Electrical Permit in Martin County, Florida
Permit required
Yes, a permit is required
Before work begins.
Issued byMartin County Building Department
By Mario Bailey, verified against official sources
Quick answer
Martin County requires a permit to install, alter, repair or replace any electrical system regulated by the code, and lists electrical panels, circuits, and ceiling fans or lights on a new circuit among projects that require a permit. Electrical work is excluded from the HB 803 under-$7,500 exemption.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before work begins.
What an electrical permit costs in Martin County
How Martin County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | Permit required | Any size |
| Brevard County | It depends | Permits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring. |
| Broward County | Permit required | Any size |
| Charlotte County | Permit required | Any size |
| Clay County | Permit required | Any size |
| Collier County | Permit required | Permits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices. |
| Martin Countythis page | Permit required | Any size |
How to apply in Martin County
In Martin County, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
What most electrical permit applications include:
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- For Martin County, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- For Martin County, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Martin County Building Department sets the exact checklist for Martin County.
Where to apply in Martin County:
Martin County Building Department
- 900 SE Ruhnke Street, Stuart, FL 34994
- Phone: (772) 288-5916
Electrical Permit in Martin County compared with nearby Florida localities
| Locality | Permit needed? | Threshold | What each Florida schedule says | Verified |
|---|---|---|---|---|
| Martin County | Permit required | Any size | Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building... | |
| Alachua County | Permit required | Any size | No electrical-specific flat fee is published | |
| Brevard County | It depends | Permits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring. | ...Electrical Permit Application fee table lists a Building Code Review fee of $75.00... | |
| Broward County | Permit required | Any size | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per... | |
| Charlotte County | Permit required | Any size | At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation... |
Inspections and closing out your permit
In Martin County, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- In Martin County: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- In Martin County: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- In Martin County: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- In Martin County: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- In Martin County: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- In Martin County: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- In Martin County: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Martin County permit portal or by phone at (772) 288-5916.
Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Electrical Permit checklist for Martin County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before work begins.
- Budget the fee. Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection; the HB 803 permit exemption waiver for qualifying work under $7,500 is $75. Official fee schedule.
- Apply. In Martin County, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished. Start at the Martin County permit portal.
- Keep the office details handy. Martin County Building Department. Phone: (772) 288-5916. Address: 900 SE Ruhnke Street, Stuart, FL 34994.
- Plan for inspections. In Martin County, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need an electrical permit in Martin County?
- Martin County requires a permit to install, alter, repair or replace any electrical system regulated by the code, and lists electrical panels, circuits, and ceiling fans or lights on a new circuit among projects that require a permit. Electrical work is excluded from the HB 803 under-$7,500 exemption. Always confirm with the Martin County Building Department before starting.
- How much does an electrical permit cost in Martin County?
- Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection; the HB 803 permit exemption waiver for qualifying work under $7,500 is $75. See the official fee schedule for current amounts.
- Where do you apply for an electrical permit in Martin County?
- You can apply through the Martin County permit portal or contact the Martin County Building Department directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Martin County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Martin County applies this before you apply.
From the Library
What else needs a permit in Martin County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection, for every permit type below. The fee column shows what differs by project.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Finish work and fixture repairs versus a remodel | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Deck Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| EV Charger Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Fence Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| HVAC Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Patio Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Plumbing Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Pool Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Roof Replacement Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Shed Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Solar Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
| Water Heater Permit | Permit required | Any size | The HB 803 permit exemption waiver for qualifying work under $7,500 is $75 |
Electrical Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Martin County documents; the office above sets the local rules.
How this electrical permit page for Martin County was verified. 2 official sources: martin.fl.us, martin.fl.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Martin County Building Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Electrical Permit requirements across Florida localities