Shed Permit in Hillsborough County, Florida
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources Confirmed on official pageIt depends
Quick answer
Residential sheds and greenhouses under 150 square feet are exempt from building permits in Hillsborough County. Sheds 150 square feet or larger require a Residential Miscellaneous Building permit and professionally signed and sealed plans. Applications are submitted through the HillsGovHub online portal. This applies to unincorporated Hillsborough County.
Typical threshold: sheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Hillsborough County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Before building any shed 150 sq ft or larger
What your shed permit must meet in Florida
Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.
- As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
- Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
- Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).
Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What shed permit costs in Hillsborough County
Residential Misc Projects fee of $380 flat covers sheds and includes a $50 application fee; sheds and greenhouses under 150 square feet need no permit per the Work Exempt from Permits page, per Building Permit Fee Schedule effective October 5, 2024.
How Hillsborough County compares in Florida
Across the Florida jurisdictions we have verified, the same threshold runs from 36 to 400, so a project that is exempt here may still need a permit one county over.
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Hillsborough Countythis page | It depends | sheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit |
| Miami-Dade County | Permit required | only one utility shed up to 400 sq ft permitted per residential lot under County Code Section 33-20(k) |
| Orange County | Permit required | structures 120 sq ft or less require a zoning permit; structures over 120 sq ft require a full building permit with engineered plans |
| Palm Beach County | Permit required | Accessory storage enclosures (sheds) up to 6 ft x 6 ft x 6 ft high, for single-family dwellings only, qualify for a Type 1 Site Plan Review Permit (zoning review only, no Building Code plan review or inspection); sheds larger than that footprint or height require a standard Type 2(A) Building Permit with plan review and inspections. |
| Pasco County | It depends | Sheds of 150 square feet or less are exempt only if approved by and on file with the Florida DBPR Manufactured Building Program, with tie-downs installed and setbacks met, and not in a special flood hazard area. |
| Pinellas County | It depends | sheds under 100 sq ft and no taller than 10 ft, not connected to utilities, need no permit; sheds 100 sq ft or larger, taller than 10 ft, or connected to utilities require a building permit |
| Polk County | It depends | Prefabricated reach-in storage structures of closet use are exempt only up to 5 ft mean height, 50 sq ft area and 250 cubic ft with no electrical or plumbing; all larger or walk-in structures require a permit. |
Closest shed permit thresholds outside Florida
Jurisdictions we cover whose limit sits nearest Hillsborough County's 150 sq ft.
- Chicago, Illinois, single-story detached tool or storage shed under 150 sq ft and not more than 15 ft tall with no plumbing does not require a permit
- Boston, Massachusetts, one-story detached accessory sheds used for tools or storage are exempt if floor area does not exceed 120 sq ft
- Chandler, Arizona, One-story detached accessory structures (storage sheds, open-air ramadas) with floor area of 120 sq ft or less and height of 7 ft or less (up to 9 ft with 2 additional feet of setback per additional foot of height) are exempt if not connected to any electrical, gas, or water utility; exceeding either limit or connecting a utility requires a building permit.
- Houston, Texas, one-story detached accessory structure under 120 sq ft does not require a permit
How to apply in Hillsborough County
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Hillsborough County Development Services sets the exact checklist for Hillsborough County.
Where to apply in Hillsborough County:
Hillsborough County Development Services
- 601 E. Kennedy Blvd., Tampa, FL 33602
- Phone: (813) 272-5600
- Email: permitting@hcfl.gov
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Hillsborough County permit portal or by phone at (813) 272-5600.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Hillsborough County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: sheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit. Usually needed: Before building any shed 150 sq ft or larger.
- Budget the fee. Residential Misc Projects fee of $380 flat covers sheds and includes a $50 application fee; sheds and greenhouses under 150 square feet need no permit per the Work Exempt from Permits page, per Building Permit Fee Schedule effective October 5, 2024. Official fee schedule.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Hillsborough County permit portal.
