Electrical Permit in Broward County, Florida
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources Confirmed on official pagePermit required
Quick answer
An electrical permit is required in unincorporated Broward County for new wiring service upgrades and electrical modifications. Electrical permits are listed as a named permit category on the Building Code and Permits forms page. Applications are submitted through ePermits OneStop. Incorporated municipalities in Broward have their own building departments.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Broward County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
For all new wiring and electrical service work
What electrical permit costs in Broward County
Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.30 of the Building Permits Fee Schedule (Ord. 2025-038, eff. 5-1-25).
How Broward County compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Broward Countythis page | Permit required | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job va... |
| Hillsborough County | Permit required | Residential Electrical (General) trade permit fee is $130 flat for inspection... |
| Lee County | Permit required | Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee... |
| Miami-Dade County | Permit required | Residential wiring for new construction, additions, repairs and alterations i... |
| Orange County | Permit required | Minimum Electrical Permit fee is $38 flat, scaling with service amperage for... |
| Palm Beach County | Permit required | Charged by value of construction with a $75 minimum, per the PZB Building Div... |
| Pasco County | It depends | Base fee $45; |
How to apply in Broward County
In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
What most electrical permit applications include:
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Broward County Building Code Division sets the exact checklist for Broward County.
Where to apply in Broward County:
Broward County Building Code Division
- 2307 W Broward Blvd Suite 300, Fort Lauderdale, FL 33312
- Phone: (954) 765-4400
- Email: building@broward.org
Inspections and closing out your permit
Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Broward County permit portal or by phone at (954) 765-4400.
Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Electrical Permit checklist for Broward County
- Confirm the requirement. Yes, a permit is required. Usually needed: For all new wiring and electrical service work.
- Budget the fee. Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.30 of the Building Permits Fee Schedule (Ord. 2025-038, eff. 5-1-25). Official fee schedule.
- Apply. In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished. Start at the Broward County permit portal.
- Keep the office details handy. Broward County Building Code Division. Phone: (954) 765-4400. Address: 2307 W Broward Blvd Suite 300, Fort Lauderdale, FL 33312.
- Plan for inspections. Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Broward County
In 2024, Broward County authorized permits for 1,655 new residential housing units (697 single-family, 958 in multi-family buildings), valued at $409M, down from3,047 the year before. That works out to about 0.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 2,037,472.
About Broward County
Broward County has about 863,128 housing units. The median home is valued at $380,400, against a median household income of $74,534. About 63% of homes are owner-occupied, and the typical home was built around 1980.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a electrical permit in Broward County?
- An electrical permit is required in unincorporated Broward County for new wiring service upgrades and electrical modifications. Electrical permits are listed as a named permit category on the Building Code and Permits forms page. Applications are submitted through ePermits OneStop. Incorporated municipalities in Broward have their own building departments. Always confirm with the Broward County Building Code Division before starting.
- How much does a electrical permit cost in Broward County?
- Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.30 of the Building Permits Fee Schedule (Ord. 2025-038, eff. 5-1-25). See the official fee schedule for current amounts.
- Where do you apply for a electrical permit in Broward County?
- You can apply through the Broward County permit portal or contact the Broward County Building Code Division directly. The links are listed on this page.
From the Library
What else needs a permit in Broward County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | No separate deck fee line; |
| Fence Permit | Permit required | Not specified | No separate fence fee line; |
| HVAC Permit | Permit required | Not specified | Mechanical (air conditioning and ventilation) permit is the greater of a $125 minimum b... |
| Patio Permit | Permit required | Not specified | No separate patio fee line; |
| Plumbing Permit | Permit required | Not specified | Plumbing permit is the greater of a $125 minimum base fee or 3.0% of job value, per Sec... |
| Pool Permit | Permit required | Not specified | Pool work needs separate Structural, Plumbing, Mechanical and Electrical permit applica... |
| Roof Replacement Permit | It depends | under F.S. 553.79(1)(g) (HB 803, ch. 2026-63, effective 2026-07-01), work valued at less than $7,500 on a single-family dwelling qualifies for exemption upon a written exemption request with documentation of the nature and value of the work; the exemption excludes electrical, plumbing, structural, mechanical, and gas work and any property in a flood hazard area; the statute does not name roofing, so a non-structural reroof under that value can qualify; confirm with Broward County Building Code Division. | Structural permit with a roofing-specific minimum: the greater of a $250 minimum base r... |
| Shed Permit | Permit required | Not specified | No separate shed fee line; |
| Solar Permit | Permit required | Not specified | Not published |
Electrical Permit in other Florida localities
Official sources
- https://www.broward.org/Building/Forms/Pages/Building-Code-and-Permits.aspx
- https://www.broward.org/Building/BuildingPermits/Pages/BuildingPermits.aspx
- https://alpinecountyca.gov/DocumentCenter/View/6763/2022-CA-Residential-Codes-Section-R105---Permits
- https://www.parkcountyco.gov/DocumentCenter/View/2733/Residential-Inspection-Checklist
Verified by a person against the sources above on 2026-06-18, not confirmed with Broward County Building Code Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Compare Electrical Permit requirements across Florida localities
Florida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 · 2026-07-25
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 · 2026-07-25