Florida / Lake County

Solar Permit in Lake County, Florida

Permit required

Yes, a permit is required

Before installing a roof-mounted or ground-mounted residential solar system in unincorporated Lake County

Quick answer

Lake County publishes a Solar Residential Permit Checklist (CL21) requiring a Building Permit Application, construction plans, and (for ground-mounted systems) zoning clearance, under the county's general rule that erection, alteration, or installation work is not commenced without a building permit from the building official. No solar-specific exemption appears in the county's published exempt-work list. This applies to unincorporated Lake County; the cities of Clermont, Leesburg, Eustis, Mount Dora, Tavares, and other incorporated municipalities in the county run their own building departments.

Issued by
Office of Building Services
From an official source Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Florida Department of Business and Professional Regulation license active, and under which business name? Verify it on www.myfloridalicense.com.

Florida's owner-builder rule (F.S. 489.103(7)(a)-(c)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Lake County

Fee schedule in force
Official scheduleRead .

No solar/photovoltaic line item is published in the FY 2026 Adopted Fee Schedule;

the Office of Building Services publishes a dedicated Solar Residential and Solar Commercial Permit Checklist (CL21) for roof-mounted and ground-mounted systems, but the schedule does not itemize a separate solar rate.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Lake County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alachua CountyPermit requiredNo solar-specific flat fee is published
Brevard CountyPermit requiredSee schedule
Charlotte CountyPermit requiredAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge
Collier CountyPermit requiredSee schedule
Hernando CountyPermit requiredPhotovoltaic System (Res): $180.00
Hillsborough CountyPermit requiredResidential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review; the schedule has the rest
Lake Countythis pagePermit requiredSee schedule

How to apply in Lake County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Office of Building Services

Permitting activity in Lake County

In 2025, Lake County authorized permits for 5,342 new residential housing units (3,999 single-family, 1,343 in multi-family buildings), valued at $1.5B, up from 4,990 the year before. That works out to about 11.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 456,068.

What else needs a permit in Lake County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsA deck built by the property owner on the owner's own personal residence is exempt from a building permit if it does not exceed 30 inches above grade and a 120-square-foot footprintSee schedule
Electrical PermitPermit requiredAny sizeResidential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest
Fence PermitIt dependsMasonry or concrete fences 4 feet or less in height, and fences of any other material 6 feet or less in height, are exempt from a building permit under the county's Chapter 6 building-code amendmentSee schedule
HVAC PermitPermit requiredAny sizeResidential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest
Plumbing PermitPermit requiredAny sizeResidential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest
Pool PermitIt dependsStorable swimming or wading pools capable of holding water to a maximum depth of 42 inches, or pools with nonmetallic molded polymeric or inflatable fabric walls regardless of dimension, are exempt from a building permit except for non-cord-and-plug electrical workPrivate Above-ground Swimming Pools or self contained spa (includes electric): $91.00
Roof Replacement PermitPermit requiredAny sizeResidential Roofing (per square foot): $0.03, per the county's FY 2026 Adopted Fee Schedule (Office of Building Services)
Shed PermitIt dependsA shed built by the property owner on the owner's own personal residence, with no electrical, HVAC, fuel gas, or plumbing, is exempt from a building permit up to a 120-square-foot footprintSee schedule

Frequently asked questions

Do you need a solar permit in Lake County?
Yes, before installing a roof-mounted or ground-mounted residential solar system in unincorporated Lake County. If you are unsure how that applies to your project, call the Office of Building Services at 352-343-9653 before you start.
How much does a solar permit cost in Lake County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 13 Aug 2026. For the figure on your own project, call the Office of Building Services at 352-343-9653.
Where do you apply for a solar permit in Lake County?
You can apply through the Lake County permit portal or contact the Office of Building Services directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Lake County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Lake County applies this before you apply.

From the Library

Solar Permit in other Florida localities

Everything above, sourced

How this solar permit page for Lake County was verified. 2 official sources: lakecountyfl.gov, cdn.lakecountyfl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Office of Building Services. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project