Florida / Hillsborough County

Electrical Permit in Hillsborough County, Florida

Permit required

Yes, a permit is required

Before altering, replacing or relocating electric wiring

Quick answer

Altering, replacing or relocating electric wiring systems in Hillsborough County is not a minor repair and requires a permit. Roof mounted solar also goes through an Electrical Trade permit.

Issued by
Hillsborough County Development Services
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Hillsborough County

Fee schedule in force
Official scheduleRead .

Residential Electrical (General) trade permit fee is $130 flat for inspection-only work with no plan review, full fee due at submission, per Building Permit Fee Schedule effective October 5, 2024.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Hillsborough County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredAny size
Clay CountyPermit requiredAny size
Collier CountyPermit requiredPermits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices.
Hillsborough Countythis pagePermit requiredAny size

How to apply in Hillsborough County

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Hillsborough County Development Services

Permitting activity in Hillsborough County

In 2025, Hillsborough County authorized permits for 8,696 new residential housing units (4,295 single-family, 4,401 in multi-family buildings), valued at $2.3B, down from 9,053 the year before. That works out to about 5.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,574,115.

About Hillsborough County

Hillsborough County has about 618,220 housing units. The median home is valued at $333,300, against a median household income of $75,011. About 61% of homes are owner-occupied, and the typical home was built around 1990.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

What else needs a permit in Hillsborough County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdecks are not on the county's list of exempt work; the county says a project not on that list most likely requires a permit; confirm with Development ServicesResidential Misc Projects permit fee is $380 flat, covers decks, sheds; the schedule has the rest
Fence PermitIt dependsPVC wood and chain-link fences are exempt; electrical or concrete fences require a permitSee schedule
HVAC PermitPermit requiredAny sizeResidential Mechanical (General) and HVAC Equal Change Outs trade permit fee is $130 flat, inspection-only with no plan review; the schedule has the rest
Patio PermitNot confirmedNot confirmedNot published
Plumbing PermitPermit requiredAny sizeResidential Plumbing (General) trade permit fee is $130 flat, inspection-only with no plan review, per Building Permit Fee Schedule effective October 5, 2024
Pool PermitPermit requiredAny sizeResidential in-ground Pool/Spa permit fee is $475 flat, or $150 flat for an above ground pool or spa; the schedule has the rest
Roof Replacement PermitIt dependsRoof replacement is done under a re-roofing permit. The county lists non-structural roof repair or replacement on a single-family residence valued under $7,500 as a possible exemption under House Bill 803, on an approved exemption application only, and not for property in a flood hazard area or for structural, electrical, plumbing, mechanical or gas work.Residential Roofing trade permit fee is $250 flat, inspection-only single-trade permit with no plan review; the schedule has the rest
Shed PermitIt dependssheds less than 150 sq ft are exempt; sheds over 150 sq ft require a building permit; the county pages do not clearly place a shed of exactly 150 sq ftResidential Misc Projects fee of $380 flat covers sheds and includes a $50 application fee
Solar PermitPermit requiredAny sizeResidential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review, per Building Permit Fee Schedule effective October 5, 2024

Frequently asked questions

Do you need an electrical permit in Hillsborough County?
Yes, before altering, replacing or relocating electric wiring. If you are unsure how that applies to your project, call the Hillsborough County Development Services at (813) 272-5600 before you start.
How much does an electrical permit cost in Hillsborough County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Hillsborough County Development Services at (813) 272-5600.
Where do you apply for an electrical permit in Hillsborough County?
You can apply through the Hillsborough County permit portal or contact the Hillsborough County Development Services directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Hillsborough County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Hillsborough County applies this before you apply.

From the Library

Electrical Permit in other Florida localities

Everything above, sourced

How this electrical permit page for Hillsborough County was verified. 3 official sources: hcfl.gov, hcfl.gov, hcfl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Hillsborough County Development Services. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project