified. 2 official sources: martin.fl.us, martin.fl.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Martin County Building Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Water Heater Permit requirements across Florida localities