Shed Permit in Lake County, Florida
It depends
Sometimes, depending on the project
Before installing a tool or storage shed over 120 square feet, one with electrical/HVAC/plumbing, or one not built by the owner on their own residence, in unincorporated Lake County
Quick answer
Lake County exempts a one-story detached tool or storage shed from needing a building permit only when it is built by the property owner on the owner's own personal residence, has a footprint of 120 square feet or less, and has no electrical, HVAC, fuel gas, or plumbing. A shed exceeding any of those conditions, including one installed by a contractor, goes through the county's Residential Accessory Structure permit process. This applies to unincorporated Lake County; the cities of Clermont, Leesburg, Eustis, Mount Dora, Tavares, and other incorporated municipalities in the county run their own building departments.
- Typical threshold
- A shed built by the property owner on the owner's own personal residence, with no electrical, HVAC, fuel gas, or plumbing, is exempt from a building permit up to a 120-square-foot footprint
- Issued by
- Office of Building Services
- Phone
- 352-343-9653
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What your shed permit must meet in Florida
Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.
- As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
- Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
- Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).
Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a shed permit costs in Lake County
- Fee schedule in force
- Official scheduleRead .
No shed-specific line item is published in the FY 2026 Adopted Fee Schedule;
a shed that exceeds the exemption is filed as a Residential Accessory Structure permit (checklist CL1), which the schedule does not price as a separate itemized rate.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Lake County compares in Florida
Across the Florida jurisdictions we have verified, the same threshold runs from 68 to 150, so a project that is exempt here may still need a permit one county over.
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | It depends | area of a single storage shed, exemption available once per property |
| Brevard County | It depends | A permit is required for an accessory structure (shed) over 100 square feet. |
| Charlotte County | It depends | A building permit is not required for plastic or rubber manufactured type sheds 68 square feet or less in area, though they must comply with zoning setbacks and be moved and secured if there is the threat of a tropical storm. |
| Escambia County | It depends | A portable, skid-mounted utility shed under 120 square feet does not require a permit; any utility shed with a poured slab or a post installed into the earth requires a permit regardless of size. |
| Hernando County | It depends | Sheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met |
| Hillsborough County | It depends | sheds less than 150 sq ft are exempt; sheds over 150 sq ft require a building permit; the county pages do not clearly place a shed of exactly 150 sq ft |
| Lake Countythis page | It depends | A shed built by the property owner on the owner's own personal residence, with no electrical, HVAC, fuel gas, or plumbing, is exempt from a building permit up to a 120-square-foot footprint |
How to apply in Lake County
General guide, not specific to this office
What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Office of Building Services
- 320 W. Main St., Tavares, FL 32778 (mailing: P.O. Box 7800, Tavares, FL 32778)
- Phone: 352-343-9653
- Email: permitting@lakecountyfl.gov
Your Shed Permit checklist for Lake County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: A shed built by the property owner on the owner's own personal residence, with no electrical, HVAC, fuel gas, or plumbing, is exempt from a building permit up to a 120-square-foot footprint. Read the rule where we read it: lakecountyfl.gov: building services.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Lake County permit portal.
- Keep the office details handy. Office of Building Services. Phone: 352-343-9653. Email: permitting@lakecountyfl.gov. Address: 320 W. Main St., Tavares, FL 32778 (mailing: P.O. Box 7800, Tavares, FL 32778).
Compiled from the official sources on this page. Last checked .
Permitting activity in Lake County
In 2025, Lake County authorized permits for 5,342 new residential housing units (3,999 single-family, 1,343 in multi-family buildings), valued at $1.5B, up from 4,990 the year before. That works out to about 11.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 456,068.
What else needs a permit in Lake County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | A deck built by the property owner on the owner's own personal residence is exempt from a building permit if it does not exceed 30 inches above grade and a 120-square-foot footprint | See schedule |
| Electrical Permit | Permit required | Any size | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest |
| Fence Permit | It depends | Masonry or concrete fences 4 feet or less in height, and fences of any other material 6 feet or less in height, are exempt from a building permit under the county's Chapter 6 building-code amendment | See schedule |
| HVAC Permit | Permit required | Any size | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest |
| Plumbing Permit | Permit required | Any size | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest |
| Pool Permit | It depends | Storable swimming or wading pools capable of holding water to a maximum depth of 42 inches, or pools with nonmetallic molded polymeric or inflatable fabric walls regardless of dimension, are exempt from a building permit except for non-cord-and-plug electrical work | Private Above-ground Swimming Pools or self contained spa (includes electric): $91.00 |
| Roof Replacement Permit | Permit required | Any size | Residential Roofing (per square foot): $0.03, per the county's FY 2026 Adopted Fee Schedule (Office of Building Services) |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a shed permit in Lake County?
- It depends on the project. A shed built by the property owner on the owner's own personal residence, with no electrical, HVAC, fuel gas, or plumbing, is exempt from a building permit up to a 120-square-foot footprint. If you are unsure how that applies to your project, call the Office of Building Services at 352-343-9653 before you start.
- How much does a shed permit cost in Lake County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 13 Aug 2026. For the figure on your own project, call the Office of Building Services at 352-343-9653.
- Where do you apply for a shed permit in Lake County?
- You can apply through the Lake County permit portal or contact the Office of Building Services directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Lake County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Lake County applies this before you apply.
From the Library
Shed Permit in other Florida localities
Everything above, sourced
How this shed permit page for Lake County was verified. 2 official sources: lakecountyfl.gov, cdn.lakecountyfl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Office of Building Services. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page