- Keep the office details handy. Hillsborough County Development Services. Phone: (813) 272-5600. Address: 601 E. Kennedy Blvd., Tampa, FL 33602.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Hillsborough County
In 2024, Hillsborough County authorized permits for 9,053 new residential housing units (4,402 single-family, 4,651 in multi-family buildings), valued at $2.2B, down from12,716 the year before. That works out to about 5.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 1,581,426.
About Hillsborough County
Hillsborough County has about 618,220 housing units. The median home is valued at $333,300, against a median household income of $75,011. About 61% of homes are owner-occupied, and the typical home was built around 1990.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a shed permit in Hillsborough County?
- Residential sheds and greenhouses under 150 square feet are exempt from building permits in Hillsborough County. Sheds 150 square feet or larger require a Residential Miscellaneous Building permit and professionally signed and sealed plans. Applications are submitted through the HillsGovHub online portal. This applies to unincorporated Hillsborough County. Sheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit. Always confirm with the office before starting.
- How much does a shed permit cost in Hillsborough County?
- Residential Misc Projects fee of $380 flat covers sheds and includes a $50 application fee; sheds and greenhouses under 150 square feet need no permit per the Work Exempt from Permits page, per Building Permit Fee Schedule effective October 5, 2024. See the official fee schedule for current amounts.
- Where do you apply for a shed permit in Hillsborough County?
- You can apply through the Hillsborough County permit portal or contact the Hillsborough County Development Services directly. The links are listed on this page.
From the Library
What else needs a permit in Hillsborough County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Residential Misc Projects permit fee is $380 flat, covers decks, sheds, carports and po... |
| Electrical Permit | Permit required | Not specified | Residential Electrical (General) trade permit fee is $130 flat for inspection-only work... |
| Fence Permit | It depends | PVC wood and chain-link fences are exempt; electrical or concrete fences require a permit | No fence line item in the fee schedule; |
| HVAC Permit | Permit required | Not specified | Residential Mechanical (General) and HVAC Equal Change Outs trade permit fee is $130 fl... |
| Patio Permit | It depends | open concrete slabs may be exempt; screen enclosures and covered patios require a permit | Not published |
| Plumbing Permit | Permit required | Not specified | Residential Plumbing (General) trade permit fee is $130 flat, inspection-only with no p... |
| Pool Permit | Permit required | Not specified | Residential in-ground Pool/Spa permit fee is $475 flat, or $150 flat for an above groun... |
| Roof Replacement Permit | It depends | permit required when more than 25 percent of total roof area is replaced or recovered in a 12-month period; separately, under F.S. 553.79(1)(g) (HB 803, ch. 2026-63, effective 2026-07-01), work valued at less than $7,500 on a single-family dwelling qualifies for exemption upon a written exemption request with documentation of the nature and value of the work; the exemption excludes electrical, plumbing, structural, mechanical, and gas work and any property in a flood hazard area; the statute does not name roofing, so a non-structural reroof under that value can qualify; confirm with Hillsborough County Development Services. | Residential Roofing trade permit fee is $250 flat, inspection-only single-trade permit... |
| Solar Permit | Permit required | Not specified | Residential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan re... |
Shed Permit in other Florida localities
Official sources
- https://hcfl.gov/businesses/permits-and-records/permits/work-exempt-from-permits
- https://hcfl.gov/businesses/hillsgovhub/residential-and-mobile-home-checklists/residential-accessory-structure-requirements
- https://calhouncounty.sc.gov/sites/calhouncounty/files/Documents/Calhoun%20County/Departments/Building%20and%20Planning/2018IRC/2018%20IRC%20Building%20Guide_Accessory%20Structure.pdf
- https://www.botetourtva.gov/DocumentCenter/View/739/Accessory-Structure-Guide-pdf
- https://www.flsenate.gov/laws/statutes/2023/553.73
Verified by a person against the sources above on 2026-06-18, not confirmed with Hillsborough County Development Services. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Florida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 · 2026-07-25
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 · 2026-07-25
Compare
Shed Permit across Florida